Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC R O 115 SECTOR 24 PHASE III INDUSTRIAL ESTATE BARHI GANNAUR SONIPAT HARYANA | ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 Cr+₹1.9 Cr (81.1%)Rejected-Finance | ₹4.2 Cr+₹1.9 Cr (81.1%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.8 Cr+₹2.4 Cr (104.4%)Rejected-Finance OFFICE NO 201 A 21 SECTOR SECTOR 67 NOIDA DELHI DELHI GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹4.8 Cr+₹2.4 Cr (104.4%) | L3 | Rejected-Finance L3 |
| 4 | L4₹5.2 Cr+₹2.8 Cr (121.1%)Rejected-Finance | ₹5.2 Cr+₹2.8 Cr (121.1%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Eligible |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
25 Jul 2024, 5:00 pmClosed
Executive Engineer, SWM Division M.C Chandigarh
Room No. 612 6th floor MC Building Sector 17 Chandigarh
Supplying Installation Testing and Commissioning and AMC of Automated Municipal Solid Waste Segregation System of 10 TPH capacity at Dumping Ground Dadumajra Chandigarh.
2024_MCC_81110_2
MCC/EE/SWM/2024-25/8
Open Tender
Solid Waste Management
Item Rate
485 days
Chandigarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹10 L
29 Aug 2024
18 Jul 2024
26 Jul 2024
18 Jul 2024
25 Jul 2024
18 Jul 2024
Amount
Part A:- Capital Part; Supplying, Installation, Testing and Commissioning of Automated Municipal Solid Waste Segregation System of 10 TPH Capacity with 125 HP power rating having output efficiency of around 85% the cost of conveyors, electrical panel, cables, all accessories at Dumping Ground, Dadumajra Chandigarh with trial run of 30 Days including cost of consumables and to make the machinery in running condition complete in all respect as per the satisfaction of Engineer in Charge. (For the items, Refer the DNIT Section III ,Scope of work and Particular specifications point no. 3.3)
Part B:- AMC Part; AMC shall be of 12 Months and commence after successful completion of trial run. The plant will operate in two shifts each of 08 hours.During the period of AMC the contractor shall deploy requisite operational staff in each shift for smooth AMC of plant. Staff will properly operate and maintain the plant. The logbooks shall be maintained to the entire satisfaction of EIC. The requisite T&P and POL/Consumables shall be provided by the contractor during the period of AMC. Note: The L-1 agency shall submit the justification of rates for the quoted amount of part 'A' & part 'B'.
Thapar engineering works
JJ Waste Solution Pvt Ltd
Western Imaginary Transcon Pvt Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .