Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.5 L+₹5,520.49 (2.30%)Admitted-Finance 40 1 CHAW MANDI ROORKEE UTTARAKHAND 247667 INDIA | HARIDWAR | UTTARAKHAND | 247667 | L2 | Admitted-Finance | ||
| 3 | L3₹2.5 L+₹6,480.58 (2.70%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,810
Closing Date
14 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (civil HQ)
The Executive Engineer (C )/ HQ at 48, Market Street, Kolkata - 700087
REPAIRING AND RESTORATION OF ROOM NO. 203, INCLUDING ARRANGEMENT OF FURNITURE AT 2ND FLOOR OF CMO BUILDINGS FOR FUTURE SEATING ARRANGEMENT OF INCOMING OFFICERS.
2026_KMC_1044534_1
KMC/DG(C)/EEC/HQ/26-27
Open Tender
CIVIL WORKS
Percentage
15 days
KMC AREA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4,810
3 Nov 2026
6 Oct 2026
27 Oct 2026
6 Oct 2026
14 Oct 2026
6 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (G) WOOD AND PVC WORKS A. DOOR WINDOW FRAME 1. Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). (e) Sal : Malayasian Note: Extra for Lifting Charges for each additional floor, i) Rs. 200/- per Cu.m (upto 4th floor) ii) Rs.250/-(above 4th floor) | 0.07 | M3 | 83,618 | ₹6,020.5 |
| 2 | BUILDING WORKS (G) WOOD AND PVC WORKS G. WALL PANELLING 3. Supplying, fitting and fixing boiling water resistant ply conforming to IS: 303-1989 bonded with phenol formaldehyde synthetic resin of approved make and brand fitted and fixed as per design as per approval and direction of Engineer-in- Charge.[excluding the cost of supporting frame work and teak wood batten/Lipping] In Ground Floor (ii) 6mm .(Note: For Boiling Water Resistant Block Boards reduce the above rates by 5%). For upper floor refer Item H (4) for item 1, 2, 3, 4 under subhead G | 17.15 | SQM | 951 | ₹16,313.45 |
| 3 | BUILDING WORKS (G) WOOD AND PVC WORKS G. WALL PANELLING 3. Supplying, fitting and fixing boiling water resistant ply conforming to IS: 303-1989 bonded with phenol formaldehyde synthetic resin of approved make and brand fitted and fixed as per design as per approval and direction of Engineer-in- Charge.[excluding the cost of supporting frame work and teak wood batten/Lipping] In Ground Floor (vi) 19mm.(Note: For Boiling Water Resistant Block Boards reduce the above rates by 5%). For upper floor refer Item H (4) for item 1, 2, 3, 4 under subhead G | 44.66 | SQM | 1,899 | ₹84,813.14 |
| 4 | BUILDING WORKS (G) WOOD AND PVC WORKS G. WALL PANELLING 14Supplying fitting, fixing decorative lamination conforming to IS: 2046 : 1995 as per approved make, brand, finish and thickness with fitting, fixing the same on Particle/MDF / Ply Boards with recommended / approved adhesive with proper clipping the sides for better attachment as per direction of Engineer-incharge. The rate includes the cost of labour, adhesive and all incidental charges thereof.In ground floor Glossy/Matt/Suede excluding surface texture or metallic lustre.(i) Thickness of laminate 1.5mm (For upper floors refer to item H(4) for items 13, 14, 15, 16 under subhead G | 40.63 | SQM | 802 | ₹32,585.26 |
| 5 | BUILDING WORKS(R) ALUMINIUM WORKS??(9)Supplying bubble free float glass of approved make and brand conforming to IS: 2835-1987.i) 4mm thick clear glass. | 3.22 | SQM | 398 | ₹1,280.37 |
| 6 | BUILDING WORKS(R) ALUMINIUM WORKS??(9)Supplying bubble free float glass of approved make and brand conforming to IS: 2835-1987. vii) 8mm thick clear glass. | 1.62 | SQM | 848 | ₹1,373.76 |
| 7 | BUILDING WORKS (G) WOOD AND PVC WORKS F. REPAIR WORKS 6.Providing and fixing of false ceiling with powder coated exposed G.I. grid suspension system (E-Grid U-1520 or equivalent load carrying capacity with mid span deflection not exceeding 1/360 span with hanger spacing of 1200mm c/c ) consisting of Main Runner 3600 mm long, Cross Tee 1200 mm / 600 mm long and Wall Angle. The Wall Angle shall be fixed on PVC Dash Fasteners on the perimeter of the wall by steel screws with distance 300mm c/c. The Main Runners to be placed @ 1200 mm. The Cross Tee 1200mm will be inserted in the pre-cut slots of Main Runner at a regular interval of 600 mm to form a modular grid of 1200mm X 600mm. Additional Cross Tees of 600 mm shall be placed perpendicular to the Cross Tee 1200 mm long to finally form a grid of 600 mm X 600 mm. Grid of module size 600 mm X 600 mm shall be supported by 6 mm dia G.I. wire from purlins / soffit. 15mm thick OW Acoustic Board (Mineral Fiber Acoustic Ceiling Tiles) of approved patern and size 595mm X 595mm with NRC value > 0.65 should be placed in the Grid module to form a False Ceiling. All complete as per the drawing & directions of Engineer-in-charge. In ground floor.a) Acoustic False Ceiling (with 15mm thick OW Acoustic Board and E-Grid U-1520)(For upper floors refer to item H (4) for items 1 to 7 under subhead F) | 2.52 | SQM | 1,385 | ₹3,490.2 |
| 8 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 8.64 | SQM | 19 | ₹164.16 |
| 9 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018) | 8.64 | SQM | 202 | ₹1,745.28 |
| 10 | BUILDING WORKS (K) PAINTING, VERNISHING ETC?(B)MISCELLANEOUS ITEMS.(5)(b) Rendering the surface of walls and ceiling with white cement based wall putty of approved make and brand(1.5mm thick) | 14.89 | SQM | 110 | ₹1,638.34 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_2561795.xls
BOQ • 0.33 MB
form_041.pdf
Tender Documents • 1.17 MB
C1.pdf
Additional Documents • 4.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .