Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.6 LAccepted-AOC | L1 | Accepted-AOC first lowest | |
| 2 | L2₹95.8 L+₹9.2 L (10.6%)Rejected-Finance GANDHI NAGAR DISTRICT MAHOBA UTTAR PRADESH | MAHOBA | UTTAR PRADESH | 210421 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical document incomplete |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
7 Feb 2025, 4:00 pmClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC BAZARIYA MAHOBA
Const. of Inlet at Km. 3.050 R/S, Km. 3.700 L/S, 3.700 R/S, 5.300 R/S, 12.700 R/S, 13.900 R/S, 14.500 R/S, 14.700 R/S, 16.800 R/S, 21.850 R/S and 24.000 R/S of Kabrai Main Canal.(Lot-4)
2025_UPIDC_989927_5
11/SE/2024-25
Open Tender
Civil Works
Item Rate
120 days
MAHOBA
as per tender nit and tender document
2 documents required · 2 mandatory
₹3,883
₹2.0 L
19 Mar 2025
1 Feb 2025
7 Feb 2025
1 Feb 2025
7 Feb 2025
1 Feb 2025
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. (Rate are excluding GST)
Excavation of foundation in mar, rankar and kankar mixed soils including lift up to 1.50 mtr and lead up to 30 mtr including filling, watering, ramming of excavated earth in to the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer in charge upto a distance of 30 mtr from the foundation trenches. but excluding G.S.T.
Supplying & laying coarse sand in foundation/inverted filter including cost of material, labour, T&P etc with all leads & lifts for proper completion of Job. but excluding G.S.T.
Cement or lime concrete 1:3:6 (M10) in foundation including laying, raamming curing & T&P extra for machanical mixing and vibration of concrete including cost of material, labour, T&P etc with all leads & lifts for proper completion of Job. but excluding G.S.T.
Laying R.C.C 1:1:5:3 (M20) including mixing laying and curing excluding centering, shuttering and reinforcement & T&P extra for machanical mixing and vibration of concrete including cost of material, labour, T&P etc with all leads & lifts for proper completion of Job. but excluding G.S.T.
Steal reinforcement for R.C.C work including cutting, bending with G.I. wire and placing in postion with cost of steal rainforcement. but excluding G.S.T.
Supplying & laying 900 mm dia RCC NP3 hume pipe including cost of material, labour, T&P etc with all leads & lifts with proper completion of Job. but excluding G.S.T.
Centering and shuttering for R.C.C work including cost of all material, labour, T&P and all leads and lifts with proper completion of work as per direction of engineer-in-charge. but excluding G.S.T.
Dry stone pitching with all cost of labour material T&P etc. required for completion of work. but excluding G.S.T.
E/W in back filling with all cost of labour, material, T&P etc with proper completion of work. but excluding G.S.T.
M/s Trivedi Associates (BID ID -4924723)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .