Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.5 L+₹7,478.75 (5.27%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹4,470
Closing Date
25 Sept 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
CONSTRUCTION OF CULVERT AT DAL KHUL NR GH MOHIDIN BHAT GULL BHAT MUKHTA BHAT KRALHARD W6
2026_RDPR_325135_21
NIT NO 121 OF 2026-27 ADF GENERAL
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹4,470
2 Oct 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
18 Sept 2026 - 18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | .Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 1.21 | sqm | 286.75 | ₹346.31 |
| 2 | .Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.1 | cum | 7,788 | ₹8,595.62 |
| 3 | .Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.41 | cum | 9,821 | ₹43,357.75 |
| 4 | .Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platforms. | 10.87 | sqm | 718 | ₹7,804.16 |
| 5 | steel reinforcement for reinforced cement concrete i/c cutting bending placing in position all complete | 584.96 | kg | 115.35 | ₹67,475.25 |
| 6 | Sand/.stone aggregate below 20 mm nominal | 7.45 | cum | 465 | ₹3,464.24 |
| 7 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 106.1 | kg | 138 | ₹14,641.46 |
| 8 | .Demolishing cement concrete manually/by mechanical means including
disposal of material within 50 meters lead as per direction of Engineer-in
charge: 1:3:6 or richer mix (i/c equivalent design mix) | 1.36 | cum | 1,725 | ₹2,344.94 |
| 9 | .Disposal of dismantled materials at an avg lead of 5km | 1.36 | cum | 401 | ₹545.36 |
| 10 | signboard/photographs | 1 | no | 1,000 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1098005.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .