| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC S P MUKHERJEE ROAD MURGASOL ASANSOL 3 CORPORATION PASCHIM BARDHAMAN PASCHIM WEST BURDWAN BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹2.0 L+₹5,015 (2.57%)Rejected-Finance DANGAPARA P O KALNA BARDHAMAN 713409 WEST BENGAL INDIA | KALNA | BARDHAMAN | WEST BENGAL | 713409 | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹2.1 L+₹10,915 (5.60%)Rejected-Finance JANAI KASARIPARA PO JANAI HOOGHLY WB 712304 | HOOGHLY | WEST BENGAL | 712304 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹2.0 L
EMD Value
₹2,500
Closing Date
18 Mar 2024, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Complete repairing and overhauling of Viswa make Gear Box. (4 Stage) at Millennium Incline of Shankarpur Colliery under Bankola Area(retender)
2024_ECL_304312_1
ECL/GM/BA/E TENDER/23-24/EnM/403 Dt. 08.03.2024
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Shankarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹2,500
9 Apr 2024
8 Mar 2024
19 Mar 2024
8 Mar 2024
18 Mar 2024
8 Mar 2024
8 Mar 2024 - 12 Mar 2024
Amount
Item Description/ Heading
Cost of gear box dismantling part by part bearing and cover etc.
Cost of gear box cleaning by diesel
Cost of required welding rod for welding of welding of worn out both side bearing seating (4 stage) by CI welding rod ESAB make ferroloide (4mm) 8KG
Cost of gas (DA + Oxygen) for preheating during welding.
Cost of welding and heating charge.
Cost of machining of above welding Bearing seating as per Bearing size by line boring machine.
Cost of required welding rod ESAB make Duriod -250
Cost of DA + Oxygen
Cost of welding charges
Cost of machining of above welding shaft as per size
Cost of making of new 1st motion bearing Cap.
Cost of making of new 2nd motion bearing Cap.
Cost of 1st and 2nd motion pinion shaft both side new bearing and Distance pieces fitting by Hydraulic Pressure.
Cost of 3rd and 4th motion pinion shaft both side new bearing & Distance pieces fitting by Hydraulic Pressure.
Cost of complete gear box fitting.
Transporting charges Up and down
Total impact of GST for the purpose of CTC
ASHA ENTERPRISE
ENGINEERING ENTERPRISE
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .