Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
19 Aug 2026, 6:00 pm
GE RnD Pashan
GE RnD Pashan
REPAIR / MAINTENANCE OF EXTERNAL WATER SUPPLY, PIPELINE, FIREFIGHTING, FIRE HYDRANTS, PUMP SETS AND OTHER MISC WORKS SYSTEM AT NMRL AMBERNATH
2026_MES_781549_1
GERD/PSN/TOKEN/45 OF 2026-27
Open Tender
Civil Works - Water Works
Item Rate
180 days
GE RnD Pashan
As per tender documents
8 documents required · 8 mandatory
₹500
GE RnD Pashan
₹60,000
Yes
29 Jul 2026
29 Jul 2026
26 Aug 2026
29 Jul 2026
19 Aug 2026
12 Aug 2026
29 Jul 2026 - 5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Material and labour for cleaning and removing all scales and dirt etc, from PVC tanks of capacity exc 250 Ltrs and n. exc 500 Ltrs from mouth by emptying, drying, cleaning by scrubbing the dust with wire brush, after removing inlet and out let pipes (also cleaning the mouths of circulating pipe) and refixig including writing date of cleaning with synthetic enamel white paint in proper format as directed by Engr-in-Charge.NOTE: (i) All inlet and outlet pipes are to be checked properly any leakage during the cleaning of tanks all as specified and as directed.(ii) If float valve broken at the time of cleaning the contractor has to replace it without any extra payment. | 74 | Each | - | - |
| - | As per item No 1 above but of capacity 500 Ltrs but n. exc 1000 Ltrs. NOTE: (i) All inlet and outlet pipes are to be checked properly any leakage during the cleaning of tanks all as specified and as directed.(ii) If float valve broken at the time of cleaning the contractor has to replace it without any extra payment. | 21 | Each | - | - |
| - | As per item No 1 above but of capacity 2000 Ltrs but n. exc 10000 Ltrs NOTE: (i) All inlet and outlet pipes are to be checked properly any leakage during the cleaning of tanks all as specified and as directed.(ii) If float valve broken at the time of cleaning the contractor has to replace it without any extra payment. | 15 | Each | - | - |
| - | Material and labour for Cleaning of RCC under ground sump of following capacity by removing sludge, mud or any other foreign material from the bottom and internal wall surface of tank by means of wire brush and spraying of cleaned fresh water, bailing out accumulated dirty water inside the tank with pump sets, removal of deposited muds and other sediments, washing of internal surface with sufficient quantity of mixture in suitable proportion (0.10 Kg of bleaching powder will be mix in 1.0 litre water), finally applying two coats of lime washing on entire internal surface of walls,allowing applied coat to become dry and wait for confirmation from MES Staff , writing the date of cleaning and capacity of tank with white synthetic enamel paint on black background with synthetic enamel paint complete all as directed by Engineer-in-charge for the following locations :-
(a) Main Gate Pump House No 3 (2.25 Lakh Ltr) | 1 | Each Job | - | - |
| - | (b) Pump House No 1 (2 Lakh GLN) | 1 | Each Job | - | - |
| - | (c) Near MI Room (Semi Circulation 75 Thousand) | 1 | Each Job | - | - |
| - | Material and labour for Cleaning of RCC over head water tank of capacity 1.0 Lakh GLN at 25 metre height by removing sludge, mud or any other foreign material from the bottom and internal wall surface of tank by means of wire brush and spraying of cleaned fresh water, bailing out accumulated dirty water inside the tank with pump sets, removal of deposited muds and other sediments, washing of internal surface with sufficient quantity of mixture in suitable proportion (0.10 Kg of bleaching powder will be mix in 1.0 litre water), finally applying two coats of lime washing on entire internal surface of walls,allowing applied coat to become dry and wait for confirmation from MES Staff , writing the date of cleaning and capacity of tank with white synthetic enamel paint on black background with synthetic enamel paint complete all as directed by Engineer-in-charge for the following locations:-
(a) Near Power House No 1 OHT | 1 | Each Job | - | - |
| - | Material and labour for Cleaning of RCC under ground sump reservoir/SWT 2.25 /2.0 Lakh capacity (Fire Static Tank Capacity by removing sludge, mud or any other foreign material from the bottom and internal wall surface of tank by means of wire brush and spraying of cleaned fresh water, bailing out accumulated dirty water inside the tank with using Sludge pump sets, removal of deposited muds and other sediments, washing of internal surface with sufficient quantity of mixture in suitable proportion (0.10 Kg of bleaching powder will be mix in 1.0 litre water), finally applying two coats of lime washing on entire internal surface of walls,allowing applied coat to become dry and wait for confirmation from MES Staff , writing the date of cleaning and capacity of tank with white synthetic enamel paint on black background with synthetic enamel paint complete all as directed by Engineer-in-charge for the following locations:-
(a) Near Power House No 1 / Old Tech area (Round Type) | 2 | Each Job | - | - |
| - | (b) Near HHF SWT Sump (Round Type) | 1 | Each Job | - | - |
| - | Testing of potable water sample collected from NMRL R & D Ambernath and testing report from NABL acredited lab as per BIS - 10500:2012 parameters Complete for drinking water carried out all as directed by Engr-in-Charge. | 6 | Each Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
8744.pdf
Tender Documents • 1.21 MB
BOQ_875528.xls
BOQ • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].