| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1 bidder₹1.4 CrAccepted-Finance 114 PIYALI APPARTMENT RAJDANGA GOLD PARK RAJDANGA GOLD PARK KOLKATA WEST BENGAL 700107 | KOLKATA | WEST BENGAL | 700107 | ₹1.4 Cr | L1 bidder | Accepted-Finance L1 bidder |
| 2 | L2 bidder₹1.5 Cr+₹10.7 L (7.69%)Rejected-Finance 605 POST RAJBATI C O NIKHIL KUMAR GHOSH BABURBAG KALITALA VILLAGE TOWN BURDWAN CITY BARDHAMAN PURBA BARDHAMAN WEST BENGAL 713104 INDIA | PURBA BARDHAMAN | WEST BENGAL | 713104 | ₹1.5 Cr+₹10.7 L (7.69%) | L2 bidder | Rejected-Finance L2 bidder |
| 3 | L3 bidder₹1.7 Cr+₹30.3 L (21.7%)Rejected-Finance 369 SHANTIPALLY WEST BENGAL KOLKATA KOLKATA WEST BENGAL 700107 | KOLKATA | WEST BENGAL | 700107 | ₹1.7 Cr+₹30.3 L (21.7%) | L3 bidder | Rejected-Finance L3 bidder |
| 4 | L4 bidder₹1.9 Cr+₹51.1 L (36.7%)Rejected-Finance | ₹1.9 Cr+₹51.1 L (36.7%) | L4 bidder | Rejected-Finance L4 bidder |
| 5 | L5 bidder₹1.9 Cr+₹51.1 L (36.7%)Rejected-Finance | ₹1.9 Cr+₹51.1 L (36.7%) | L5 bidder | Rejected-Finance L5 bidder |
Tender Value
Refer Docs
EMD Value
₹4.8 L
Closing Date
22 Mar 2025, 4:00 pmClosed
GM(P and P)
Office of the GM(P and P), 2nd Floor, Technical Building, Unit 7, DPL, Durgapur, Paschim Bardhaman, West Bengal , Pin-713201.
Design and Engineering, Manufacture/Procurement, Supply,Installation,Testing and Commissioning of 430 KWp Rooftop Solar Photovoltaic Power Plant at DPPS,DPL,Durgapur,West Bengal in turnkey basis including warrantee obligation with 02 (Two) years
2025_DPL_813509_1
WBDPL/PP/T/11022(16)/1/2025/ PC/301 Dtd-10.02.2025
Open Tender
Project Work
Item Rate
DPPS, DPL.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4.8 L
Conference Hall, 4th Floor, Technical Building
4 Dec 2025
10 Feb 2025
26 Mar 2025
10 Feb 2025
22 Mar 2025
19 Feb 2025
17 Feb 2025
Amount
Supply Schedule including Transportation and Insurance
Cost in Rs. for 430kWp Rooftop Solar PV plants for Supply of Materials.
Mandatory spares as per Clause 5.21 of NIT
Erection & Commissioning Schedule including site insurance
Cost in Rs. for 430kWp Rooftop Solar PV plants for Installation Service.
Cost in Rs. for 430kWp Rooftop Solar PV plants for Testing and Commissioning.
Cost in Rs. of Material including civil items used for Erection & Commissioning for 430kWp Rooftop Solar PV plants.
E AND C ENGINEERING AND CONSULTANCY SERVICES PVT LTD (BID ID -6263763)
Suncraft Energy Private Limited (BID ID -6215314)
SUNSHINE POWER PRODUCTS PVT. LTD. (BID ID -6201158)
VSL RE POWER PVT. LTD (BID ID -6174984)
GoSolar Power Systems (BID ID -6223566)
NITESH POWERTECH PRIVATE LIMITED (BID ID -6263461)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .