Tender Value
₹84.7 L
EMD Value
₹1.7 L
Closing Date
29 Jun 2026, 3:00 pm
Transportation of P.Way materials to different P.Way units under the jurisdiction of DEN/West/KGP.
E-KGP-WEST-20-2026
E-KGP-WEST-20-2026
Open
12 Months
Unknown (Unspecified Location)
₹0
₹1.7 L
4 Jun 2026
4 Jun 2026
15 Jun 2026
Item Breakup - A-USSOR-21
lead up to 50 metres and lift up to 5 metres.
1440.00 119.83 possible and traffic block is not required or in Truck/trailer. Loading of tongue rail, stock rail, switch assembly and crossings of any section and length, SEJ, Glued joint etc. with / without P.Way fittings and fastenings, in Wagon / Truck / trailer including lead up to 250 metre and lift up to 5 metre.
1400.00 118.89 possible a n d traffic block is not required or in Truck/trailer. Unloading of rails of any section and length up to 13 metre, in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/trailer including lead up to 50 metre, lift up to 5 metre and stacking in prescribed manner.
1440.00 possible a n d traffic block is not required or in Truck / trailer. Unloading of Switches / Crossings / SEJ Rails / Glued Joints of any rail section and length with or without P.Way fittings & fastenings in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with lead up to 250 metre & lift up to 5 metres.
MT Total 635104.00
Item Breakup - B-USSOR-21
700.00 possible a n d traffic block is not required or in Truck / trailer Loading of 52kg / 60kg PSC line and special sleepers beyond 2.75 metre length including existing fittings and fastenings in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
920.00 118.45 handling is possible a n d traffic block is not required. Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc . Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
MT Unloading of 52kg / 60kg PSC special sleepers beyond 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 50 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
MT Total 318126.80
Item Breakup - C-USSOR-21
MT KHARAGPUR DIVISION-ENGG/SOUTH EASTERN RLY Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items.
Item Breakup - D-USSOR-21
60000.00 item no. 172047 Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ACS-12022_CE-I_CT_GCC-2022_Policydt.14.07.2022.pdf
ATTACHMENT
ACS-22022_CE-I_CT_GCC-2022_Policydt.13.12.2022.pdf
ATTACHMENT
ACS-32022_CE-I_CT_GCC-2022_Policydt.26.04.2023.pdf
ATTACHMENT
ACS-42022_CE-I_CT_GCC-2022_Policydt.07.08.2023.pdf
ATTACHMENT
ACS-52022_CE-I_CT_GCC-2022_Policydt.20.10.2023.pdf
ATTACHMENT
ACS-62022_CE-I_CT_GCC-2022_Policydt.21.12.2023.pdf
ATTACHMENT
AnnexureVIA.pdf
ATTACHMENT
AnnexureVIB.pdf
ATTACHMENT
VENDERMANDATEFORM.pdf
ATTACHMENT
MinimumwagesPFESIShramikKalyanPortal.pdf
ATTACHMENT
Annexure-II.pdf
ATTACHMENT
CertificateofInformationregardingEmployment_1.pdf
ATTACHMENT
2018_CE-I_CT_9Date04_06_2018.pdf
ATTACHMENT
LabourLawdtd11052026.pdf
ATTACHMENT
ACS-72022_CE-I_CT_GCC-2022_Policydt.25.09.2024.pdf
ATTACHMENT
ACS-82022_CE-I_CT_GCC-2022_Policydt.20.12.2024.pdf
ATTACHMENT
ACS-92022_CE-I_CT_GCC-2022_Policy_Pt.Idt.09.01.2025.pdf
ATTACHMENT
SpecialconditionofContractforallcontract.pdf
ATTACHMENT
CivilSpecialCondition18052026.pdf
ATTACHMENT
SPECIALCONDITIONSFORP.WAYWORKS14042026.pdf
ATTACHMENT
ChecklistforSafetyandQualityMeasuresatWorksitesdt_08_03_20251.pdf
ATTACHMENT
ACS-102022_CE-I_CT_GCC-2022_Policydt.04.03.2025.pdf
ATTACHMENT
ACS-112022_CE-I_CT_GCC-2022_Policy_Pt.Idt.13.03.2026.pdf
ATTACHMENT
CablecuttingPenaltyCirculardated12.06.2023.pdf
ATTACHMENT
BidCapacity.pdf
ATTACHMENT
Download all tender documents and submit your bid