| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹11,250
Closing Date
19 Jan 2023, 3:00 pmClosed
SEOPERATONNORTHCNI
230kv Korattur SS Campus,Chennai-80
ERECTION OF 230KV HYBRID GIS BUS COUPLER MODULE DISMANTLING OF EXISTING BUS COUPLER SWITCH AT KOYAMBEDU 230KV SS
2022_EB_270118_1
E06/22-23/SE/O/N/CNI
Open Tender
Electrical Works
Works
30 days
230KV Koyambedu SS
As per the tender documents
2 documents required · 2 mandatory
₹0
₹11,250
Yes
17 Nov 2023
6 Dec 2022
20 Jan 2023
6 Dec 2022
19 Jan 2023
15 Dec 2022
7 Dec 2022 - 12 Dec 2022
Amount
CIVIL PORTION : Demolition of RCC support structure of existing 230kV Disconnector switch and complete erection of foundation plinth and cable trench for 230kV hybrid GIS bus coupler module
Earth work excavation for foundation including all labour charges including initial lead, lift, etc complete
Hard Gravelly soil SS 20B
Supplying and filling M sand for foundation and basement including watering and consolidation in 15 cm layers including cost of sand all labour lead lift etc, complete
PCC 1:4:8, using 12 to 20mm HBG metal for foundation without form work including cost of cement, all materials, labour, lead, lift, etc, complete
RCC M 20 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. (without formwork)
RCC M 20 mix using 12-20mm graded hard machine broken granite stone, including cost of all mateials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement- (with formwork)
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete
Plastering with cm 1.:5, 12mm thick for walls including cost of cernent, all materials,curing, labour, lead and lift etc. complete
Painting two coats wifh approved quantity White distember over a waterbase primer as priming coat, for interior ceiling and surfaces including cleaning the plastered surface, cost of all materials, labour, lead, lift, T&P, etc. complete
Dismantling of the existing RCC switch & cable duct structure including all lead, lift etc., complete
Supplying and fabrication of Foundation bolt with various sizes of required length including threading with 2 nos of GI nuts and washers and fixing in the position as directed by the Engineer at site including assembling of template etc,, cost of template, all material, labour, lead, lift etc., complete
Providing Grout holes for equipment structures including cost of all materials, form work , labour, lead, lift etc. complete
Fabrication of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc, complete,as directed by the dept. Engineer at site
Transpoting the surplus excavated earth, debris etc away from the site to a lead of 5km including cost of all lead, lift, conveyance, loading, unloading etc.complete
ELECTRICAL PORTION : Dismantling of existing 230kV Disconnector switch and complete erection of 230kV hybrid GIS bus coupler module and providing assistance during testing and commissioning
Labour charges for dismantling of 230KV AB Switch motor operated (without earth) excluding structure
Labour for dismantling of dropper and jumper
Labour for dismantling of 230KV single pole stack
Labour for providing of dropper and jumper
Labour for erection of earth bore, earthmat & earth raisers (equipment earthing) including cost of materials
Supply of MS Flat various size for earthmat & earth raisers (65x10mm, 50x8mm etc,) including cost of transport & other incidental charges as directed by the Dept. Engineer at site
Supply of earth electrode 6m length, 40mm dia MS Rod including cost of transport & other incidental charges as directed by the dept. Engineer at site
Labour charges machineries, consumables for fabrication of earth electrode 10mtr/ 6mtr length or as directed by the Field Engineer
Labour charges machineries, consumables for erection of earth mat and earth raisers, as directed by the field engineer at site
Providing 140/150mm dia bore including, labour, lead, lift, etc., complete mobilization in all types of soil and erection of earth electrode, supply and providing A4 Grade bentonite powder with 5% common salt mixed with available site clay soil with water 5 kg/m depth in earth bore and pouring water and tightening of earth bore, upto satisfactory earth as directed by the field Engineer it site,
Labour for excavation and refilling of trench of avg. width of 0.3m & avg. depth of 0.8m for earth mat and avg. depth of 0.4m for laying of cable below fixed yard level and any of size as required as directed by the field Engineer
Labour charges for painting earth raisers by green enamel painting and wherever required including cost of paint (Dulex, Asian Berger perferred) and other consumables as directed by the field Engineer
Supply and providing of 600mm mean dia, 300mm height 36mm thick cement collar for identification of earth electrode location including 1 primer and 2 coats of colour wash as directed by field Engineer
Supply and provision of M10, M12 & M16 full thread GI bolt, nuts & GI washer of various size for erection of insulator or any other purpose wherever required and as directed by the field Engineer
Labour for erection of panel /battery charger
Labour for laying of cable and clamping in structure
Upto 8 core
Above 8 core
Supply and glanding of ISI mark cable glands of suitable size of reputed make including removing insulation of cable and providing suitable holes as directed by the field Engineer
Supply and termination of cable core end including cost of cable socket, lug, ferrules, strap etc, as per cable schedule and as directed by the field Engineer
Labour for erection, testing and Commissioning of 230KV HGIS Bay - Bus coupler bay (Complete shape) with control cable & terminal connectors using crane, including wiring at control cubical, C&R panel & busbar protection panel, evacuation, gas filling, including other incidental charges & providing man power for tesing whereever required as directed by the field engineer at site
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .