| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | L1 | Accepted-AOC Low Quoted | |
| 2 | L2₹7.8 L+₹1.1 L (17.3%)Rejected-AOC BAMBOOFLAT SOUTH ANDAMAN | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | L2 | Rejected-AOC High Quoted | |
| 3 | L3₹8.0 L+₹1.3 L (20.1%)Rejected-AOC | L3 | Rejected-AOC High Quoted | |
| 4 | Rejected-Technical | - | Rejected-Technical Due to submitted experience not fulfilling the eligibility criteria |
Tender Value
₹8.3 L
EMD Value
₹16,606
Closing Date
10 Mar 2023, 3:00 pmClosed
Executive Engineer
Executive Engineer (PRI) South Andaman Division-I No. J/4, Old Councilor Bungalow, Junglighat, Port Blair, South Andaman
Conversion of CC Footpath to CC Road from Village Road (Zilla Parishad) to Rehman house at North Bay-02 under Hope Town Gram Panchayat.
2023_RDPRI_9535_1
EE/PRI/SAD-I/RR/2022-23/122
Open Tender
Civil Works - Others
Works
150 days
Hope Town
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer, GPPS
₹16,606
30 Jul 2024
27 Feb 2023
10 Mar 2023
28 Feb 2023
10 Mar 2023
28 Feb 2023
Amount
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
Cement concrete pavement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete.
Centring and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete.
12 mm cement plaster of mix :
1:4 (1 cement: 4 fine sand)
SELVARAJ
Rising Construction Co-Operative Society Ltd
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .