Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC 160Y 10F POLEPETTAI WEST MEELAVITTAN ROAD THOOTHUKUDI 628002 | TUTICORIN | TAMIL NADU | 628002 | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.7 L+₹2,638 (1.00%)Rejected-AOC 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | VEL ENGINEERING | UNITECH ENGINEERING |
|---|---|---|---|---|---|
| 1.00 | Charges for isolation of suction and discharge pipe lines by closing valves, decoupling the pump and motor assembly, dismantling the pump top casing and removing the worn-out rotating assembly from the bottom casing, assembling the reconditioned rotating assembly into bottom pump casing, changing the gland ropes and fixing the top casing, alignment checking, coupling, line charging, testing and commissioning etc., including cost of consumables and hire charges for T&P etc., of SWBP's and ACWP's | 6 | Nos | 67,968 ₹80,202.24 | 67,248 ₹79,352.64 Lowest |
| 2.00 | Charges for overhauling the rotating assembly by dismantling into its constituent parts like shaft, impeller, sleeves, bearing housings etc., cleaning and replacing the wornout parts if necessary including charges for consumable and hire charges for T&P etc.(Pump Spares like Shaft, sleeve, wear ring, stuffing box bush, Bearing Housing will be supplied by TANGEDCO and Consumables will be contractor scope) | 6 | Nos | 99,312 ₹1,17,188.16 | 98,352 ₹1,16,055.36 Lowest |
| 3.00 | Charges for metal filling on the bearing and impeller seating wornout portions of shaft, stress relieving, machining & checking trueness of pump shaft, thread portion cleaning at both end of shaft for holding lock nuts, impeller & coupling key way correcting and removing metal burs, impeller dynamic balance checking including cost of required consumables and hire charges for T&P. | 6 | Set | 58,278 ₹68,768.04 | 57,714 ₹68,102.52 Lowest |
| 4.00 | Supply of Material (Contractor's Scope) 12.5mm PTFE Gland rope | 10 | Kg | 24,650 ₹29,087 | 24,410 ₹28,803.8 Lowest |
| 5.00 | Material (Contractor Scope)
Single Row deep groove ball bearing 6311C3 | 6 | Nos | 5,472 ₹6,456.96 | 5,418 ₹6,393.24 Lowest |
| 6.00 | Material (Contractor Scope)
Single row cylindrical roller bearing N311 | 6 | Nos | 8,964 ₹10,577.52 | 8,874 ₹10,471.32 Lowest |
| 7.00 | Transporting the rotating assembly to town workshop | 1 | LS | 1,030 ₹1,215.4 | 1,020 ₹1,203.6 Lowest |
Tender Value
Refer Docs
EMD Value
₹2,800
Closing Date
1 May 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle CAD Unit IV and V ACW System Attending repair and overhauling of released rotating assembly, Replacement of wornout rotating assembly of Sea water Booster pump and Auxiliary cooling water pump for the period of six months
2025_EB_546671_1
CE/SE/O/TTPS/Spec.No.80/25-26
Open Tender
Miscellaneous Works
Item Rate
180 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2,800
Yes
12 Nov 2025
16 Apr 2025
2 May 2025
16 Apr 2025
1 May 2025
16 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .