Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC | L1 | Accepted-AOC L1 Accepted | |
| 2 | L2₹13.2 L+₹47,273 (3.71%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹14.0 L+₹1.2 L (9.54%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹14.0 L+₹1.3 L (10.1%)Rejected-Finance NOT FOUND | L4 | Rejected-Finance Rejected | |
| 5 | L5₹14.3 L+₹1.6 L (12.3%)Rejected-Finance AT CHHANAGIRI PO CHHANAGIRI PS KHORDHA DIST KHORDHA PIN 752020 | CHHANAGIRI | KHORDHA | ODISHA | 752020 | L5 | Rejected-Finance Rejected |
Tender Value
₹14.3 L
EMD Value
₹14,325
Closing Date
12 May 2026, 5:00 pmClosed
DPC SS Khordha
DPC SS Khordha
Construction of One no. Additional Classroom At Govt Primary School Kotasinga Bolgarh
2026_OPEPA_128506_2
02/CW/SS/2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
DPO Khordha
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹14,325
Yes
2 Oct 2026
28 Apr 2026
13 May 2026
28 Apr 2026
12 May 2026
28 Apr 2026
28 Apr 2026 - 11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in hard soil in foundation in cluding initial lead and 1.5 m. initial lift including cost, conveyance taxes of all materials etc complete as per direction of the Engineer-in-charge | 54.4 | Cum | 276.88 | ₹15,062.27 |
| 2 | Sand Filling in foundation & plinth with approved river sand well watered and rammed including cost, conveyance taxes of all materials etc complete as per direction of the Engineer-in-charge | 62.06 | Cum | 1,120.14 | ₹69,515.89 |
| 3 | Plain cement concrete (1:3:6) using 40mm BHG metal (crusher broken) well rammed including cost, conveyance taxes of all materials etc complete as per direction of the Engineer-in-charge | 7.3 | Cum | 5,943.95 | ₹43,390.84 |
| 4 | Plain cement concrete (1:4:8) using 40mm BHG metal (crusher broken) well rammed including cost, conveyance taxes of all materials etc complete as per direction of the Engineer-in-charge | 7.21 | Cum | 5,569.12 | ₹40,153.36 |
| 5 | F.A brick work in cement mortar (1:6) using F.A. bricks (25cm x12cm x8cm)of approved quality including cost, conveyance & royalty of all materials etc complete as per direction of the Engineer-in-charge. (A) In foundation & plinth | 8.99 | Cum | 6,032.48 | ₹54,232 |
| 6 | B) In super structure | 19.37 | Cum | 6,065.81 | ₹1,17,494.74 |
| 7 | Reinforced Cement concrete M20 using 20 mm and down size C.B. chips for R.C.C. Work including hoisting and laying etc completed as per direction of the Engineer-in-charge (a)Column footing up to Plinth Level | 14.66 | Cum | 6,030.34 | ₹88,404.78 |
| 8 | (b)Plinth Beam | 2.97 | Cum | 6,030.34 | ₹17,910.11 |
| 9 | (c)Lintel Band | 1.24 | Cum | 6,030.34 | ₹7,477.62 |
| 10 | (d)Column & beam | 7.45 | Cum | 6,030.34 | ₹44,926.03 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
DTCNKotasingh.pdf
Tender Documents • 1.60 MB
BOQ_588842.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .