Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.9 LAccepted-Finance | 1 | Accepted-Finance OK | |
| 2 | 2₹27.4 L+₹54,740.40 (2.04%)Accepted-Finance | 2 | Accepted-Finance OK | |
| 3 | 3₹28.1 L+₹1.2 L (4.60%)Accepted-Finance | 3 | Accepted-Finance OK | |
| 4 | 4₹28.7 L+₹1.8 L (6.74%)Accepted-Finance 208 L MODEL TOWN LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | 4 | Accepted-Finance OK | |
| 5 | 5₹32.8 L+₹5.9 L (21.9%)Accepted-Finance | 5 | Accepted-Finance OK |
| Sl No | Description | Qty | Unit | S K Developers L2 | JAIN TRADERS L5 | S.K.Construction Company L4 | SYMMETRY DESIGN L3 | M/s Radheshyam L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Removing of complaints of sewer blockage and desilting of sewer manholes , stores and maintenance of the system , maintenance of sewegae disposal system , desilting of manholes , cleareance of blockages in sewer line . Detection and reporting of missing manholes cover . disconnection of unauthorised connection . Maintenance of sewer system in field. he is also responsible to clean the premises | 3,120 | Per Day | 770 ₹24,02,400 | 900 ₹28,08,000 | 804 ₹25,08,480 | 788 ₹24,58,560 | 763.25 ₹23,81,340 Lowest |
| 2.00 | [email protected]% on labour cost | 3,120 | Per Day | 21.77 ₹67,922.4 Lowest | 33 ₹1,02,960 | 23.07 ₹71,978.4 | 22.59 ₹70,480.8 | 23.07 ₹71,994 |
| 3.00 | EPF@13% on labour cost | 3,120 | Per Day | 87.1 ₹2,71,752 | 117 ₹3,65,040 | 92.3 ₹2,87,976 | 90.35 ₹2,81,892 | 75 ₹2,34,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹51,000
Closing Date
12 Aug 2025, 3:00 pmClosed
Ashok Vihar
Ashok Vihar
Engagement of 10 nos unskilled workers for maintenance of sewerage system at Madipur store in AC-26 Madipur under EE(D)-066 Re-invited
2025_DJB_276106_2
Press NIT NO 21 (2025-26) EE (D) -61
Open Tender
Civil Works
Works
365 days
Madipur
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Online through sab paisa link
₹51,000
14 Aug 2025
28 Jul 2025
12 Aug 2025
28 Jul 2025
12 Aug 2025
28 Jul 2025
Amount
Removing of complaints of sewer blockage and desilting of sewer manholes , stores and maintenance of the system , maintenance of sewegae disposal system , desilting of manholes , cleareance of blockages in sewer line . Detection and reporting of missing manholes cover . disconnection of unauthorised connection . Maintenance of sewer system in field. he is also responsible to clean the premises
[email protected]% on labour cost
EPF@13% on labour cost
S K Developers (BID ID -1610773)
SYMMETRY DESIGN (BID ID -1611328)
S.K.Construction Company (BID ID -1611479)
JAIN TRADERS (BID ID -1611174)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .