Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | -51.50% | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹19.7 L (13.9%)Admitted-Finance | -44.77% | ₹1.6 Cr+₹19.7 L (13.9%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 Cr+₹25.7 L (18.2%)Admitted-Finance | -42.69% | ₹1.7 Cr+₹25.7 L (18.2%) | L3 | Admitted-Finance |
| 4 | L4₹1.8 Cr+₹41.6 L (29.4%)Admitted-Finance 03 SHIAH SHIAH BHUNTER NEENU KULLU HIMACHAL PRADESH 175141 | KULLU | HIMACHAL PRADESH | 175141 | -37.26% | ₹1.8 Cr+₹41.6 L (29.4%) | L4 | Admitted-Finance |
| 5 | L5₹1.9 Cr+₹50.4 L (35.6%)Admitted-Finance | -34.25% | ₹1.9 Cr+₹50.4 L (35.6%) | L5 | Admitted-Finance |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
2 Mar 2026, 4:00 pmClosed
Executive Engineer FCD Jammu
Executive Engineer FCD Jammu
Construction of Flood protection work by way of revetment crates and earthen embankment on right side of River Nikki Tawi from Omman Post to Makwal Forward Post along International Border at Village Makwal (At spots) Part-C.
2026_IFC_303791_1
e-NIT No. 32 of 2025-26
Open Tender
Civil Works
Percentage
120 days
Jammu
as per nit
2 documents required · 2 mandatory
₹5,000
Executive Engineer FCD Jammu
₹5.8 L
16 Apr 2026
18 Feb 2026
3 Mar 2026
18 Feb 2026
2 Mar 2026
18 Feb 2026
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil :
Hand packing of stones in wire crates excluding cost of stones and crates
Dry Stone pitching (any thickness) excluding cost of stones.
On horizontal
On slopes
Earth work in rough excavated, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, rolling each layer with 1/2 tonne roller or wooden or steel rammers and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50m and lift upto 1.5 m, in all kinds of Soil.
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, rolling each layer with 1/2 tonne roller or wooden or steel rammers and dressing up in embankments for roads, flood banks, marginal banks and guide banks lead upto 50m and lift upto 1.5, in all kinds of Soil.
Supply of Stones
Carriage of stones from neareast source to site of work 30 km by MT including loading, unloading, stacking complete
Carriage of earth at an average distance 01 km by MT from source to site including loading and unloading of material
Carriage of RBM at an average distance 30 km by MT from source to site including loading and unloading of material
Providing of 4mm B.A wire Knitted wire crates of Size ( of mesh size 0.15 mtr x 0.15 mtr with end lids incluidng 4mm B.A wire complete item specification as per IS Standard / code
Knitted crate size (6.00x 1.50x 1.50 mtr)
stage.html
html • 0.04 MB
technical_986595.pdf
techsummary_986595.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.73 MB
BOQ_986595.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .