| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 CrAccepted-AOC | ₹6.3 Cr Quoted ₹5.4 Cr | L1 | Accepted-AOC Bid Rank L1 |
| 2 | L2₹5.6 CrRejected-Finance | ₹5.6 Cr | L2 | Rejected-Finance Bid Rank L-2 |
| 3 | L3₹5.6 CrRejected-Finance | ₹5.6 Cr | L3 | Rejected-Finance Bid Rank L-3 |
| 4 | L4₹5.8 CrRejected-Finance AT PO BANGOMURDA DIST BALANGIR ODISHA | BANGOMURDA | BALANGIR | ODISHA | ₹5.8 Cr | L4 | Rejected-Finance Bid Rank L-4 |
| 5 | L5₹5.9 CrRejected-Finance | ₹5.9 Cr | L5 | Rejected-Finance Bid Rank L-5 |
| Sl No | Description | Qty | Unit | ATUL KUMAR JAIN L1 | Sachin Agarwal L4 | Tulsi Ram Agrawal L3 | SOBIKA AGRAWAL L8 | SRI JITENDRA KUMAR NAYAK L10 | B. K. Construction Co. L11 | Manoj Kumar Agrawal L7 | OM CONSTRUCTIONS L2 | SHAMBHU PRASAD GOEL L12 | R.B.S Constructions L9 | M/S SRI OMI INFRA L5 | M/S RAMESH KUMAR AGRAWAL L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing jungles including uprooting tank vegetation, grass bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of trees cut earlier and disposal of unseviceable material and stacking of useful materials with supply of all labour T&P and all taxes as per prevailing norm etc. complete as directed by the Engineer-in-charge. | 1,77,620 | Sqm | 0.2 ₹35,524 | 0.23 ₹40,852.60 | 0.27 ₹47,957.40 | 0.27 ₹47,957.40 | 0.27 ₹47,957.40 | 0.24 ₹42,628.80 | 0.27 ₹47,957.40 | 0.25 ₹44,405 | 0.27 ₹47,957.40 | 0.2 ₹35,524 | 0.2 ₹35,524 | 0.23 ₹40,852.60 |
| 2.00 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stony earth, gravel, moorum, etc. interspread with boulder up to 0.50 cum. size with lifts and delifts including trimming of slope and bed to design section, dressing and depositing the excavated materials away from work site within an initial lead of 1 km from the place of excavation including supplying and maintenance of equipments, haul roads and approach roads, T&P materials etc. all complete as per the approved design, drawing, specification and direction of the Engineer-in-charge. | 55,900.95 | Cum | 65 ₹36.3 L | 66 ₹36.9 L | 66.24 ₹37.0 L | 74 ₹41.4 L | 70 ₹39.1 L | 73.38 ₹41.0 L | 67.9 ₹38.0 L | 70 ₹39.1 L | 73.8 ₹41.3 L | 70 ₹39.1 L | 70 ₹39.1 L | 68.76 ₹38.4 L |
| 3.00 | Providing Cement Concrete M15 grade with nominal reinforecment (excluding cost of M.S. rod, carriage and labour for cuttin, bending, binding and fixing of M.S. rod ) using 20mm and downgraded, crusher broken hard granite stone aggreagate of approved quality quarried,free from weathered skin, quarry debris and foreign materials, using clean and sharp sand of approved grading and quality confirming to the designed specifications including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with vibrator and finishing the exposed surface smooth, curing for required time, providing beads and grooves wherever necessary including cost, conveyance, royalty and other taxes of all materials, with all cost of tools and plants, cost and carriage of water etc, with supply of all labour, taxes as per prevailing norm and supervision charges including mobilization & demobilization of men & machinaries, T&P with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge. | 2,396.68 | Cum | 3,800 ₹91.1 L | 4,250.1 ₹1.0 Cr | 4,180 ₹1.0 Cr | 4,600 ₹1.1 Cr | 4,800 ₹1.2 Cr | 4,635.05 ₹1.1 Cr | 4,370.38 ₹1.0 Cr | 3,850 ₹92.3 L | 4,700 ₹1.1 Cr | 4,397 ₹1.1 Cr | 5,000 ₹1.2 Cr | 4,343.44 ₹1.0 Cr |
| 4.00 | Providing Reinforced Cement Concrete M20 grade for RCC works on approved surface or shape and size using 20mm and downgraded, crusher broken hard granite stone aggreagate of approved quality quarried,free from weathered skin, quarry debris and foreign materials, using clean and sharp sand of approved grading and quality confirming to the designed specifications including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with vibrator and finishing the exposed surface smooth, curing for required time, providing beads and grooves wherever necessary including cost, conveyance, royalty and other taxes of all materials (excluding cost of M.S. rod, carriage and labour for cuttin, bending, binding and fixing of M.S. rod ) with all cost of tools and plants, cost and carriage of water etc, with supply of all labour, taxes as per prevailing norm and supervision charges including mobilization & demobilization of men & machinaries, T&P with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge. | 72.56 | Cum | 4,200 ₹3.0 L | 4,625.05 ₹3.4 L | 4,544.76 ₹3.3 L | 4,800 ₹3.5 L | 4,699.98 ₹3.4 L | 5,034.8 ₹3.7 L | 4,747.3 ₹3.4 L | 4,900 ₹3.6 L | 5,063 ₹3.7 L | 4,776 ₹3.5 L | 5,200 ₹3.8 L | 4,718.04 ₹3.4 L |
| 5.00 | Supplying, fitting & placing HYSD bars reinforcement and tying the grills as per approved design and specification placing in position including providing lapping where necessary and supplying of binding wire 18 to 20gauge with supply of all labour, taxes as per prevailing norms and T&P required for the work etc. complete in all respect directed by the Engineer -in-charge. | 51 | Qntl | 8,000 ₹4.1 L | 7,877.18 ₹4.0 L | 7,575.23 ₹3.9 L | 8,500 ₹4.3 L | 8,000.16 ₹4.1 L | 8,392.01 ₹4.3 L | 7,915 ₹4.0 L | 8,000 ₹4.1 L | 8,403 ₹4.3 L | 7,961 ₹4.1 L | 8,200 ₹4.2 L | 7,864.05 ₹4.0 L |
| 6.00 | Providing rigid, smooth centring & shuttering for concrete works including false work and including cost, conveyance, royalty & other taxes of all materials required for the work complete in all respect and dismentaling the same after casting and curing with water for specified period including depositing the debris clear of work site with all leads & lifts, delifts including supply of all labur, all taxes as per prevailing norms and T&P required for the work etc. complete in all respect as directed by the Engineer in Charge. | 31,628.84 | Sqm | 160 ₹50.6 L | 204.05 ₹64.5 L | 200.09 ₹63.3 L | 211 ₹66.7 L | 200 ₹63.3 L | 221.67 ₹70.1 L | 211 ₹66.7 L | 200 ₹63.3 L | 223 ₹70.5 L | 210 ₹66.4 L | 240 ₹75.9 L | 207.72 ₹65.7 L |
| 7.00 | Filling foundation & plinth with excavated earth including watering & ramming to all heights with all leads & lifts with supply of all labour, all taxes as per norm and T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge. | 7,381.49 | Cum | 35 ₹2.6 L | 46.78 ₹3.5 L | 44.99 ₹3.3 L | 51 ₹3.8 L | 50 ₹3.7 L | 49.85 ₹3.7 L | 47 ₹3.5 L | 40 ₹3.0 L | 50 ₹3.7 L | 47 ₹3.5 L | 50 ₹3.7 L | 46.71 ₹3.4 L |
| 8.00 | Fine dressing and turfing in slope of canal embankment including trimmed to requird profile with best compacted dub grass sods with all leads and lifts including periodical watering with labour, all other taxes as per prevailing norms and T&P till survival of the turf etc.complete in all respect as directed by the Engineer-in-charge.( Mesurement and payment will be made on survival of the turf.) | 19,780.82 | Sqm | 10 ₹2.0 L | 12.93 ₹2.6 L | 12.44 ₹2.5 L | 15 ₹3.0 L | 15 ₹3.0 L | 13.78 ₹2.7 L | 12.99 ₹2.6 L | 15 ₹3.0 L | 12 ₹2.4 L | 13 ₹2.6 L | 14 ₹2.8 L | 12.91 ₹2.6 L |
| 9.00 | Providing CNS with approved moorum-sand admixture with compaction including cost of all labours and hire charges of T&P materials required for work including cost and conveyance of sand and moorum with consolidation by P.R.R. or rammer including watering etc. complete including cost and conveyance & royalty of moorum with all T&P and labour charges required for the item etc. complete as directed by the Engineer-in-charge. | 17,159.32 | Cum | 1,150 ₹2.0 Cr | 1,125.34 ₹1.9 Cr | 1,082.21 ₹1.9 Cr | 1,021 ₹1.8 Cr | 1,000 ₹1.7 Cr | 1,198.9 ₹2.1 Cr | 1,130.44 ₹1.9 Cr | 1,100 ₹1.9 Cr | 1,206 ₹2.1 Cr | 1,137 ₹2.0 Cr | 921 ₹1.6 Cr | 1,123.47 ₹1.9 Cr |
| 10.00 | Providing Cement Concrete M15 grade for Cement Concrete lining in canal to 75 mm thickness using 20mm and downgraded, crusher broken hard granite stone aggreagate of approved quality quarried,free from weathered skin surface and any deleterious materials, using clean and sharp sand of approved grading and quality confirming to the designed specifications including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level to the bed and slopes of canal with keys etc., providing contraction joints and filling with approved sealing materials including use of AEA(air entraining agents) in the concrete mix and supply of all materials, centering, shuttering required for the work, labour and machineries compacting with plate vibrator and finishing the concrete surface including trimming, dressing, watering and compacting of canal bed and slopes with rammers, providing beads and grooves etc. cutting trenches for keys as indicated in the approved drawing, curing the concrete for the required time with supply of all materials including cost, conveyance and royalty complete as directed by the Engineer-in-charge | 39,236.87 | Sqm | 270 ₹1.1 Cr | 305.5 ₹1.2 Cr | 293.8 ₹1.2 Cr | 321 ₹1.3 Cr | 340 ₹1.3 Cr | 325.48 ₹1.3 Cr | 306.89 ₹1.2 Cr | 300 ₹1.2 Cr | 327 ₹1.3 Cr | 306 ₹1.2 Cr | 315 ₹1.2 Cr | 305.07 ₹1.2 Cr |
Tender Value
₹7.0 Cr
EMD Value
₹7.0 L
Closing Date
26 Mar 2025, 3:00 pmClosed
Superintending Engineer,M.I. Division, Balangir
Superintending Engineer, M.I. Division, Balangir
Renovation to Distribution System of Mathanpala MIP in Titilagarh Block of Balangir District under OIIPCRA for the year 2024-25
2025_CEMIB_111069_1
OIIPCRA-W2-BGR-1/2024-25
Open Tender
Civil Works - Others
270 days
Titilagarh
Please refer Tender Documents
3 documents required · 3 mandatory
₹0
₹7.0 L
O/o Superintending Engineer,M.I. Division, Blgr
22 Jan 2026
25 Feb 2025
26 Mar 2025
25 Feb 2025
26 Mar 2025
25 Feb 2025
25 Feb 2025 - 21 Mar 2025
4 Mar 2025
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid