| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹2.9 L (2.03%)Admitted-Finance | ₹1.5 Cr+₹2.9 L (2.03%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
| Sl No | Description | Qty | Unit | R.RAMESH L1 | E CHANDRAN L2 |
|---|---|---|---|---|---|
| 1.001.Strengthening of Pandur Road Km 0/0 to 1/0 in Perumattunallur panchayat at Kattankolathur Panchayat Union. Est. Amt. - Rs.49.60 Lakh | |||||
| 2.00 | Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete | 410.4 | sqm | - | - |
| 3.00 | Earth work exavation in all classes of soils such as Hard Soil , etc. and depositing on berms with all leads and lifts and all other incidential charges. etc., complete for berms.Asper SS20A | 1,098 | cum | - | - |
| 4.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 56.25 | cum | - | - |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher | 843.75 | cum | - | - |
| 6.00 | Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. | 3,750 | sqm | - | - |
| 7.00 | Providing and Laying 50mm compacted thick bitumenious macadam using 0.20Cum of 26.5-13.2mm metal.0.43Cum of 13.26-2.36mm metal and 0.08m3 o 2.36m metal with 38Kgs of Bitumen of all materials etc complete(Using CMP & Finishing with Paver Machine) | 187.5 | Cum | - | - |
| 8.00 | Providing and laying Bituminous Concrete of 30mm Thick using 60/70 grade Bitumen which shall consist of construction of a single course binder / wearing course on a previosly prepared bituminous base to the requirement of the specificattion (Using CMP & Finishing with Paver Machine) | 112.5 | Cum | - | - |
| 9.00 | Filling gravel for shoulders and berms including all cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete | 900 | cum | - | - |
| 10.00 | Provision for KM Stone | 1 | Nos | - | - |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
30 Sept 2020, 3:00 pmClosed
Project Director Chengalpet
DRDA Chengalpet
Strenthening of 3 roads in Kattankolathur Panchayat Union Package 22 2021
2020_RDTN_179869_1
1285/2020/A9 dt 10.09.20
Open Tender
Civil Works - Roads
Item Rate
180 days
Perumattunallur
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹1.5 L
Yes
DRDA Chengalpet
6 Oct 2020
17 Sept 2020
30 Sept 2020
17 Sept 2020
30 Sept 2020
17 Sept 2020
23 Sept 2020
Amount
1.Strengthening of Pandur Road Km 0/0 to 1/0 in Perumattunallur panchayat at Kattankolathur Panchayat Union. Est. Amt. - Rs.49.60 Lakh
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Earth work exavation in all classes of soils such as Hard Soil , etc. and depositing on berms with all leads and lifts and all other incidential charges. etc., complete for berms.Asper SS20A
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc.
Providing and Laying 50mm compacted thick bitumenious macadam using 0.20Cum of 26.5-13.2mm metal.0.43Cum of 13.26-2.36mm metal and 0.08m3 o 2.36m metal with 38Kgs of Bitumen of all materials etc complete(Using CMP & Finishing with Paver Machine)
Providing and laying Bituminous Concrete of 30mm Thick using 60/70 grade Bitumen which shall consist of construction of a single course binder / wearing course on a previosly prepared bituminous base to the requirement of the specificattion (Using CMP & Finishing with Paver Machine)
Filling gravel for shoulders and berms including all cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
Provision for KM Stone
Provision for HM Stone
2.Strengthening of Kachadimangalam Road Km 0/0 to 1/0 in Thenmelpakkam panchayat at Kattankolathur Panchayat Union. Est. Amt. - Rs.48.20 Lakh
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Earth work exavation in all classes of soils such as Hard Soil , etc. and depositing on berms with all leads and lifts and all other incidential charges. etc., complete for berms.Asper SS20A
Picking the worn out BT Surface with cost and conveyance including all other labour charges etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc.
Providing and Laying 50mm compacted thick bitumenious macadam using 0.20Cum of 26.5-13.2mm metal.0.43Cum of 13.26-2.36mm metal and 0.08m3 o 2.36m metal with 38Kgs of Bitumen of all materials etc complete(Using CMP & Finishing with Paver Machine)
Providing and laying Bituminous Concrete of 30mm Thick using 60/70 grade Bitumen which shall consist of construction of a single course binder / wearing course on a previosly prepared bituminous base to the requirement of the specificattion (Using CMP & Finishing with Paver Machine)
Filling gravel for shoulders and berms including all cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
Towards the labour charges for centring th CC works and RCC works including all labour charges etc.complete.
CC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Provision for KM Stone
Provision for HM Stone
3.Strengthening of Karanaipuducheri Road to Vinaygapuram Road Km 0/0 to 0/930 in Karanaipuducheri panchayat at Kattankolathur Panchayat Union. Est. Amt. - Rs.47.60 Lakh
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Earth work exavation in all classes of soils such as Hard Soil , etc. and depositing on berms with all leads and lifts and all other incidential charges. etc., complete for berms.Asper SS20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc.
Providing and Laying 50mm compacted thick bitumenious macadam using 0.20Cum of 26.5-13.2mm metal.0.43Cum of 13.26-2.36mm metal and 0.08m3 o 2.36m metal with 38Kgs of Bitumen of all materials etc complete(Using CMP & Finishing with Paver Machine)
Providing and laying Bituminous Concrete of 30mm Thick using 60/70 grade Bitumen which shall consist of construction of a single course binder / wearing course on a previosly prepared bituminous base to the requirement of the specificattion (Using CMP & Finishing with Paver Machine)
Filling gravel for shoulders and berms including all cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Towards the labour charges for centring th CC works and RCC works including all labour charges etc.complete.
CC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Provision for HM Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
E CHANDRAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tendernotice_2.pdf
PDF • 0.52 MB
Tendernotice_3.pdf
PDF • 0.53 MB
Tendernotice_4.pdf
PDF • 0.41 MB
BOQ_215596.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .