| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.4 LAdmitted-Finance ASHAA BHAVAN RAMNAGAR NAKA FAIZABAD | AYODHYA | UTTAR PRADESH | 224001 | L1 | Admitted-Finance | ||
| 2 | L2₹23.5 L+₹15,067.83 (0.64%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹23.5 L+₹16,245 (0.69%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹27.8 L
Closing Date
11 Jul 2026, 4:00 pmClosed
Executive Officer Jalalabad
Executive Officer Jalalabad
Nagar Panchayat Jalalabad prangan me Hall evm Tin Shade ka nirman karya
2026_DOLBU_1164677_4
3188/MPJ/ENS/NPJ/2026-27
Open Tender
Civil Works
Percentage
JALALABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,310
Yes
Executive Officer Jalalabad
Yes
18 Jul 2026
29 Jun 2026
11 Jul 2026
29 Jun 2026
11 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of brick work in cement mortar and including stacking of 1 material as directed by Engineer incharg.with in distance of 60 meter SI No. 692 | - | CUM | - | - |
| 2 | Dismentling of reinforced cement concrete or reinforced brick work 2 including stacking of material as directed by Engineer incharg.with in distance of 60 meter SI No. 694 | 1 | Cum | - | - |
| 3 | Dismantling of old interlocking tiles
including stacking of dismentled material. | - | SQM | - | - |
| 4 | Disposal of dismantled materials up to 5.00 KM distance complete with labour T&P etc at site. S.I No-231(a) 100% disposal of excavated materials. | 1 | Cum | - | - |
| 5 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. S.I No-251 | - | Cum | - | - |
| 6 | Cement Concrete with 40min gauge stone ballast, fine sand and cement in proportion of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of the work as per site direction of engineer in charge. (S.1-281) | - | Cum | - | - |
| 7 | RCC work with cement, approved coarse sand and 40 mm gauge approved stone ballast, coarse sand and cement, in the 7 proportion of 3:1.5:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. S,I Chap 20 SI 287 a | - | Cum | - | - |
| 8 | RCC work with cement, approved coarse sand and 20 mm gauge approved stone ballast, coarse sand and cement, in the 8 proportion of 3:1.5:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. S.I Chap 20 SI 289 | - | Cum | - | - |
| 9 | M-150 Brick Work with cement and coarse sand in proportion of 1:4 in foundation and plinth including supply of all materials labour. Tools & plants etc. required for proper completion of the work S.I No 305 A | 1 | Cum | - | - |
| 10 | RCC work with cement, approved coarse sand and 20mm gauge approved stone ballast, coarse sand and cement, in the proportion of 3:1.5:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. Chap 20 SI 285 | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_2184512.xls
BOQ • 0.32 MB
Tender.pdf
Tender Documents • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .