| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TRICON L2 | BUILDRITE CONSTRUCTION L1 | NARAYAN DEKA L3 |
|---|---|---|---|---|---|---|
| 1.00Water proofing treatment for sunken slab in toilets (Internal) | ||||||
| 1.01 | Removal of all the old tiles, if exist and cleaning the same to remove the loose particles, debris, dust etc., then saturating the surface with water, including cost of labour, consumables, tools and tackles etc., complete. | 1,270.27 | Sqm | 50 ₹63,513.40 | 100 ₹1.3 L | 50 ₹63,513.40 |
| 1.02 | Providing and laying water proofing treatment in sunken portion of WCs, bathroom, wall etc., by applying cement slurry mixed with water proofing cement compound consisting of applying :
(a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours.
(b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours.
The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry | 638.2 | Sqm | 390 ₹2.5 L | 500 ₹3.2 L | 580 ₹3.7 L |
| 1.03 | Providing and laying of cement concrete of proportion 1:5:10 (1cement : 5 sand : 10 AAC block bats of size 40mm) in sunken floors at all floors, heights and levels | 158.51 | Cum | 5,800 ₹9.2 L | 2,600 ₹4.1 L | 5,500 ₹8.7 L |
| 1.04 | Providing and laying M20 Fibre Reinforcement Concrete Screed over the treated surface as per direction of Engineer in charge. (Integral crystalline admixture for to be added for water proofing treatment to be paid separatly) | 48.32 | Cum | 8,000 ₹3.9 L | 6,600 ₹3.2 L | 8,300 ₹4.0 L |
| 1.05 | Providing and mixing integral crystalline admixture for water proofing treatment to RCC structures like basement raft, retaining walls, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc. at the time of transporting of concrete into the drum of the ready-mix truck , using integral crystalline admixture @0.80% (minimum) to the weight of cement content per cubic meter of concrete) or higher as recommended by the manufacturer's specification in reinforced cement concrete at site of work. The material shall meet the requirements as specified in ACI-212-3R- 2010 i.e. by reducing permeability of concrete by more than 90%, compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure. The crystalline admixture shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the Engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. | 767 | Kg | 300 ₹2.3 L | 320 ₹2.5 L | 355 ₹2.7 L |
| 2.00Expansion Joints | ||||||
| 2.01 | Providing and applying of swellable type water stop tape, 19 mm x 25 mm thick in linear metre (expansive nature) for construction joints treatment
of RCC structure such as raft slab, retaining walls, water storage tank and at the junctions of raft slab with the retaining walls etc.. After cleaning the
surface, one coat of required primer for swellable water stop tape shall be applied throughout the length of the joint @3.78 litre per 240 running
metre. Over the primed surface swellable type water stop tape shall be placed. The work shall be carried out all complete as per specification and
the direction of the Engineer-In-Charge. The product performance shall carry guarantee for 10 years against any leakage | 1,518.78 | Rm | 550 ₹8.4 L | 490 ₹7.4 L | 550 ₹8.4 L |
| 3.00Water proofing treatment in the RCC Roof slab/ Portico Slab | ||||||
| 3.01 | Removal of all the old tiles, if exist and cleaning the same to remove the loose particles, debris, dust etc., then saturating the surface with water, including cost of labour, consumables, tools and tackles etc., complete. | 679.5 | Sqm | 50 ₹33,975 | 110 ₹74,745 | 50 ₹33,975 |
Tender Value
₹2.1 Cr
EMD Value
₹4.1 L
Closing Date
17 Dec 2025, 3:00 pmClosed
HOS MAINTENANCE
IPM SECTION IPM SECTION
Repair and Renovation and waterproofing work at the washroom of A and C block and Corridor of Dhansiri hostel in IITG Campus
2025_IITG_888226_1
IITG/IPM/NIT/R/2025-26/62
Open Tender
Civil Works
540 days
IPM SECTION
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Payable To
₹4.1 L
13 Feb 2026
3 Dec 2025
18 Dec 2025
3 Dec 2025
17 Dec 2025
8 Dec 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.82 MB
Tender Documents
Tender Documents • 1.24 MB
BOQ
BOQ • 0.47 MB
Download all tender documents and submit your bid