| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 CrAccepted-AOC | ₹14.5 Cr Quoted ₹32.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹33.0 CrRejected-Finance | ₹33.0 Cr | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical B 708 SECTOR C MAHANAGAR LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹49.8 L
Closing Date
10 Mar 2025, 12:00 pmClosed
S. E. UNNAO CIRCLE, PWD UNNAO
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
WIDENING AND STRENGTHENING OF BILGRAM SANDI ALLAGANJ ROAD (SH-138) KM-26 TO PALIYA BEDIJOR TO FARRUKHABAD VIA KADHAR ROAD (MDR-108 C) CHAINAGE 5.350 TO 19.600 (LENGTH 12.560 KM, WITHOUT LENGTH OF BRIDGES) IN DISTT. HARDOI. (WITH FIVE YEARS MAINTENANC
2025_CEUCZ_1013322_1
6294/M/1MT/E-TENDER/UC/2024-25 DATE 04.12.2024
Open Tender
Civil Works
455 days
HARDOI
WIDENING AND STRENGTHENING OF BILGRAM SANDI ALLAGANJ ROAD (SH-138) KM-26 TO PALIYA BEDIJOR TO FARRUKHABAD VIA KADHAR ROAD (MDR-108 C) CHAINAGE 5.350 TO 19.600 (LENGTH 12.560 KM, WITHOUT LENGTH OF BRIDGES) IN DISTT. HARDOI. (WITH FIVE YEARS MAINTENANC
2 documents required · 2 mandatory
₹2,714
₹49.8 L
Yes
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
28 Mar 2025
3 Mar 2025
10 Mar 2025
3 Mar 2025
10 Mar 2025
3 Mar 2025
5 Mar 2025
Amount
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site,spreading, grading to required slope and compacting to meet requirement of Table.300-2. (Including labour Cess & Excluding GST)
Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2.(For Carted Earth Work) (Including labour Cess & Excluding GST)
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including labour Cess & Excluding GST)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site,spreading, grading to required slope and compacting to meet requirement of Table.300-2. Compaction only. (Including labour Cess & Excluding GST)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including labour Cess & Excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including labour Cess & Excluding GST)
Providing and applying primer coat with SS2grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. (Including labour Cess & Excluding GST)
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including labour Cess & Excluding GST)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including labour Cess & Excluding GST)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Grading-2) (Including labour Cess & Excluding GST)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2 (Including labour Cess & Excluding GST)
HUME PIPE CULVERT Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Including labour Cess & Excluding GST)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days (Including labour Cess & Excluding GST)
. Laying reinforced cement concrement pipe of 1000 mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (Including labour Cess & Excluding GST)
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations . (Including labour Cess & Excluding GST)
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. (Including labour Cess & Excluding GST)
Laying reinforced cement concrement pipe of 350 mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (Including labour Cess & Excluding GST)
U-Type Drain Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including labour Cess & Excluding GST)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Including labour Cess & Excluding GST)
Furnishing and placing reinforced cement concrete in super structure as per drawing and Technical Specifications.(M20) (Including labour Cess & Excluding GST)
Supplying fitting and placing TMT bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses. (Including labour Cess & Excluding GST)
RCC CULVERT Excavation in foundation in in Ordinary soil requring the use of special tools and plant such as pickaxes / sabbals etc. including lift up to 1.5m and lead up to 30m (100 ft) and including filling. Watering and ramming of excavated earth in to the trenches or in to the space between the structure and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer– in–charge up to distance of 30.00 m (100 ft) from the foundation trenches (S.L. No. 252)(Including labour Cess & Excluding GST)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Including labour Cess & Excluding GST)
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations . (Including labour Cess & Excluding GST)
Providing and laying of weephole in brick massonary in abutment and wing wall with 100mm dia PVC pipe extending through the full width of the structuer with slope of 1v:20 H towarddrawing force complete as per drawing and technical specification (MORTH &H-13.8/2706&2200) (Including labour Cess & Excluding GST)
Furnishing and placing reinforced cement concrete in super structure as per drawing and Technical Specifications.(M25) (Including labour Cess & Excluding GST)
Supplying fitting and placing TMT bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses. (Including labour Cess & Excluding GST)
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. (Including labour Cess & Excluding GST)
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification (Including labour Cess & Excluding GST)
Retaining Wall Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Including labour Cess & Excluding GST)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Including labour Cess & Excluding GST)
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203 (Including labour Cess & Excluding GST)
Providing and laying reinforced cement concrete M 20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 (Including labour Cess & Excluding GST)
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 (Including labour Cess & Excluding GST)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications (Including labour Cess & Excluding GST)
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification (Including labour Cess & Excluding GST)
KC Drain &Chute Drain Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Including labour Cess & Excluding GST)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Including labour Cess & Excluding GST)
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203 (Including labour Cess & Excluding GST)
Providing and laying reinforced cement concrete M 20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 (Including labour Cess & Excluding GST)
Plastering with cement mortar (1:3) in substructure/superstracutre as per technical specification. (Including labour Cess & Excluding GST)
Providing and Laying Brick soling including all Complete (Including labour Cess & Excluding GST)
Maintenance of Constructed Road for next Five Year after the actual date of completion,Total maintenace Cost 2.50% of BOQ shall be paid in the form of installment as below,The payment shall be the inclusive of cess but Excluding GST,Payment shall be done as per satisfaction of Engineer-in-Charge regarding maintenance work carried out by Contractor. (i) From Completion of 1 Year to 2nd Year 0.25% of Bill Amount.
(ii) 2nd Year to 3rd Year 0.50% of Bill Amount.
(iii) 3rd Year to 4th Year 0.75% of Bill Amount.
(iv) 4th Year to 5th Year 1.00% of Bill Amount.
M/S ANMOL ASSOCIATES (BID ID -5035224)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf