| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹3.3 LAccepted-Finance | 1st | Accepted-Finance Being the lowest tenderer. | |
| 2 | 2nd₹3.3 L+₹9,140 (2.81%)Rejected-Finance LIG 544 SECTOR 2 NILADRI VIHAR BHUBANESWAR ODISHA 751 021 | KHORDHA | ODISHA | 751021 | 2nd | Rejected-Finance Being 2nd lowest. |
Tender Value
₹3.5 L
EMD Value
₹7,063
Closing Date
27 Jan 2024, 3:00 pmClosed
EE(Civil)Bhubaneswar
3rd floor,DSB,Bhubaneswar
Construction of compound wall with Gate for providing separate entry to NIA at RTTC, Bhubaneswar.
2024_BSNL_182082_1
NIT No 44/2023-24/BCD/SDE/BBSR.
Open Tender
Civil Works
Item Rate
30 days
RTTC Bhubaneswar
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
Accounts Officer (Cash), BSNL, O/o GMTD, Bhubanesw
₹7,063
Yes
20 Feb 2024
17 Jan 2024
29 Jan 2024
17 Jan 2024
27 Jan 2024
17 Jan 2024
17 Jan 2024 - 27 Jan 2024
Amount
Sub-Head : Earth Work
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Sub-Head : Concrete Work
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 cement : 5 coarse sand(zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing :
1:1½:3 (1 cement : 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Sub-Head : Reinforced Cement Concrete
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).
Sub-Head : Masonry Work
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :
Cement mortar 1:6 (1 cement : 6 coarse sand)
Half brick masonry with common burnt clay F.P.S. (non modular) bricksof class designation 7.5 in foundations and plinth in :
Cement mortar 1:4 (1 cement : 4 coarse sand)
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.
Cement mortar 1:4 (1 cement :4 coarse sand)
Sub-Head : Steel Work
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Sub-Head : Finishing
12 mm cement plaster of mix :
1:6 (1 cement: 6 coarse sand)
15 mm cement plaster on rough side of single or half brick wall of mix :
1:6 (1 cement: 6 coarse sand)
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade
New work (Two or more coats applied @ 1.43 ltr/ 10 sqm. over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work.
RABINDRA KUMAR MALLICK
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .