Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAMALAKSHMANAN TNEB CONTRACT L1 |
|---|---|---|---|---|
| 1.00 | Loading, Transporting and unloading of poles and associated materials from substore/vellore to bagayam section work spot upto 10 kms | 29 | Per Pole | 2,625 ₹76,125 Lowest |
| 2.00 | Excavation and erection of 8.0m pole | 22 | Per Pole | 1,050 ₹23,100 Lowest |
| 3.00 | Excavation and erection of 9.0m pole | 7 | Per Pole | 1,250 ₹8,750 Lowest |
| 4.00 | Excavation, erection of stay set complete for HT/LT pole | 13 | each | 1,000 ₹13,000 Lowest |
| 5.00 | Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy) | 12.33 | Per Km | 2,300 ₹28,354.4 Lowest |
| 6.00 | Stringing of 7/3.35 AAAC size of conductor (circuit length as mentioned in sanction copy) | 1.49 | Per Km | 2,800 ₹4,169.2 Lowest |
| 7.00 | Stringing of 7/4.09 AAAC size of conductor (circuit length as mentioned in sanction copy) | 0.5 | Per Km | 3,300 ₹1,653.3 Lowest |
| 8.00 | Erection of Double pole Dp with complete materials including support jumper and tapping cross arm with single earth including painting using distember with cost of paint | 1 | per Stru | 14,900 ₹14,900 Lowest |
| 9.00 | Erection of 11 kv Single pole Structure including erection of DT complete without centre support (data as per Annexure III) including fixing of MCD Box | 1 | per Stru | 12,310 ₹12,310 Lowest |
| 10.00 | Fixing of HT TI Fitting | 15 | each | 60 ₹900 Lowest |
Tender Value
Refer Docs
Closing Date
24 Aug 2026, 2:00 pmClosed
EE Vellore
Gandhi Nagar Katpadi
Works Contract for Extension of supply works in HT LT feeders for erection poles ,transporting of poles, paving HT LT Line in various work orders in respect of Assistant Engineer O M Bagayam section in AEE O m Urban II Vellore Sub Division of Vell
2026_EB_693485_2
EEVLR029
Limited
Electrical and Maintenance Works
Works
180 days
bagayam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
2 Sept 2026
12 Aug 2026
25 Aug 2026
12 Aug 2026
24 Aug 2026
12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Loading, Transporting and unloading of poles and associated materials from substore/vellore to bagayam section work spot upto 10 kms | 29 | Per Pole | - | - |
| 2 | Excavation and erection of 8.0m pole | 22 | Per Pole | - | - |
| 3 | Excavation and erection of 9.0m pole | 7 | Per Pole | - | - |
| 4 | Excavation, erection of stay set complete for HT/LT pole | 13 | each | - | - |
| 5 | Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy) | 12.33 | Per Km | - | - |
| 6 | Stringing of 7/3.35 AAAC size of conductor (circuit length as mentioned in sanction copy) | 1.49 | Per Km | - | - |
| 7 | Stringing of 7/4.09 AAAC size of conductor (circuit length as mentioned in sanction copy) | 0.5 | Per Km | - | - |
| 8 | Erection of Double pole Dp with complete materials including support jumper and tapping cross arm with single earth including painting using distember with cost of paint | 1 | per Stru | - | - |
| 9 | Erection of 11 kv Single pole Structure including erection of DT complete without centre support (data as per Annexure III) including fixing of MCD Box | 1 | per Stru | - | - |
| 10 | Fixing of HT TI Fitting | 15 | each | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_833811.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .