| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.1 LAccepted-AOC | 1 | Accepted-AOC Lowest Rates | |
| 2 | 2₹7.2 L+₹1.0 L (16.7%)Rejected-Finance 138 C NEW BERHANA ALLAHABAD U P | PRAYAGRAJ | UTTAR PRADESH | 211001 | 2 | Rejected-Finance Higher Rates | |
| 3 | 3₹7.8 L+₹1.6 L (26.3%)Rejected-Finance | 3 | Rejected-Finance Higher Rates |
Tender Value
₹7.8 L
EMD Value
₹16,000
Closing Date
24 Feb 2020, 5:00 pmClosed
Executive Engineer
Provl. Divn. PWD BandR Br., Bhiwani
Special repair of Primary Health Centre at Village Sui in Bhiwani Distt.
2020_HRY_117611_1
Bhiwani_SR PHC Sui Rs.7.83 lacs
Open Tender
Civil Works
Works
30 days
Bhiwani
Please refer tender documents
3 documents required · 3 mandatory
₹1,000
Executive Engineer, Provl. Divn. PWD BandR Br.,
₹16,000
28 May 2020
7 Feb 2020
25 Feb 2020
7 Feb 2020
24 Feb 2020
7 Feb 2020
Amount
Earth work in excavation in foundations, trenches, etc.in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres. HSR(6.6) (99.54+30.95) = 116.60
Earth Filling under floors with surplus soil excavated from foundation and taken only from outside the building plinth, in 15 cm layers including ramming watering and consolidating lead up to 30 meters. Subject to condition soil Is non plastic. [HSR 6.13(a)].
Dismantling Brick Work, Tile Masonry or Tile Lining and Tile Terracing in cement (HSR 8.5(B)
Scraping of Cement plaster HSR(8.32 (c )
Cement Concrete 1:8:16 with brick ballast 40mm nominal size in foundation and plinth. HSR(10.26).
Cement concrete 1:8:16 with stone aggregate 40 mm Nominal sie in foundation and plinth. (HSR 10.28)
Cement Concrete 1:2:4 with stone aggregate 20 mm nominal size if first storey upto 4 metres above plinth level. (HSR 10.59).
First class brickwork laid in cement sand mortar 1:6 in foundation and plinth. HSR(11.2).
First class brick laid in cement sand mortar 1:4 in foundation and plinth. HSR(11.4).
Damp proof course 25 mm thick of cement concrete 1:2:4 using stone aggregate 20mm nominal size with 2 coats of bitumen 20/30 penetration, at 1.65 Kg per sqm laid hot and sanded. HSR(10.115+Note).
First class brickwork laid in cement sand mortar 1:4 in first storey upto 4 meters above plinth level. HSR(11.9).
Provding and fixing Ist quality ceramic glazed wall tiles confirming to I.S. 15622(thickness to be specified by the manufcturer) of approved make in all colours shades except burgundy,bottle green,black of any size as approved by Engineer-in-Charge in skirting risers of steps and dados over 23mm thick bed of cement mortar 1:3 coarse and jointed with grey cement slurry,including pointing in white cement mxied with pigment to matching shades complete-300x450mm (14.92) (b)
12 mm thick cement plaster 1:4 HSR(15.5).
12mm thick cement plaster on walls (1:6). (HSR 15.7).
15 mm thick cement plaster 1:4 on the rough side of single or half brick wall. HSR(15.10).
Applying priming coat with cement primer in all shades on newly plastered or concrete exterior surfaces. (HSR 16.25)
Providing two coats of exterior acrylic emulsion paint. (Note:- First quality paint of reputed make firm such as Goodlass-Nerolac, Berger, Garware, Jenson, Nicholson, Asian & Shalimar Shall be used as approved by Engineer-in-charge in writing, Drum of paint shall be opened in presence of Engineer-in-charge). [HSR 16.79 (b)]. 1st quality
Fixing glass pieces, on top of walls HSR(26.25).
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Brick 20148 Nos. @ Rs. 4.00 Each
Brick bats 41.98 Cum @ Rs. 350/- P.Cum Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
VINOD KUMAR
Vivek Hans Contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .