Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | L1 | Accepted-AOC accept | |
| 2 | L2₹3.5 L+₹12,191 (3.60%)Rejected-AOC 00 INFRONT OF S R K PG COLLEGE KOTLA ROAD OM MARKET FIROZABAD UTTAR PRADESH 283203 | FIROZABAD | UTTAR PRADESH | 283203 | L2 | Rejected-AOC reject | |
| 3 | L3₹4.2 L+₹80,418.79 (23.7%)Rejected-AOC | L3 | Rejected-AOC reject |
Tender Value
₹3.4 L
EMD Value
₹3,400
Closing Date
10 Oct 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EWC
Bareilly
Increasing capacity of 33/11 KV S/S Samrer, Budaun
2023_MVVNL_845340_1
44/EWC(B)/2023-24
Open Tender
Electrical Works
Item Rate
Budaun
As per tender form
3 documents required · 3 mandatory
₹1,180
SE EWC
₹3,400
3 Apr 2024
2 Oct 2023
10 Oct 2023
2 Oct 2023
10 Oct 2023
2 Oct 2023
Amount
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone.
M.S. Channel 125x65mm
M.S.Angle 75x75x8mm
33 KV Lightening Arrestor
Structure of fuse set
Control pannel I/C for 33 KV Single T/F
33KV Fuse Set.
DC supply system with one no. float cum boost charger & 01 battery set for 24V. DC supply system with 200A.H. battery capacity with cabnet
Earthing of indoor & outdoor equipments of Sub-Station after proper welding of joints and painting of earth strip above soil with proper clamp etc. as per RESPO approved drawing & resistance of earthing should be not more than 2Ω as per details given below.
Making of triangular bridge by using MS electrode, GI strip 50x6mm and GI Pipe 40 mm dia with providing of well type pipe earthing upto 15 Mtr. depth below ground level including welding etc. by boaring process at T/F neutral, LA and newly erected structure including cost of GI pipe of size 40 mm dia 15 mtr. long of ISI mark.(all the required material will be supllied by the contractor).
Supply of GI strip of size 50x6mm for earthing of all newly erected structures and equipments in switchyard including cutting, fixing & proper welding with equipments. All LA will be seprately earth also as per RESPO norms. (All the required materials will be provided by firm.)
Fabrication, erection and grouting of the following structures as per RESSPO/ Approved Drawing and its, plinth 30cm above ground leval as directed by the Engineer Incharge (All steel sections will be provided by Deptt).
33 KV Fuse set Structure
Installation of followig equipments on their respective structures including mechanical & electrical fixing after proper adjustment on their structure.
Lightening Arrestor
33 KV Fuse set
33 KV Bus Isolator
Dismantling of existing following damage equipments on their structure.
33 KV Lightening Arrestor
33 KV Fuse set
33 KV Bus Isolator
Complete laying and termination of copper control cables from 10 MVA power T/F, 33 KV VCB, 33 KV CT in the out door switch yard to the existing transformer relay control panel inside the control room including cost of all materials and labour required for proper completion of works as per RESSPO drawings, including cost of testing of transformer, VCB, CT, relay pannel & proper relay settings as per requirement etc.
Control Cable 4x2.5 mm2
Control Cable 2x2.5 mm2
Repairing of existing 33kv VCB at sub-station including repalcement of all required accessories as motor, intrruptor etc. All type of material should be provided by the firm.
Erection & testing of 1 No. single T/F Control penel in substation control room including grouting of anchor bolts of panel and making of pocket for control cable to insert in panel from trench and complete filling of control room's tranches by river sand.
Painting of the fabicated structures with one coat of red oxide primer and two coats of synthetic enamel alumm. Paint/green paint of ISI Mark alongwith earthing strip above ground level.
Safely shifting and dragging of 33/11 KV 5 MVA transformer from its plinth to safe site at Sub-station. Including its proper disconnecting of HT, LT side connection, neutral , Body earthing etc.
Shifting and dragging of 33/11 KV 10 MVA transformer from road side to its plinth alongwith its erection including fixing of all assessories and top-up of T/F oil.
Carriage of old scrap material from site to store center Bareilly.
Complete repairing of switchyard fencing.
SHREE KRISHNA TRADING CO
M/S SUPER ENGINEERING TRADERS
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .