Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 CrAdmitted-Finance 20 SC BOSE COLONY GALI NO 02 DEFENCE LAB ROAD RATNADA JODHPUR 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | L1 | Admitted-Finance | |
| 2 | L2₹24.9 Cr+₹21.6 L (0.87%)Admitted-Finance M 11 22 BADLI IND ESTATE DELHI 110042 | DELHI | NORTH DELHI | DELHI | 110042 | L2 | Admitted-Finance | |
| 3 | L3₹26.1 Cr+₹1.5 Cr (5.91%)Admitted-Finance 101 VRAJ APARTMENT OPP POLICE HEAD QUARTER SARU SECTION ROAD JAMNAGAR 361008 | JAMNAGAR | JAMNAGAR | GUJARAT | 361008 | L3 | Admitted-Finance | |
| 4 | L4₹30.5 Cr+₹5.9 Cr (23.9%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Admitted-Finance PLOT NO 13 3RD FLOOR BANSAL PLAZA SECTOR 6 COMMERCIAL COMPLEX DWARKA NEW DELHI 110075 | NEW DELHI | NEW DELHI | DELHI | 110075 | - | Admitted-Finance |
| Sl No | Description | Qty | Unit | M K ENGINEERS CO. L1 | M/s SK Traders L3 | Allied Engineering Works Limited L2 | M/S RADIUS SYNERGIES INTERNATIONAL PVT LTD | MD TRANSCON PRIVATE LIMITED L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00NOTES APPLICABLE FOR ALL ITEMS OF WORK OF SCHEDULE "A":- (i) The bidder shall take all safety measures required for working in high rise buildings as specified in the latest addition of National Building Code (amended up to date), relevant BIS (Bureau of Indian Standards), relevant Indian standards and as specifies in local by laws, and labour laws etc. all as specified and directed by Engineer-in-Charge. (ii) The Old Materials retrieved from dismantling / replacement / taking down and disconnections etc. should be deposited to MES store yard of concerned GE and same shall be taken on charge. The record of Old unserviceable / serviceable materials shall be maintained and kept on record. These records shall be produced during payment to the contractor as and when required by Nodal Officer. Transportation, Labours for loading and unloading for the same upto the MES storeyard from the site location deemed to be inclusive in the quoted rates and nothing extra shall be paid to the contractor. (iii) The detailed GE wise quantity for BOQ Sr Item No. 1.00 to 22.00 are enclosed with tender pages as Appx "G" and form part of the tender document . In case of any variation in qty during execution beyond permissible limit, contractor shall inform the concerned GE and same shall be intimated to Nodal GE to maintain overall quantity variation within permissible limit. | ||||||||
| 1.01 | Disconnecting and taking down old pattern single/three phase energy meters from meter panel/ wall complete all as specified and as directed.
Note:- Last meter reading shall be noted by contractor before dismentling/taking down and submitted to concerned BSO and AGE E/M. | 20,266 | Each | 300 ₹60,79,800 | 302 ₹61,20,332 | 200 ₹40,53,200 | - | 141.6 ₹28,69,665.6 Lowest |
| 2.00 | "Supply, Install, Testing,Commissioning and integration of Smart Meters of different makes not more than 33% of particular make to ensure interchangeability at a later date as per BIS 16444 with communication technology including cellular/ RF/ Hybrid [Cellular+RF] AC whole current, Single phase, Smart Energy Meter of rating 10-60 Amps complete as per specifications, meter shall have the ability to communicate with Head End System (HES) on any one of the communication technologies mentioned in IS 16444 Part I (RF/Cellular) in a secure manner, in case of Cellular based meter, the meter shall accommodate e-SIM/SIM of any service provider, the Smart Meters shall have a dedicated sealable slot for accommodating plug-in type, bi -directional communication module which shall integrate the respective communication technology (RF/PLC/ Cellular) with the Smart Meters, leading to easy adaptability for network interfaces (WAN/NAN), the Plug-In module shall be field swappable/ replaceable complete all as specified and directed.
Note:-
a) Meter Specification may please be read in co-junction with PS clause.
b) The contractor shall be responsible for removing the existing meter, noting down the reading building wise and depositing it with the department
c) The meter shall be fixed either in existing metering kiosk or new polycarbonate cover. Where meter is fixed in new polycarbonate cover, same shall be measured and paid separately. However if meter is installed in the existing metering kiosk or panel, any other requirement to fix the smart meter is inclusive in the quoted rates including provision of all hardware items | 18,723 | Each | 4,350 ₹8,14,45,050 Lowest | 5,501 ₹10,29,95,223 | 5,600 ₹10,48,48,800 | - | 6,438.55 ₹12,05,48,971.65 |
| 3.00 | Supply, Install, testing,Commissioning and integration of Smart Meters of different makes not more than 33% of particular make to ensure interchangeability at a later date as per BIS 16444 with communication technology including cellular/ RF/ Hybrid [Cellular+RF], AC whole current, three phase, Smart Energy Meter of rating 10-60 Amps complete as per specifications. Meter shall have the ability to communicate with Head End System (HES) on any one of the communication technologies mentioned in IS 16444 Part I (RF/Cellular) in a secure manner, in case of Cellular based meter, the meter shall accommodate e-SIM/ SIM of any service provider, the Smart Meters shall have a dedicated sealable slot for accommodating plug-in type bi-directional communication module which shall integrate the respective communication technology (RF/PLC/ Cellular) with the Smart Meters, leading to easy adaptability for network interfaces (WAN/NAN), the Plug-In module shall be field swappable/ replaceable complete all as specified and directed.
Note: a) Meter Specification may please be read in co-junction with PS clause.
b) The contractor shall be responsible for removing the existing meter, noting down the reading building wise and depositing it with the department
c) The meter shall be fixed either in existing metering kiosk or new polycarbonate cover, same shall be measured and paid separately. However if meter is installed in the existing metering kiosk or panel, any other requirement to fix the smart meter is inclusive in the quoted rates including provision of all hardware items. | 1,474 | Each | 6,700 ₹98,75,800 Lowest | 7,926 ₹1,16,82,924 | 7,240.68 ₹1,06,72,762.32 | - | 8,161.82 ₹1,20,30,522.68 |
| 4.00 | Supply ,Install,testing,commissioning and integration of 3 phase,4 wire 3x240V, -/5A current transformer operated cellular based AC static energy meter confirming to IS-16444 of accuracy class 0.5s and two way communication with Head end system(HES) complete with all accessories for efficient and trouble free operation with IP-54 metering kiosk alongwith complete control wiring comprising of the followings:
(a) Metering box made out of 2.0 mm thick CRCA powder coated sheet comprising of main MCCB incomer of rating 200 Amp 25KA,3P+N bus bar system of rating 250 amp ,cable terminal points. (b) Low Voltage Current Transformer IEC 61869-1 and 2 Compliant, Epoxy resin Material Body, Current Ratio 200/5A, 0.5S Metering accuracy Class, Required VA burden should be 5VA or More, Suitable for 415 V 50Hz system, Insulation class should be E, Suitable for Indian Ambient Temperature Conditions upto 45 degree celsius, Make should be reputed Manufacturer. (c) AC Three Phase Four Wire, Tamper Proof, Static Meter of Class 0.5S, 415 V, 50 Hz, 5A input current, anti-tamper features. Kiosk should have smart window with toughened glass to view the meter reading. Meter Should support 15 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency.
Note: Contractor shall ensure the cable termination with proper lugs and cable glands. | 71 | Each | 46,000 ₹32,66,000 | 18,034 ₹12,80,414 | 12,434 ₹8,82,814 Lowest | - | 22,888.22 ₹16,25,063.62 |
| 5.00 | Supply, Install, testing, commissioning and integration of 3 phase,4 wire 3x240V, -/5A current transformer operated cellular based AC static energy meter confirming to IS-16444 of accuracy class 0.5s and two way communication with Head end system(HES) complete with all accessories for efficient and trouble free operation with IP-54 metering kiosk alongwith complete control wiring comprising of the followings:
(a) Metering box made out of 2.0 mm thick CRCA powder coated sheet comprising of main MCCB incomer of rating 400 Amp 35KA,3P+N bus bar system of rating 500 amp ,cable terminal points. (b) Low Voltage Current Transformer IEC 61869-1 and 2 Compliant, Epoxy resin Material Body, Current Ratio 200/5A, 0.5S Metering accuracy Class, Required VA burden should be 5VA or More, Suitable for 415 V 50Hz system, Insulation class should be E, Suitable for Indian Ambient Temperature Conditions upto 45 degree celsius, Make should be reputed Manufacturer. (c) AC Three Phase Four Wire, Tamper Proof, Static Meter of Class 0.5S, 415 V, 50 Hz, 5A input current, anti-tamper features. Kiosk should have smart window with toughened glass to view the meter reading. Meter Should support 15 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency. Note: Contractor shall ensure the cable termination with proper lugs and cable glands. | 13 | Each | 55,000 ₹7,15,000 | 18,034 ₹2,34,442 | 12,434 ₹1,61,642 Lowest | - | 24,304.22 ₹3,15,954.86 |
| 5.01NOTE FOR SERIAL ITEM No.2, 3, 4 & 5: (i) 15 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, monthly billing survey for cumulative energy and max demand of software. (ii) Meter should have connect/disconnect functionality operatable from MDM/billing software and prepaid features would be configuired in MDM/billing end as per prevalent IS and applicable tariff plan (iii) Meter should support communication protocol through RF [4G/5G/NB/IOT] with the software all as required at site and directed [cost of 4G /5G/NB IOT SIM, mapping vending portal charges etc., deemed to included the unit rate quoted for meter] (iv) Two way communication with DCU/HES (v) Clock synchronisation facility with HES [Head end system] (vi) In case of RF, communication including different makes of meter shall be such that it should communicate with same DCU directly via mesh network. (vii) The contractor shall keep sufficient No of smart meters [minimum 1% including accessories at each station through out the defect liability and guarantee period of 10 [ten years] in reserve for immediate replacement in case of any faulty meters to ensure zero downtime | ||||||||
| 5.02(viii) The contractor shall carryout comprehensive survey and submit his report through respective GE for the communication technologies being proposed for the all areas and shall take an Approval from the department. The decision of the Accepting Officer with respect to the communication technology shall be final and binding. (ix) Guarantee of meters shall be 10 years from date of completion of Phase-I. The amount of security deposit for smart meter guarantee shall be 2.5% of the amount of smart meter at contract rates and shall be retained by the department from contractors dues. The amount shall be released after successful expiry of the guarantee period provided always that the contractor shall first have been paid the final bill and have rendered '' No Demand Certificate''(IAFW-451)''. The contractor may however , furnish a fixed deposit receipt in lieu, from a schedule bank pledge in favour of Garrison Engineer (Nodal Officer) for the period of guarantee in which case the amount if any, deducted from the dues /final bill shall be refunded. (x) The cost of meter shall include DCU/ repeater cost in case of RF communication meters. (xi) The OEM shall need to share the Authentication / Encryption keys of the meters along with relevant protocol details with the department. (xii) A training to handle the smart meter to MES tradesmen shall also be given by professionals. (xiii) The rate quoted shall also include any other materials which are necessary for smooth functioning of smart prepaid meter system and not mentioned here in this item (xiv) Remote server having prepaid engine and web base prepaid application with all the vending stations functionalities are hosted on remote server at MES Data Centre under GE NB Vishakhapattnam. The contractor is responsible for updation of remote server. The rate quoted shall be inclusive of updating all data & integration of all the meter with central server, establishing and maintaining of communication between meter and server, Application server, Communication (Data + SMS) , Prepaid metering solutions training etc. (xv) Smart meter to be used shall generally be cellular based, however where cellular network not available RF based meter along with DCU to be installed. Cost of DCU shall be deemed to be included in quoted rate. | ||||||||
| 5.03(xvi) Any configuration in smart meter if required to achieve compatibility with existed Data Centre/Server to be carried out by contractor as per site conditions and cost of the same included in quoted rate. (xvii) The meter initially installed after dismantling of old meter should run on normal mode on postpaid basis till the system is connected with AMI of MES data centre for online system so that there should not be any loss of revenue. The meter reading during the above intervening period shall be taken as per the existing arrangement by the BSO. | ||||||||
| 6.00 | Supply, install, testing and commissioning of Operator Workstation and Revenue Kiosk Consisting of the following : a) Operator Workstations PC, Intel I7 13th Gen and above 32 GB Ram, 2TB HDD, Windows 10 Professional Preloaded , MS office Preloaded, 1 GB dual Ethernet ports Minimum Two Nos of USB Ports, AC Power Supply, 24” wide screen (16:9 aspect ratio), HD Resolution (1920x1080) LED Colour monitor keyboard & optical mouse. Each PC shall provided with 1 KVA UPS with 15 mins Backup, Desktop mounting complete all as specified. Make: HP/DELL/LENOVO - 01 No
(b) Revenue kiosk PC work station, Intel i7
13th Gen and above 32GB RAM, 2TB HDD, Windows 10 Professional Preloaded , MS office Preloaded, 1 GB dual Ethernet ports Minimum Two Nos. of USB Ports, AC Power Supply, 24” wide screen (16:9 aspect ratio), HD Resolution (1920x1080) LED Colour monitor keyboard & optical mouse. Each PC shall provided with 1 KVA UPS with 15 mins Backup,Desktop mounting complete all as specified.
Make: HP/DELL/LENOVO -01 No
c) Tab 10 inch LED display with 4GB RAM and memory with 64 GB . Tab shall be provided with customer portal app and connected with Wi Fi network . OS for Tab shall be latest android version-01
d) Printers - Color Laser A4 Size Duplex Printer with Wifi support
Print Speed, Single sided : Up to 38 ppm (A4)
Double sided : Up to 38 ppm (Cassette), 21 ppm (Multi Purpose Tray)
Printing Method: Colour laser beam printing
Print Resolution :Up to 1200 x 1200 dpi- 1no with all connected accessories- 1 Set
Note: 1. Internet connection in the name of concerned GE shall be arranged by the contractor for working of the entire system. 2. The entire system of prepaid metering shall be activated on the above system by the contractor with the help of site executives and MES data centre at Vishakhapatnam." | 11 | Job | 4,77,000 ₹52,47,000 | 4,10,548 ₹45,16,028 Lowest | 18,13,770 ₹1,99,51,470 | - | 9,48,720 ₹1,04,35,920 |
Tender Value
₹47.3 Cr
EMD Value
₹15 L
Closing Date
19 Aug 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer (Navy) Mumbai
HQ Chief Engineer (Navy) Mumbai, Shahid Bhagat Singh Marg, Colaba, Mumbai - 400005
SPECIAL REPAIRS TOWARDS REPLACEMENT OF ALL EXISTING METERS WITH SMART PREPAID METERS INCLUDING SERVER AT AOR OF CE NAVY MUMBAI
2026_MES_775604_1
87981/E8
Open Tender
Civil Works
Item Rate
365 days
Colaba
Please refer Tender Documents
9 documents required · 9 mandatory
₹3,000
Garrison Engineer (NW) Navy Nagar
₹15 L
Yes
HQ Chief Engineer (Navy) Mumbai
2 Nov 2026
1 Jul 2026
21 Aug 2026
1 Jul 2026
19 Aug 2026
5 Aug 2026
1 Jul 2026 - 17 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 84001 | - | 0.0000 | - | - |
| 284002 | |||||
| 384003 | |||||
| 484004 | |||||
| 584005 | |||||
| 684006 | |||||
| 719473A | |||||
| 819485A | |||||
| 919250C | |||||
| 1019247C | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_868510.xls
BOQ • 12.36 MB
87981TenderPages.pdf
Tender Documents • 2.61 MB
87981TenderAmendment10Aug2026.pdf
PDF • 0.07 MB
87981TenderAmendment04Aug2026.pdf
PDF • 0.38 MB
87981DateAmendment31Jul2026.pdf
PDF • 0.04 MB
87981TenderAmendment27Jul2026.pdf
PDF • 0.13 MB
87981DateAmendment27Jul2026.pdf
PDF • 0.03 MB
87981TenderAmendment25Jul2026.pdf
PDF • 0.12 MB
87981DateAmendment25Jul2026.pdf
PDF • 0.03 MB
87981TenderAmendment23Jul2026.pdf
PDF • 0.12 MB
87981DateAmendment21Jul2026.pdf
PDF • 0.03 MB
87981TenderAmendment21Jul2026.pdf
PDF • 0.93 MB
87981DateAmendment20Jul2026.pdf
PDF • 0.03 MB
87981TenderAmendment20Jul2026.pdf
PDF • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .