| 1 | L1₹23.0 LAccepted-AOC | L1 | Accepted-AOC L1 ACCEPTED | |
| 2 | L2₹23.2 L+₹24,904.13 (1.08%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹23.3 L
EMD Value
₹23,300
Closing Date
1 Jul 2025, 3:00 pmClosed
Block Development officer, Ammapettai Union, Erode
Block Development office, Ammapettai Union, Erode
Repairs and Renovation of Chittar PUMS School building H.o Kesarimangalam panchayat.(8 Buildings in 1 Package)
2025_RDTN_572615_1
1636.2025.A2 Dated 23.06.2025 Chittar PUMS
Open Tender
Maintenance Works
Item Rate
90 days
Block Development office, Ammapettai Union
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹23,300
Yes
23 Jul 2025
23 Jun 2025
1 Jul 2025
23 Jun 2025
1 Jul 2025
23 Jun 2025
Amount
Name of the Work : Repair and Renovation of south facing 2-CR RCC building at PUMS-Chittar H/O Kesarimangalam, Ammapettai Panchayat Union of Erode District, under SIUS 2025-26
Chipping and removing the wall plastering including all cost and conveyance of all labour charges and materials etc complete.,
Plastering with Cement mortar 1:5 mix - 12 mm thick including all cost and conveyance of materials and labour charges etc., complete
Chipping and removing the cieling plastering including all cost and conveyance of all labour charges and materials etc complete.,
Plastering with Cement mortar 1:3 mix - 10 mm thick including all cost and conveyance of materials and labour charges etc., complete
White washing two coat over a priming coat approved painting inclusing all cost and conveyance etc complete to site
Oil bound Distembering one coat over a priming coat approved colour painting inclusing all cost and conveyance etc complete to site
Oil bound Distembering two coats over a priming coat approved colour painting inclusing all cost and conveyance etc complete to site
Exterior emulsion Two coat over a priming coat approved colour painting inclusing all cost and conveyance etc complete to site
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing 40mm thickness of cuddapah slab for cupboard including cost and conveyance of all materials to site and all labour charges etc., complete
Supplying and fixing of cupboard shutters including cost and conveyance of all materials to site and all labour charges etc., complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing 25mm thickness of cuddapah slab for cupboard including cost and conveyance of all materials to site and all labour charges etc., complete
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Chipping and removing the pressed tiled in all cost and conveyance of all labour charges and materials etc complete.,
Finshed with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Bala painting finishing over one coat of priming coat with good quality of paint inclusing all cost and conveyance etc complete to site
Provisions for Rain water Pipe Arrangements
Provision for Green fiber board including all cost and conveyance
Provision for String Pandal including all cost and conveyance
Provisions for writing name board
Name of the Work : Repair and Renovation of west facing 2-CR RCC building (South side) at PUMS-Chittar H/O Kesarimangalam, Ammapettai Panchayat Union of Erode District, under SIUS 2025-26
Supplying and fixing of cupboard shutters including cost and conveyance of all materials to site and all labour charges etc., complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing 25mm thickness of cuddapah slab for cupboard including cost and conveyance of all materials to site and all labour charges etc., complete
Chipping and Roughening the surface and cleaning away from site including all labour charges etc., complete
Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Bala painting finishing over one coat of priming coat with good quality of paint inclusing all cost and conveyance etc complete to site
Provisions for Rain water Pipe Arrangements
Provision for Green fiber board including all cost and conveyance
Provision for String Pandal including all cost and conveyance
Provisions for writing name board
Name of the Work : Repair and Renovation of west facing 2-CR RCC building (North side) at PUMS-Chittar H/O Kesarimangalam, Ammapettai Panchayat Union of Erode District, under SIUS 2025-26
Chipping and removing the wall plastering including all cost and conveyance of all labour charges and materials etc complete.,
Plastering with Cement mortar 1:5 mix - 12 mm thick including all cost and conveyance of materials and labour charges etc., complete
Chipping and removing the cieling plastering including all cost and conveyance of all labour charges and materials etc complete.,
Plastering with Cement mortar 1:3 mix - 10 mm thick including all cost and conveyance of materials and labour charges etc., complete
White washing two coat over a priming coat approved painting inclusing all cost and conveyance etc complete to site
Oil bound Distembering one coat over a priming coat approved colour painting inclusing all cost and conveyance etc complete to site
Oil bound Distembering two coats over a priming coat approved colour painting inclusing all cost and conveyance etc complete to site
Exterior emulsion Two coat over a priming coat approved colour painting inclusing all cost and conveyance etc complete to site
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Dismantling Plain cement concrete and cleaning away from site including all labour charges etc., complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete
Providing GI pipe for hand rail
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing 40mm thickness of cuddapah slab for cupboard including cost and conveyance of all materials to site and all labour charges etc., complete
Supplying and fixing of cupboard shutters including cost and conveyance of all materials to site and all labour charges etc., complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing 25mm thickness of cuddapah slab for cupboard including cost and conveyance of all materials to site and all labour charges etc., complete
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Chipping and removing the pressed tiled in all cost and conveyance of all labour charges and materials etc complete.,
Finshed with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm (Using Old tiles)
Finshed with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm (Using New tiles)
Bala painting finishing over one coat of priming coat with good quality of paint inclusing all cost and conveyance etc complete to site
Provisions for Rain water Pipe Arrangements
Provision for Green fiber board including all cost and conveyance
Provision for String Pandal including all cost and conveyance
Provisions for writing name board
Name of the Work : Repair and Renovation of east facing 3-CR RCC building at PUMS-Chittar H/O Kesarimangalam, Ammapettai Panchayat Union of Erode District, under SIUS 2025-26
Chipping and Roughening the surface and cleaning away from site including all labour charges etc., complete
Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete
Chipping and removing the cieling plastering including all cost and conveyance of all labour charges and materials etc complete.,
Plastering with Cement mortar 1:3 mix - 10 mm thick including all cost and conveyance of materials and labour charges etc., complete
Chipping and removing the wall plastering including all cost and conveyance of all labour charges and materials etc complete.,
Plastering with Cement mortar 1:5 mix - 12 mm thick including all cost and conveyance of materials and labour charges etc., complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing 40mm thickness of cuddapah slab for cupboard including cost and conveyance of all materials to site and all labour charges etc., complete
Supplying and fixing of cupboard shutters including cost and conveyance of all materials to site and all labour charges etc., complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing 25mm thickness of cuddapah slab for cupboard including cost and conveyance of all materials to site and all labour charges etc., complete
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Chipping and removing the pressed tiled in all cost and conveyance of all labour charges and materials etc complete.,
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finshed with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete
Bala painting finishing over one coat of priming coat with good quality of paint inclusing all cost and conveyance etc complete to site
Provision for Green fiber board including all cost and conveyance
Provision for String Pandal including all cost and conveyance
Provision for door & Window repair
Provisions for writing name board
Name of the Work : Repair and Renovation of west facing 3-CR RCC building at PUMS-Chittar H/O Kesarimangalam, Ammapettai Panchayat Union of Erode District, under SIUS 2025-26
Chipping and Roughening the surface and cleaning away from site including all labour charges etc., complete
Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete
Chipping and removing the cieling plastering including all cost and conveyance of all labour charges and materials etc complete.,
Plastering with Cement mortar 1:3 mix - 10 mm thick including all cost and conveyance of materials and labour charges etc., complete
Chipping and removing the wall plastering including all cost and conveyance of all labour charges and materials etc complete.,
Plastering with Cement mortar 1:5 mix - 12 mm thick including all cost and conveyance of materials and labour charges etc., complete
White washing two coat over a priming coat approved painting inclusing all cost and conveyance etc complete to site
Oil bound Distembering one coat over a priming coat approved colour painting inclusing all cost and conveyance etc complete to site
Oil bound Distembering two coats over a priming coat approved colour painting inclusing all cost and conveyance etc complete to site
Exterior emulsion Two coat over a priming coat approved colour painting inclusing all cost and conveyance etc complete to site
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Chipping and removing the pressed tiled in all cost and conveyance of all labour charges and materials etc complete.,
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finshed with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete
Chipping and Roughening the surface and cleaning away from site including all labour charges etc., complete
Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete
Providing GI pipe for hand rail
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing 40mm thickness of cuddapah slab for cupboard including cost and conveyance of all materials to site and all labour charges etc., complete
Supplying and fixing of cupboard shutters including cost and conveyance of all materials to site and all labour charges etc., complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing 25mm thickness of cuddapah slab for cupboard including cost and conveyance of all materials to site and all labour charges etc., complete
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Bala painting finishing over one coat of priming coat with good quality of paint inclusing all cost and conveyance etc complete to site
Provisions for Rain water Pipe Arrangements
Provision for Green fiber board including all cost and conveyance
Provision for String Pandal including all cost and conveyance
Provisions for writing name board
Name of the Work : Repair and Renovation of boys toilet at PUMS-Chittar H/O Kesarimangalam, Ammapettai Panchayat Union of Erode District, under SIUS 2025-26
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Provision for Cuddapah slab of 40mm thick for urinal partition (0.45 x 1.00 m)
Provision for wash basin (1 Nos)
Provision for door (1 Nos)
Provision for PVC water tank (250 lit)
Provision for PVC pipes for water supply arrangements
Provisions for writing name board
Name of the Work : Repair and Renovation of girls toilet at PUMS-Chittar H/O Kesarimangalam, Ammapettai Panchayat Union of Erode District, under SIUS 2025-26
Distempering the old walls and ceiling two coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Chipping and removal of cement plaster from walls including all labour charges etc complete.
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Provision for wash basin (1 Nos)
Provision for toilet door (2 Nos)
Provisions for writing name board
Name of the Work : Repair and Renovation of boys toilet at PUMS-Chittar H/O Kesarimangalam, Ammapettai Panchayat Union of Erode District, under SIUS 2025-26
Chipping of plastering from wall surface and cleaning away from site including all labour charges etc., complete
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Distempering the old walls and ceiling two coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Provision for wash basin (2 Nos)
Provision for urinal pan - 3 nos
Provision for door repair
Provisions for writing name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
KVMR CONSTRUCTIVE CREATOR (BID ID -1387189)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .