21 Nov 2022, 2:00 pmClosed
EE/PALLIKONDA
O/o.THE EXECUTIVE ENGINEER, KOTHAVAL STREET, PALLIKONDA.
Execution of 2nos OHT and 3nos AGL service works by erection of 5nos single pole mounted structure in respect of AE/Rural/Anaicut section in Anaicut subdivision
2022_EB_264263_1
043/2022-23/DT.16.11.2022
Open Tender
Electrical Works
Works
365 days
RURAL/ANAICUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,500
Yes
29 May 2023
16 Nov 2022
22 Nov 2022
16 Nov 2022
21 Nov 2022
16 Nov 2022
Amount
Excavation of Pole Pits/Stay Set:
For pole upto 8.0m length by using JCB/Manual
In rocky area(common to all size of poles) by blasting/Manual
Excavation of Stay pit of 4.5' to 5' depth using JCB/Manual
Erection of Poles and Accessories
Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual
Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding etc.
Fixing of line materials
Fixing of HT V Cross arms 3 1/2, 4 1/2 & 5 feet, Tapping cross arm & Guarding cross arm
Fixing of LT 3 Phase cross arm
Fixing of LT single Phase cross arm
Fixing of HT / LT TI Fitting
Fixing of HT Pin Insulators (11/22/33KV)
Fixing of LT Pin Insulators
Fixing of HT 11KV stain disc
Fixing of Tapping cross arm per cut point upto 33KV line including fixing of Discs, insulators and Jumpering etc
Fixing of LT Shackle
Fixing of Aluminium knob
Paving and Stringing of conductor
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor
Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR
Erection of Distribution Transformers:
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. Above 25 KVA to 100 KVA
Erection of 11KV Single pole structure including erection of DT complete without centre support
Concreting Works
Concreting with 1:4:8 mix using 40mm jelly including curing (material +labour) mass concreting of poles
Earthing
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
Loading/Unloading Charges
Loading or Unloading of DT upto 100KVA
Loading of various size of REC, RCC,PSC Poles upto 8.0m length from Road side.
Loading of various size of REC, RCC,PSC Poles above 8.0m length from Roadside.
Unloading of various size of REC, RCC,PSC Poles upto 8.0m length to pole pit
Unloading of various size of REC, RCC,PSC Poles above 8.0m length to pole pit
Loading of conductor
Unloading of conductor
Loading / Unloading of Iron & Steel
Loading / Unloading of line material
Transportation charges
Transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) upto 5Km from Vadakathipatty stores to Anaicut SS
Above 5 KM of lead of every KM
Transporting of Distribution Transformer from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry)
Transporting of Line materials from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry)
Dismantling of Line Materials
Dismantling of RCC, REC, PSC & Metal poles of all sizes including the closing of pit
For breaking the mass concrete of all supports
Dismandling of conductor of Upto 7/3.35 including Transporting the conductor to the nearest road side and stocking in coils
Dismandling of conductor of above 7/3.35 including Transporting the conductor to the nearest road side and stocking in coils
Dismantling of Cross arm clamps, TI fittings hardwares, insulators etc.
WORKSHOP CHARGES :-
Manufacturing/ Altering of clamps
Drilling of holes in the structure materials clamps etc.
AB switch or open type side arm stud, cutting and drilling holes.
Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe
GENERAL
Clearing of Tree brances of coconut tree
Clearing of Tree brances of Neem, Tamerined, country etc
Cleaaring of Branches/ Trees with JCB
Satutory Compliance Expense @1.5% should be Entered by the Bidder
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .