Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC SANCTORIA NO 12 PO DISHERGARH ASANSOL DIST PASCHIM BURDHWAN W B 713333 | ASANSOL | PASCHIM BURDHWAN | WEST BENGAL | 713333 | L1 | Accepted-AOC Awarded as per approved TCR | |
| 2 | Rejected-Technical SRIPUR NAZIR PARA PS JAMURIA DIST PASCHIM BURDWAN WEST BENGAL 713373 | JAMURIA | PASCHIM BURDWAN | WEST BENGAL | 713373 | - | Rejected-Technical Rejected as per approved TCR | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejected as per approved TCR |
Tender Value
₹7.9 L
EMD Value
₹10,000
Closing Date
2 Oct 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager Satgram-Sripur Area
Office of the General Manager, Satgram-Sripur Area, PO-Devchandnagar, WestBengal-713332
Providing Barbed wire Fencing with R.C.C post around OB Dump at SSI (nigha) OCP Under Satgram-Sripur Area
2024_ECL_317656_1
ECL/SSA/GM/AE(C)/e-T/24-25/21 Date.14.09.2024
Open Tender
Civil Works - Others
Percentage
45 days
SSI Nigha OCP
As per NIT
3 documents required · 3 mandatory
₹10,000
22 Mar 2025
17 Sept 2024
4 Oct 2024
18 Sept 2024
2 Oct 2024
18 Sept 2024
18 Sept 2024 - 21 Sept 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 52.73 | M3 | 190.35 | ₹10,037.16 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 40 mm nominal size). | 33.41 | M3 | 6,253.9 | ₹2,08,942.8 |
| 1.03 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing :1:1½:3 (1 cement : 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 8.25 | M3 | 8,368.2 | ₹69,037.65 |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 164.92 | M2 | 305 | ₹50,300.6 |
| 1.05 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 2,132.34 | kg | 98.9 | ₹2,10,888.43 |
| 1.06 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | 10,881.4 | M | 11.25 | ₹1,22,415.75 |
| 2.01 | Total impact of GST for the purpose of CTC | 1 | no | - | - |
techsummary_329227.pdf
PDF • 0.09 MB
finsummary_329227.pdf
PDF • 0.09 MB
WONIT21.pdf
PDF • 1.21 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tendernotice_2.pdf
Tender Document • 1.08 MB
Tendernotice_1.pdf
Tender Document • 0.69 MB
BOQ_329227.xls
BOQ • 0.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .