Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹89,040.95Admitted-Fee/PreQual/Technical/Finance | -30.00% | ₹89,040.95 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹99,509.62+₹10,468.67 (11.8%)Admitted-Fee/PreQual/Technical/Finance | -21.77% | ₹99,509.62+₹10,468.67 (11.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.1 L+₹19,080.20 (21.4%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹1.1 L+₹19,080.20 (21.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.1 L+₹25,440.27 (28.6%)Admitted-Fee/PreQual/Technical/Finance | -10.00% | ₹1.1 L+₹25,440.27 (28.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.3 L
EMD Value
₹6,350
Closing Date
8 Jun 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
Construction of protection bund near house of Gowhar Hussain Dar and others at Footlipora
2026_RDPR_310958_4
NIT_007_REW_Budgam
Open Tender
Civil Works
Percentage
30 days
PAKHERPORA
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Yes
Executive Engineer REW Budgam
₹6,350
Yes
18 Jun 2026
25 May 2026
9 Jun 2026
25 May 2026
8 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 M² on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 3.57 | Cum | 479.3 | ₹1,711.1 |
| 0_) | Providing/Laying Stone soling Nallah/Plum hand packed on level in foundation trenches including carriages of Stones. | 6.15 | Cum | 1,218.2 | ₹7,491.93 |
| 0_) | P/L in position cement concrete of 1:3:6 Nominal mix including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate (including carriage of all materials) | 14.91 | Sqm | 6,310.45 | ₹94,088.81 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 40.15 | Sqm | 286.35 | ₹11,496.95 |
| 0_) | P/A 6mm thick cement plaster of mix 1:3 (1cement: 3 fine sand) (including carriage of all materials) . | 42.16 | Sqm | 241 | ₹10,160.56 |
| 0_) | Providing and placing in position PVC pipes of 75mm dia for staggered weep holes in R wall at specified position or as directed by the site incharge | 28 | NO | 50 | ₹1,400 |
| 0_) | Add provisions for signboard, Photographes and other unforseen items. | 1 | No | 852 | ₹852 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_1006265.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .