Tender Value
₹20.7 L
EMD Value
₹41,500
Closing Date
3 Aug 2026, 3:00 pm
Fault detection and Rectification of HT and LT Underground cables at Carriage Workshop, Alambagh, Lucknow
ElectWAMV2272026-27
ElectWAMV2272026-27
Open
24 Months
Lucknow, Uttar Pradesh
₹0
₹41,500
10 Jul 2026
10 Jul 2026
20 Jul 2026
1-Detection of fault in underground HT/LT cable of any size by using
Detection of fault in underground HT/LT cable of any size by using electronic fault detection machine including digging of trenches and refilling to the original shape after laying of cable after rectification of fault for Alambagh Workshop.
2-Supply, laying, fixing, testing and commissioning of HT straight
185 Sq.mm, 3 Core
3-Supply, laying, fixing, testing and commissioning of LT straight
50 - 95 Sq.mm 3.5/4 core
120 - 185 Sq.mm 3.5/4 core
240-400 Sq.mm 3.5/4 core
4- Supply, laying, fixing, testing and commissioning of indoor type end
185 sq.mm, 3 core
5-Supply, laying, fixing, testing and commissioning of outdoor type end
120 - 185 sq.mm, 3 core
6-Digging of trenches (0.5 meter wide and 1.0 meter depth) by cutting
Digging of trenches (0.5 meter wide and 1.0 meter depth) by cutting of ground and 6 restoration/ finish of surface to original condition as per specifications. This item also covers necessary sand and brick work in the trenches for safety of cable complete in all respect as per specification and terms and conditions.
7- Erection, laying, testing and commissioning of LT XLPE/PVC insulated
Erection, laying, testing and commissioning of LT XLPE/PVC insulated PVC Sheathed multi-stranded armoured aluminium conductor 3½ Core/4.0 core Cable of any size (Only required LT / HT Cable to be supplied by the Railway).
8-Horizontal Directional drilling (HDD) / Boring and trenchless cabling,
Horizontal Directional drilling (HDD) / Boring and trenchless cabling, Supply, Transportation and insertion of self lubricated HDPE pipe and laying of cables in boring under the 8 track/road/ground/Masonary building by using self self lubricated HDPE pipe of 120mm outer dia and 103.5 mm inner dia in the bore under the track / road/ ground/ Masonary building. The depth of Horizontal boring should be minimum 1 Mtrs from rail flange/road level/ground as per site requirement.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
227-TenderDocFinal.pdf
ATTACHMENT
Download all tender documents and submit your bid