| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.2 LAccepted-AOC | ₹65.2 L Quoted ₹1.4 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹77.3 L+₹6.7 L (4.73%)Accepted-AOC BHITAR KOKILA GAON NEEMATI NEEMATIGHAT JORHAT ASSAM 785010 | JORHAT | JORHAT | ASSAM | 785010 | ₹77.3 L+₹6.7 L (4.73%) Quoted ₹1.5 Cr | L2 | Accepted-AOC AOC |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
29 May 2020, 2:00 pmClosed
Addl. Chief Engineer, UAZ, W.R. Deptt., Dibrugarh
Addl. Chief Engineer, UAZ, W.R. Deptt., Dibrugarh
Immediate measures to against the flood damages of B/dyke from Neamati P.W.D. road to Gohaingaon (Bor Ali) (From ch0.00m to ch3000.00m) against flood damages of 2019-20.
2020_DoWR_17605_1
UAID/SDRF/BORALI/2020-21/1
Open Tender
Civil Works
Works
60 days
Jorhat
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
The Executive Engineer, UAID, W. R. Division
₹3.0 L
Yes
16 Aug 2021
20 May 2020
30 May 2020
20 May 2020
29 May 2020
24 May 2020
Amount
Clearing medium jungles and trees up to 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed.( When 30% to 60% of the area is covered by shrubs,trees etc)(as per WRD SOR 2018-19 & Qntty as per statement)
Felling trees including uprooting roots and stumps up to 50 cm. below ground, cutting into pieces and removing the same from the site of work as directed.Trees above 0.50m and up to 1m girth:(as per WRD SOR 2018-19 & Qntty as per statement)
Supply of ordinary labour inclusive of all texes (as per WRD SOR 2018-19 & Qntty as per statement)
Earth work ir embankment by truck carriage In ordinary/normal soil excluding sandy and roctry soil free from roots & vegetaiion and fllling in uniform layers not exceeding 22cm lhick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 2.5cm cube, dressing as per design section including payment of forest royalty if any, etc. complete as directed (10% deduction will be made from the section measured quantities of the completed and compacted on account of shrinkage) For initial lead beyond ½ Km and up to 4.00 Km and for all lifts.(as per WRD SOR 2018-19 & Qntty as per statement)
SOMESWAR DAS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .