| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.4 CrAccepted-AOC | ₹7.4 Cr | 1 | Accepted-AOC Work Order |
| 2 | 2₹7.5 CrRejected-Finance 19 20 SIDDHIVINAYAK HERITAGE VISAVA NAKA GODOLI SATARA | PUNE | MAHARASHTRA | 412206 | ₹7.5 Cr | 2 | Rejected-Finance Reject |
| 3 | 3₹7.5 CrRejected-Finance | ₹7.5 Cr | 3 | Rejected-Finance Reject |
| 4 | 4₹7.6 CrRejected-Finance 42 4 1 DESHMUKH NAGAR JUNI MIDC ROAD GODOLI SATARA | ₹7.6 Cr | 4 | Rejected-Finance Reject |
| 5 | Not Admitted-Fee/PreQual/Technical EAGLE CONSTRUCTION | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Shree Ganesh Construction L4 | Shivratna Roadways llp L2 | Seva Enterprises L3 | VINOD JANARDHAN BORATE L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | 1) Constructio of Bridge on Bijwadi to Raijwadi to Danvlewadi Road at Ch .4/800 Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. | 0.04 | Hectare | 35,858.91 ₹1,613.65 | 35,171.89 ₹1,582.74 | 35,188.65 ₹1,583.49 | 35,021.09 ₹1,575.95 Lowest |
| 2.00 | Cost of Utility shifting & Rising | 1 | Lumpsum | 1,60,500 ₹1,60,500 | 1,57,425 ₹1,57,425 | 1,57,500 ₹1,57,500 | 1,56,750 ₹1,56,750 Lowest |
| 3.00 | Dismantling of cement concrete pavement by mechanical meansusing pneumatic tools,breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto alead of 1000 metres,stacking serviceable and unserviceable materials separately etc. complete. | 85 | Cubicmeter | 2,284.19 ₹1,94,156.15 | 2,240.43 ₹1,90,436.55 | 2,241.5 ₹1,90,527.5 | 2,230.82 ₹1,89,619.7 Lowest |
| 4.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. | 54 | Cubicmeter | 1,002.9 ₹54,156.6 | 983.69 ₹53,119.26 | 984.15 ₹53,144.1 | 979.47 ₹52,891.38 Lowest |
| 5.00 | RemovingNp-2andNp-3 class pipes including stacking at road side as directed by the Engineer in charge. Upto 900mm dia and above. etc complete | 81 | Running Meter | 1,077.49 ₹87,276.69 | 1,056.85 ₹85,604.85 | 1,057.35 ₹85,645.35 | 1,052.32 ₹85,237.92 Lowest |
| 6.00 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil | 626.14 | Cubicmeter | 717.17 ₹4,49,048.82 | 703.43 ₹4,40,445.66 | 703.76 ₹4,40,652.29 | 700.41 ₹4,38,554.72 Lowest |
| 7.00 | Ordinary rock (not requiring blasting) | 226.51 | Cubicmeter | 896.5 ₹2,03,066.22 | 879.32 ₹1,99,174.77 | 879.74 ₹1,99,269.91 | 875.55 ₹1,98,320.83 Lowest |
| 8.00 | Hard rock (requiring blasting) | 136.7 | Cubicmeter | 1,381.16 ₹1,88,804.57 | 1,354.69 ₹1,85,186.12 | 1,355.34 ₹1,85,274.98 | 1,348.89 ₹1,84,393.26 Lowest |
| 9.00 | Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 5.0 to 9.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) | 400 | Hours | 238.61 ₹95,444 | 234.04 ₹93,616 | 234.15 ₹93,660 | 233.04 ₹93,216 Lowest |
| 10.00 | Providing concrete for plain/reinforced concrete M-15 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | 19.29 | Cubicmeter | 6,645.07 ₹1,28,183.4 | 6,517.76 ₹1,25,727.59 | 6,520.87 ₹1,25,787.58 | 6,489.82 ₹1,25,188.63 Lowest |
Tender Value
₹7.1 Cr
EMD Value
₹3.6 L
Closing Date
22 Dec 2025, 5:30 pmClosed
Superintending Engineer (PMGSY) MRRDA, Pune Region
Superintending Engineer (PMGSY), Maharashtra Rural Road Development Association, Pune Region Pune, Block No. 306, 3rd Floor, New Administrative Building, Opp. Council Hall, Camp, Pune - 411 001
Package NO. ADB (II) SAT-BR-02 Tal. Man, Dist. Satara Total 06 Bridge Work
2025_MRRDA_1259755_2
E-Tender No.13/2025-26 Bridge 5 Package
Open Tender
Civil Works - Bridges
Item Rate
545 days
Satara
As per SBD and NIT
8 documents required · 8 mandatory
₹17,000
₹3.6 L
20 Aug 2026
15 Dec 2025
24 Dec 2025
15 Dec 2025
22 Dec 2025
15 Dec 2025
15 Dec 2025 - 17 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1) Constructio of Bridge on Bijwadi to Raijwadi to Danvlewadi Road at Ch .4/800 Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. | 0.05 | Hectare | 33,513 | ₹1,508.09 |
| 2 | Cost of Utility shifting & Rising | 1 | Lumpsum | 1,50,000 | ₹1,50,000 |
| 3 | Dismantling of cement concrete pavement by mechanical meansusing pneumatic tools,breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto alead of 1000 metres,stacking serviceable and unserviceable materials separately etc. complete. | 85 | Cubicmeter | 2,134.76 | ₹1,81,454.6 |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. | 54 | Cubicmeter | 937.29 | ₹50,613.66 |
| 5 | RemovingNp-2andNp-3 class pipes including stacking at road side as directed by the Engineer in charge. Upto 900mm dia and above. etc complete | 81 | Running Meter | 1,007 | ₹81,567 |
| 6 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil | 626.14 | Cubicmeter | 670.25 | ₹4,19,670.33 |
| 7 | Ordinary rock (not requiring blasting) | 226.51 | Cubicmeter | 837.85 | ₹1,89,781.4 |
| 8 | Hard rock (requiring blasting) | 136.7 | Cubicmeter | 1,290.8 | ₹1,76,452.36 |
| 9 | Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 5.0 to 9.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) | 400 | Hours | 223 | ₹89,200 |
| 10 | Providing concrete for plain/reinforced concrete M-15 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | 19.29 | Cubicmeter | 6,210.35 | ₹1,19,797.65 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.74 MB
SBDB2ADBIISATBR02.pdf
Tender Documents • 2.67 MB
BOQ_2171239.xls
BOQ • 0.51 MB
BR2GAD.pdf
Other Document • 4.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].