Loading…
Loading…
Tender Value
₹17.2 L
EMD Value
₹17,200
Closing Date
17 Jul 2026, 5:30 pm
ADDITIONAL CHIEF ENGINEER, MECHANICAL CIRCLE, BBSR
O/O THE ADDITIONAL CHIEF ENGINEER, MECHANICAL CIRCLE, BHUBANESWAR, DELTA SQUARE
Replacement of gates and hoists of HR of Patabandha MIP in Bolagarh block under Minor Irrigation Division, Khordha for the year of 2025-26.
2026_CEMWR_134595_1
ACEM/MDB-19/2026-27
Open Tender
Mechanical Works
30 days
PATABANDHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹17,200
7 Jul 2026
7 Jul 2026
18 Jul 2026
7 Jul 2026
17 Jul 2026
7 Jul 2026
7 Jul 2026 - 17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply cost of structural steel and rolled steel materials of Embedded parts consisting of seal beam, guide, track arrangement etc. suitable for vent size of 1100mm x 1100mm and maximum guide length of about 2800mm for 04 nos. of gates including 5% wastage material complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 908.4 | kg | 79.21 | ₹71,954.36 |
| 2 | Fabrication cost of the above mentioned embedded parts with all accessories including machinery, fixtures, labour, cutting, aligning, welding, cleaning, finishing, including consumables,complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 1,179.72 | kg | 41.53 | ₹48,993.77 |
| 3 | Supply cost of structural steel and rolled steel materials of vertical gate consisting of skin plate, end vertical girders, horizontal girders, bronze pads, lifting brackets, seal arrangements etc. suitable for vent size of 1100mm x 1100mm complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 946.72 | kg | 79.21 | ₹74,989.69 |
| 4 | Fabrication cost of the above mentioned gate leaf with all accessories including machinery, fixtures, labour, cutting, aligning, welding, cleaning, finishing, including consumables, complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge.. | 1,018.42 | kg | 64.82 | ₹66,013.98 |
| 5 | Supply cost of structural steel and rolled steel materials of Steel Hoist Bridge consisting of pedestal, gear box frame, main beams, cross beams etc. suitable for vent size of 1100mm x 1100mm complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 0.9 | kg | 79.21 | ₹71.29 |
| 6 | Fabrication cost of the above mentioned steel hoist bridge with all accessories including machinery, fixtures, labour, cutting, aligning, welding, cleaning, finishing, including consumables, complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 2,293.52 | kg | 23.82 | ₹54,631.65 |
| 7 | Supply cost of structural steel and rolled steel materials of Restraining arrangement of pedestal, gear box frame, main beams, cross beams etc. suitable for vent size of 1100mm x 1100mm complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 177.6 | kg | 79.21 | ₹14,067.7 |
| 8 | Fabrication cost of structural steel and rolled steel materials of Restraining arrangement of pedestal, gear box frame, main beams, cross beams etc. suitable for vent size of 1100mm x 1100mm complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 261.2 | kg | 23.82 | ₹6,221.78 |
| 9 | Erection, positioning, aligning, fixing, trial and commissioning including unloading and shifting upto location of all components 1st. Stage and 2nd. Stagge embedded parts, vertical gate leaf, steel hoist bridge assembly, with all accessories including machinery, labour, fixture, cutting, aligning, welding, cleaning, finishing complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 4,752.86 | kg | 52.04 | ₹2,47,338.59 |
| 10 | Painting cost of embedded parts including cleaning, degreasing, handling, cost of paint, applying of one coat primer of 40 micron thick and three coats of final paints of 100 micron each, all inclusive of labour, materials and consumables as per relevant IS code specification complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 1,179.72 | kg | 2.97 | ₹3,503.77 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
PATABANDHADTCN.pdf
Tender Documents • 1.50 MB
BOQ_599919.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid