Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC BALTANA HOUSE NO 202 HARMILAP NAGAR PHASE 1 SAS NAGAR PUNJAB 140604 | SAS NAGAR | SAS NAGAR | PUNJAB | 140604 | ₹1.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 LRejected-AOC SHOP NO 137 38 NEW MOTOR MARKET MANIMAJRA CHANDIGARH | CHANDIGARH | CHANDIGARH | CHANDIGARH | ₹1.7 L | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical SECTOR 5 PANCHKULA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical HARYANA HARYANA HARYANA | JHAJJAR | HARYANA | 124021 | - | - | Not Admitted-Fee/PreQual/Technical Others-unsigned Affidavit uploaded by the agency |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.7 L
EMD Value
₹3,400
Closing Date
9 Dec 2025, 12:00 pmClosed
Narender Kumar Payal
DIV 2 Panchkula
Repair of box type drain in 45 mtr wide periphery road from RD 1450 to 2300 complete in all respect all other contingent work (A/mtc of roads Sector 1 to 6, MDC, Panchkula and Pinjore)
2025_HBC_487281_1
2025156AB96F B088 4A8B 96C0 BA6F7E2478DC270HSV
Open Tender
Civil Works
60 days
Panchkula
2 documents required · 2 mandatory
₹250
₹3,400
Yes
28 Jan 2026
2 Dec 2025
9 Dec 2025
2 Dec 2025
9 Dec 2025
2 Dec 2025
2 Dec 2025 - 4 Dec 2025
[14.51.1]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 1. Hire Charges forJCB with bucket capacity of 0.4 cum
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform
[6.33.1]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 1. Mild steel and Medium Tensile steel bars
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_565383.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid