| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC | ₹13.1 L | L1 | Accepted-AOC 1312433.75 |
| 2 | L2₹13.3 L+₹22,418.41 (1.71%)Rejected-Finance | ₹13.3 L+₹22,418.41 (1.71%) | L2 | Rejected-Finance L2 |
| 3 | L3₹13.5 L+₹36,771.66 (2.80%)Rejected-Finance | ₹13.5 L+₹36,771.66 (2.80%) | L3 | Rejected-Finance L3 |
Tender Value
₹13.7 L
EMD Value
₹1.4 L
Closing Date
26 May 2026, 3:00 pmClosed
CEO GIDA
GIDA SECTOR 7 GIDA GORAKHPUR
Construction of boundary wall and Drain of the Park in front of plot numbers D 78 to D 83 and E 82 to E 76 in Gida area Sector 23 Phase 1
2026_UGIDA_1144181_1
475/GIDA/2026-27 DT. 24.04.2026
Open Tender
Civil Works
Percentage
180 days
GIDA GORAKHPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
₹1.4 L
15 Jul 2026
4 May 2026
26 May 2026
4 May 2026
26 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and filling of carted earth from a distance not exceeding 7 KM from the site of work and including cost of earth and all materials, labour T & P etc. Earth work in cutting or embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50mtr. in depth and earth work in embankment & subgrade and earthen shoulders to be in 20cm Layers, including ramming and dressing the surface to required levels and slops and also including 1.5 meter lift and 30 meter lead. (Good Earth brought from out side away from GIDA notified area) MORTH Srno. 3.16 Specification 305. | 105.15 | Cum | 250 | ₹26,287.5 |
| 2 | Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. | 20.13 | Cum | 5,960 | ₹1,19,974.8 |
| 3 | M 150 class brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. | 75.96 | Cum | 4,555 | ₹3,45,997.8 |
| 4 | 12mm Thick plaster with cement mortar in proportion of 1:4 cement and Coarse sand over brick work minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper comletion of the work. (including racking & washing surface) | 201.5 | Sqm | 135 | ₹27,202.5 |
| 5 | Cast cement concrete door sills, chaukhats boundry posts, shelves and similar small work with cement, approved coarse sand and 2 cm (3/4)"gauge' approved stone grit in the proportion of 1:2:4 excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire, and including the cost of binding wire, moulds and all otehr materials, labour and T&P etc. required for proper completion of the work. | 4.56 | Cum | 7,510 | ₹34,245.6 |
| 6 | Cement Concrete in m20 complete as per Drawing and Technical Specifications. R.C.C. Grade M20 compaction as per Sor Rate Item no 283 & 283 A & 284 A complete in all respects. | 8.46 | Cum | 7,041 | ₹59,566.86 |
| 7 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504 only use for sail brand Tmt bar | 6.64 | Qtl | 6,798 | ₹45,138.72 |
| 8 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- 251 | 37.04 | Cum | 120 | ₹4,444.8 |
| 9 | Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. Sor No 279 | 3.53 | Cum | 5,960 | ₹21,038.8 |
| 10 | Providing Concrete For Preinforced concrete M-25 in open Foundations complete Asper Drawing and Technical Specification MoRTH Clauses 12.08 E Case II | 21.99 | Cum | 9,970 | ₹2,19,240.3 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.40 MB
Tendernotice_2.pdf
PDF • 1.50 MB
BOQ_2137569.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .