| 1 | L-1₹27.4 LAccepted-AOC AT AMBICA SAHI WARD NO 05 PO BARIPADA DIST MAYURBHA PIN 757001 | MAYURBHANJ | ODISHA | 757001 | L-1 | Accepted-AOC ACCEPTED AND AWARDED BY COMPETENT AUTHORITY | |
| 2 | L-2₹24.2 L+₹5.3 L (28.1%)Rejected-Finance | L-2 | Rejected-Finance SINCE THE BIDDER IS NOT L-1 | |
| 3 | L-3₹27.8 L+₹8.9 L (47.1%)Rejected-Finance | L-3 | Rejected-Finance SINCE THE BIDDER IS NOT L-1 | |
| 4 | L-4₹32.8 L+₹13.9 L (73.8%)Rejected-Finance AT ARYAVIHAR HATATOTA PO TALCHER DIST ANGUL ODISHA PIN 759100 | TALCHER | ANGUL | ODISHA | 759100 | L-4 | Rejected-Finance SINCE THE BIDDER IS NOT L-1 |
Tender Value
₹48.4 L
EMD Value
₹60,600
Closing Date
18 Oct 2022, 5:00 pmClosed
SO EnM LINGARAJ AREA
OFFICE OF THE GENERAL MANAGER, LINGARAJ AREA, AT/PO- DEULBERA COLLIERY, DIST- ANGUL, ODISHA, 759102
Removal/cleaning of spillage coal, mud and muck around Feeder Breaker Ckt. 3,4,5,6 and 7, breaking the big coal lump including hiring of earth cutting machine for cleaning etc in all three shifts for a period of 1 year in Lingaraj CHP, MCL
2022_MCL_258513_1
GM/LA/SO/EnM/e-Ten/22-23/29 DT-06.10.22
Open Tender
Miscellaneous Works
Item Rate
365 days
LINGARAJ OCP
AS PER NIT
3 documents required · 3 mandatory
₹60,600
26 Dec 2022
7 Oct 2022
20 Oct 2022
8 Oct 2022
18 Oct 2022
8 Oct 2022
8 Oct 2022 - 11 Oct 2022
Amount
Removal of spillage coal, mud & muck around Feeder Breaker Ckt. 3,4,5,6&7 picked from different places like Walkways, Platforms, Ground, Deck Plates, Seal Plates, tail end, Discharge end etc and stacking at different places manually (using hand shovel, buckets etc) as per the convenience, cleaning these spillage coal by stacking and then feeding the stacked coal into the belt conveyor manually in all three shifts as and when required basis as per the direction of Engineer In-charge. NOTE: The Contractor has to deploy manpower depending upon the coal handled by CHP in previous day as per derived per Tonne man shift i.e 0.483 Man shift/Te. Example: If the coal handled by CHP on 15.06.2022 is 15000.00Te, then the spillage coal is 0.36% X 15000.00 Te= 54 Te. So manpower to be deployed by Contractor on 16.06.2022 is 54 Te X 0.483 Man shift/Te = 26.082 i.e 26 manpower and so on.
Removal/cleaning of coal available in receiving hopper of Feeder Breakers for maintenance work of conveyor chain snapping or conveyor chain repairing work etc and then feeding the stacked coal into the belt conveyor or receiving hopper manually as and when required basis as per the direction of Engineer In-charge. NOTE: The Contractor has to deploy the manpower depending upon the requirement for chain maintenance etc by EIC as per derived per Tonne man shift i.e 0.444 Man shift/Te. Example: If conveyors chain has been snapped in two feeder breakers simultaneously and the available coal in receiving hopper on 15.06.2022 is 40Te, then manpower to be deployed by Contractor on 16.06.2022 is 40 Te X 0.444 Man shift/Te = 17.76 i.e 17 manpower.
Breaking of big lump coal by deployment of unskilled manpower in all 3 nos. of shifts as and when required basis (min. 3 unskilled manpower/day or more as per the direction of Engineer In-charge)
Hiring of Earth cutting machine like JCB with bucket capacity not less than 0.30 cu. Meter including cost of diesel, other lubricants, driver, etc. all complete as and when required basis as per the direction of Engineer in-charge. Per Month 16 hours.
Total impact of GST for the purpose of CTC
M/S. LELIN CONSTRUCTION
Raghunandan Gupta
MS PRAVAKAR ENGINEERING
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_267326.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .