District WC Officer ZPMI Division Amravati
District WC Officer ZPMI Division Amravati
REPAIRS TO VILLAGE TANK AT BHULORI TQ. CHIKHALDARA. DIST. AMRAVATI
2026_AMRAV_1321865_5
EE/AMT/ZP/MI/TEN/1452/07/26-27
Open Tender
Civil Works
Percentage
270 days
AT BHULORI TQ. CHIKHALDARA. DIST. AMRAVATI
REPAIRS TO VILLAGE TANK AT BHULORI TQ. CHIKHALDARA. DIST. AMRAVATI
4 documents required · 4 mandatory
₹2,360
₹10,000
28 Jul 2026
28 Jul 2026
6 Aug 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No :- 1 Cleaing grass and removal of Rubbish upto a distance of 50 m outside the periphery of the area as directed with all lead and lifts as directed by Engineer-In-Charge | 4,000 | Sqm | 4.67 | ₹18,680 |
| 2 | Item No 2:-Excavation in Hard Murum Including boulders upto 0.6 m diameter for canel, seating of embakment, filter belt, catch water drains etc and placing the excavated stuff neatly in dump area or for the formation of the service road / embakment including cost of all materials, mechinery , labour , dressing bed and sides to required level and profile etc complete with all lead and lifts as directed by Engineer-In-Charge | 362.21 | Cum | 54.33 | ₹19,678.87 |
| 3 | For Submergence | 3,500 | Cum | 30 | ₹1,05,000 |
| 4 | Item No 3:-Excavation in Soft Rock without Blasting Including boulders upto 0.6 m diameter for canel, seating of embakment, filter belt, catch water drains etc and placing the excavated stuff neatly in dump area or for the formation of the service road / embakment including cost of all materials, mechinery , labour , dressing bed and sides to required level and profile etc complete with all lead and lifts as directed by Engineer-In-Charge | 82.5 | Cum | 91.55 | ₹7,552.88 |
| 5 | Item No 4:-Excavation in Hard Rock of all Toughness by breaker Including boulders upto 0.6 m diameter for canel, seating of embakment, filter belt, catch water drains etc and placing the excavated stuff neatly in dump area or for the formation of the service road / embakment including cost of all materials, mechinery , labour , dressing bed and sides to required level and profile etc complete with all lead and lifts as directed by Engineer-In-Charge | 72 | Cum | 608.66 | ₹43,823.52 |
| 6 | Item no :- 5 Dismentalling Dry Rubble Stone Pitching including stacking all material with 15 m lead etc complete as directed by Engineer-In-Charge | 111.37 | Cum | 41.55 | ₹4,627.42 |
| 7 | Item No 6:- Providing cut off trench filling using selected impervious soil from approved borrow areas (Government acquired land) including cost of all materials, machinery, labour, all other machinery, labour all other operations such as collection of soil, spreading soil in layer of specified thickness , sorting out , breaking clods , leveling , sectioning edges / sides , watering , compacting each layer to density control of not less than 95 % or as stipulated using vibratory compactor including cost of water etc complete with lead upto 1 km and lifts as directed by Engineer-In-Charge | 476.71 | Cum | 339.88 | ₹1,62,024.19 |
| 8 | Item no 7 :- Providing hearting embankment using selected impervious soil from approved borrow areas (Government acquired land) including cost of all materials, machinery, labour, all other machinery, labour all other operations such as collection of soil, spreading soil in layer of specified thickness , sorting out , breaking clods , leveling , sectioning edges / sides , watering , compacting each layer to density control of not less than 95 % or as stipulated using vibratory compactor including cost of water etc complete with lead upto 1 km and lifts as directed by Engineer-In-Charge | 349.7 | Cum | 320.27 | ₹1,11,998.42 |
| 9 | Item no 8 :- Providing casing embankment using selected pervious material available directly from excavation including cost of all materials, machinery, labour, all other machinery, labour all other operations such as collection of material, spreading material in layer of specified thickness , sorting out , breaking clods , leveling , sectioning edges / sides , watering , compacting each layer to density control of not less than 95 % or as stipulated using vibratory compactor including cost of water etc complete with lead upto 1 km and lifts as directed by Engineer-In-Charge | 779.04 | Cum | 84.88 | ₹66,124.92 |
| 10 | Item no 9 :- Providing and laying polythine film of 031 properly manufactured from 100% virgin granules confirming to IS 2508-1984 with 1.5 to 2.5 m packege in rolls etc complete as directed by Engineer In Charge | 629.21 | Sqm | 191.7 | ₹1,20,619.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.36 MB
5TenderBookletBhuloriVTR.pdf
Tender Documents • 5.05 MB
APPENDIX.pdf
Other Document • 0.47 MB
BOQ_2264846.xls
BOQ • 0.28 MB
5PartBBhuloriVTR.pdf
Additional Documents • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].