Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.8 LAdmitted-Finance | -32.22% | ₹12.8 L | L1 | Admitted-Finance |
| 2 | L2₹13.2 L+₹42,002.46 (3.29%)Admitted-Finance | -29.99% | ₹13.2 L+₹42,002.46 (3.29%) | L2 | Admitted-Finance |
Tender Value
₹18.8 L
EMD Value
₹37,660
Closing Date
5 Sept 2026, 4:00 pmClosed
Executive Engineer RNb Dalgate DIvision Sgr
Executive Engineer RNb Dalgate DIvision Sgr
Upgradation of lane by way of cement concrete etc from main road sector F to H/o. Abdul Majeed Kutay Sector F2 at Iram colony Natipora.
2026_PWDJK_322766_1
Nit-48 of RNB/6461-68/2026-27 dtd.29-08-2026
Open Tender
Civil Works
Percentage
45 days
Natipora.
as per Nit
2 documents required · 2 mandatory
₹800
Executive Engineer RNb Dalgate DIvision Sgr
₹37,660
9 Sept 2026
29 Aug 2026
7 Sept 2026
30 Aug 2026
5 Sept 2026
30 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead upto 50 meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 198.51 | Sqm | 77.75 | ₹15,434.15 |
| 2 | Engagement of JCB for general site clearance including removing the undulations and any unwanted material of the ground surface to level the ground surface as per the directions of EIC. | 8 | Hrs | 847.46 | ₹6,779.68 |
| 3 | Providing and laying of stone soling / granular sub base including spreading the material in layers and consolidation with PRR of 8 to 10 tonne capacity including cost and carriage of all materials complete. | 30.24 | Cum | 805.08 | ₹24,345.62 |
| 4 | Supplying, stacking, laying, spreading and compacting graded Curshed stone aggregate of size 63mm-45mm to water bound macadam specifications in uniform thickness, hand picking, rolling with 3 wheeled road roller / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming type “A” of screening and binding material to fill up interstices of coarse aggregate, watering and compacting to the required density finished work to be measured (75mm compacted thickness) including all carriage of materials upto site of work complete. | 7.22 | Cum | 1,864.41 | ₹13,461.04 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size). | 42.3 | Cum | 4,409.24 | ₹1,86,510.85 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size). | 111.67 | Cum | 6,600.34 | ₹7,37,059.97 |
| 7 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Thermo mechanically treated bars of grade. Fe-500D or more complete. | 5,025.12 | Kg | 104.41 | ₹5,24,672.78 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. | 6.97 | Sqm | 242.67 | ₹1,691.41 |
| 9 | Providing and fixing in position 18mm thick MDF board panels at joints including cutting to required size cost of carriage complete job. | 18.4 | Sqm | 762.71 | ₹14,033.86 |
| 10 | Carriage of materials from source to site of work by mechanical means. | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1084060.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .