Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 CrAdmitted-Finance | ₹9.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.9 Cr+₹4 L (0.40%)Admitted-Finance | ₹9.9 Cr+₹4 L (0.40%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technical Bid Disqualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technical Bid Disqualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technical Bid Disqualified |
| Sl No | Description | Qty | Unit | M/s. Tama Fabrication Works L2 | M/s North East Engineering and Construction Agency L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of Steel Girder Composite Bridge (Span 62.60 m) with a provision of:
a. Survey Investigation & Design Drawing including technical vetting from NIT or NERIST.
b. Sub-structure: strengthening/ construction of right bank abutment, Wing Wall.
c. Super-structure: Steel Girder Composite Bridge with RCC Decking.
d. Approach Road: Earth filling & CC Pavement.
e. Protection work: River training work / Boulder apron. | 1 | Job | 9,94,00,000 ₹9,94,00,000 | 9,90,00,000 ₹9,90,00,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
30 Oct 2023, 4:00 pmClosed
Executive Engineer, Doimukh Division PWD
O/o the Executive Engineer, Doimukh Division PWD, A.P. Doimukh
Co Bridge over river Papum at Byate Span 62.60 m CRIF Under Setu Bandhan
2023_PWDAP_1433_1
DD/2023-24/04
Open Tender
Civil Works - Bridges
Turn-key
365 days
Byate
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
EE PWD Doimukh
₹10 L
O/o the Executive Engineer, Doimukh Division PWD
11 Dec 2023
16 Oct 2023
3 Nov 2023
16 Oct 2023
30 Oct 2023
16 Oct 2023
25 Oct 2023
Amount
Construction of Steel Girder Composite Bridge (Span 62.60 m) with a provision of: a. Survey Investigation & Design Drawing including technical vetting from NIT or NERIST. b. Sub-structure: strengthening/ construction of right bank abutment, Wing Wall. c. Super-structure: Steel Girder Composite Bridge with RCC Decking. d. Approach Road: Earth filling & CC Pavement. e. Protection work: River training work / Boulder apron.
M/s. Tama Fabrication Works
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .