Loading…
Loading…
Tender Value
₹59.8 L
EMD Value
₹1.2 L
Closing Date
27 Jul 2026, 4:00 pmDue tomorrow
Ex. Engineer SND Div IIND
Darish Kadal
Construction of cement concrete drain from SKIMS Land upto Usman colony culvert near BSNL Exchange at Bemina Phase 1st
2026_HAUDD_316152_2
E-NIT NO 15 SNDII OF 2026-27
Open Tender
Civil Works
Percentage
45 days
Bemina
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,800
Ex Engineer SND Division IIND
₹1.2 L
15 Jul 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
27 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manuall means in trenches for laying of pipes, and manholes in all kinds of soil rocks including packing of mettaled roads bituminious or tar macadam road surfaces, tiled stone floors etc. The excavation job which includes all leads lfits, dressing of sides ramming of bottoms dewatering caused by any means to any extent etc. | 270.9 | Cum | 479.3 | ₹1,29,842.37 |
| 1.01 | Earth work in excavation by mechanically means in trenches for laying of pipes, and manholes in all kinds of soil rocks including packing of mettaled roads bituminious or tar macadam road surfaces, tiled stone floors etc. The excavation job which includes all leads lfits, dressing of sides ramming of bottoms dewatering caused by any means to any extent etc. | 632.09 | Cum | 256.85 | ₹1,62,352.32 |
| 2 | Providing & Laying stone soling duly packed on horizontal floor on horizantal floor including hand ramming watering and levelling to the surface. | 173.2 | Cum | 937.4 | ₹1,62,357.68 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement 4 coarse sand 8 graded stone aggregate 40mm nommal size (Crushed) | 64.94 | Cum | 5,202.9 | ₹3,37,876.33 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement 3 coarse sand 6 graded stone aggregate 40mm nommal size (Crushed) | 284.58 | Cum | 5,733.6 | ₹16,31,667.89 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement 2 coarse sand 4 graded stone aggregate 20mm nommal size (Crushed) | 11.98 | Cum | 6,591.25 | ₹78,963.18 |
| 6 | Providing and laying in position specified grade of reinforcedcement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement 2 coarse sand 4 graded stone aggregate 20mm nommal size (Crushed) | 148.51 | Cum | 7,104.35 | ₹10,55,067.02 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level . Thermo-Mechanically Treated bars of grade Fe-500D or more. | 9,549.97 | Kg | 123.2 | ₹11,76,556.3 |
| 8 | Centering and shuttering including strutting, propping etc. and removal work of form work Retaining Walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc A. Manholes Walls Internal | 648 | Sqm | 286.35 | ₹1,85,554.8 |
| 8.01 | B. Suspended floors, | 459.72 | Sqm | 718.2 | ₹3,30,170.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_1029632.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].