Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-Finance | ₹23.5 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹25.3 L+₹1.8 L (7.86%)Accepted-Finance 01 S O MANJUR ALI KAJI PUGAL ROAD BAJRANG NAGAR DISTRICT TRAINING CENTRE BIKANER RAJASTHAN 334004 | BIKANER | RAJASTHAN | 334004 | ₹25.3 L+₹1.8 L (7.86%) | L2 | Accepted-Finance Accepted |
| 3 | L3₹26.1 L+₹2.6 L (11.1%)Accepted-Finance | ₹26.1 L+₹2.6 L (11.1%) | L3 | Accepted-Finance Accepted |
| 4 | L4₹29.8 L+₹6.3 L (26.9%)Accepted-Finance | ₹29.8 L+₹6.3 L (26.9%) | L4 | Accepted-Finance Accepted |
| 5 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s Charley Enterprises L1 | munfad electricals L4 | P S ENTERPRISES L3 | AKS Construction Company L2 |
|---|---|---|---|---|---|---|---|
| 1.00For EDD Chandausi, Sambhal and Babrala | |||||||
| 2.00Safe carriage of the following Centralised material from Store Centre to site /JE store with loading & unloading at both ends respectively. | |||||||
| 2.01 | stay wire 7/8 SWG, 10 KG, Stay Clamp, Bolt, nut and washer with concrete grouting) | 228 | Kg | 5 ₹1,140 | 3 ₹684 | 2 ₹456 Lowest | 2 ₹456 Lowest |
| 2.02 | 11 KV "V" type cross arm 65x65x6 mm, M S Angle | 71 | Nos. | 200 ₹14,200 | 10 ₹710 Lowest | 10 ₹710 Lowest | 20 ₹1,420 |
| 2.03 | 11 KV "V" type cross Arm | 13 | Nos. | 120 ₹1,560 | 10 ₹130 Lowest | 12 ₹156 | 20 ₹260 |
| 2.04 | 11 KV V type Steel Cross Arm | 115 | Nos. | 150 ₹17,250 | 8 ₹920 Lowest | 15 ₹1,725 | 15 ₹1,725 |
| 2.05 | 11 KV cable jointing kit 3×300 mm straight through 11 kv 300mmsq | 22 | Nos. | 350 ₹7,700 | 15 ₹330 | 7 ₹154 Lowest | 75 ₹1,650 |
| 2.06 | 11 kV XLPE cable 3x185 mm² | 550 | Mtr | 10 ₹5,500 | 55 ₹30,250 | 4 ₹2,200 Lowest | 12 ₹6,600 |
| 2.07 | 11 kV XLPE cable 3x300 mm² | 122 | Mtr | 10 ₹1,220 | 62 ₹7,564 | 3 ₹366 Lowest | 22 ₹2,684 |
| 2.08 | ABC CABLE 3*120+1*95+1*16MM SQ. (5% SAG+ 1 %CONNECTION) | 1,360 | Mtr | 6 ₹8,160 | 23 ₹31,280 | 2 ₹2,720 Lowest | 5 ₹6,800 |
Tender Value
₹30.4 L
EMD Value
₹30,000
Closing Date
23 Jun 2026, 3:50 pmClosed
SE EDC SAMBHAL
132 KV HYDEL COLONY CHANDASUI
BP 2026-27 11 KV, 33 KV AND LT LINE SUDHRIKARAN WORK UNDER EDD CHANDASUI, SAMBHAL AND BABRALA
2026_PVVNL_1151908_3
04/EDC/SAMBHAL/2026-27
Open Tender
Electrical Works
Item Rate
90 days
CHANDAUSI
AS PER TENDER FORM
3 documents required · 3 mandatory
₹3,540
Yes
SE EDC
₹30,000
Yes
24 Jun 2026
18 Jun 2026
23 Jun 2026
18 Jun 2026
23 Jun 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1For EDD Chandausi, Sambhal and Babrala | |||||
| 2Safe carriage of the following Centralised material from Store Centre to site /JE store with loading & unloading at both ends respectively. | |||||
| 2.01 | stay wire 7/8 SWG, 10 KG, Stay Clamp, Bolt, nut and washer with concrete grouting) | 228 | Kg | - | - |
| 2.02 | 11 KV "V" type cross arm 65x65x6 mm, M S Angle | 71 | Nos. | - | - |
| 2.03 | 11 KV "V" type cross Arm | 13 | Nos. | - | - |
| 2.04 | 11 KV V type Steel Cross Arm | 115 | Nos. | - | - |
| 2.05 | 11 KV cable jointing kit 3×300 mm straight through 11 kv 300mmsq | 22 | Nos. | - | - |
| 2.06 | 11 kV XLPE cable 3x185 mm² | 550 | Mtr | - | - |
| 2.07 | 11 kV XLPE cable 3x300 mm² | 122 | Mtr | - | - |
| 2.08 | ABC CABLE 3*120+1*95+1*16MM SQ. (5% SAG+ 1 %CONNECTION) | 1,360 | Mtr | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
BOQ_2177596.xls
BOQ • 0.35 MB
T_444.pdf
Tender Documents • 1.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .