| 1 | L1₹3.2 CrAdmitted-Finance MELAIYUR | ₹3.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.2 Cr+₹37,866.45 (0.12%)Admitted-Finance | ₹3.2 Cr+₹37,866.45 (0.12%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PALANIVEL L2 | Abi Construction L1 |
|---|---|---|---|---|---|
| 1.00Construction of Cement concrete road with drainage at Car streets, construction of Paver block road at Madavilagam salai and providing high mast light near Arulmigu Swedaranya Swami Temple in Thiruvengadu Panchayat in Sirkali Panchayat Union | |||||
| 2.00Cement concrete road | |||||
| 3.00 | Picking the existing BT surface to 50 - 100 mm deep and clearing away the materials not fit for reuse and including the labour charges for cleaning the surface | 1,145 | Sqm | 20.5 ₹23,472.5 Lowest | 20.5 ₹23,472.5 Lowest |
| 4.00 | Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation. | 666.39 | Cum | 205 ₹1,36,609.95 | 204 ₹1,35,943.56 Lowest |
| 5.00 | Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete. | 61.83 | Cum | 750 ₹46,372.5 | 748 ₹46,248.84 Lowest |
| 6.00 | CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete. | 61.83 | Cum | 5,642 ₹3,48,844.86 | 5,639 ₹3,48,659.37 Lowest |
| 7.00 | CC 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete. | 144.27 | Cum | 6,375 ₹9,19,721.25 | 6,372.5 ₹9,19,360.58 Lowest |
| 8.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 195.8 | Cum | 4,132 ₹8,09,045.6 | 4,120 ₹8,06,696 Lowest |
| 9.00 | Construction of Un- uniforced,dowl jointed at expansion and construction joint only, plain cement pavement,thickness as per desing,over a prepared sub base,with 43 grade cement or aby type as per 150 1.2.2 M30 (Grade) | 1,133.55 | Cum | 6,680.5 ₹75,72,680.78 | 6,677.5 ₹75,69,280.13 Lowest |
| 10.00 | Supply and erecting centring including cost and conveyance and all labour charge etc complete | 1,264.08 | Sqm | 420 ₹5,30,913.6 | 416 ₹5,25,857.28 Lowest |
Tender Value
₹3.3 Cr
EMD Value
₹3.3 L
Closing Date
29 Oct 2021, 3:00 pmClosed
JOINT DIRECTOR, RD AND PR
RD AND PR MAYILADUTHURAI
Mayiladuthurai District Sirkali block Thiruvengadu panchayat construction of cement concrete road near Swadaranya temple
2021_RDTN_211784_1
555/2021/A2 DATE 28.09.2021
Open Tender
Civil Works - Roads
Item Rate
180 days
Mayiladuthurai
see the tender document
10 documents required · 10 mandatory
₹0
₹3.3 L
Yes
RD AND PR MAYILADUTHURAI
1 Nov 2021
13 Oct 2021
29 Oct 2021
13 Oct 2021
29 Oct 2021
13 Oct 2021
13 Oct 2021 - 16 Oct 2021
18 Oct 2021
Amount
Construction of Cement concrete road with drainage at Car streets, construction of Paver block road at Madavilagam salai and providing high mast light near Arulmigu Swedaranya Swami Temple in Thiruvengadu Panchayat in Sirkali Panchayat Union
Cement concrete road
Picking the existing BT surface to 50 - 100 mm deep and clearing away the materials not fit for reuse and including the labour charges for cleaning the surface
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation.
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
CC 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Construction of Un- uniforced,dowl jointed at expansion and construction joint only, plain cement pavement,thickness as per desing,over a prepared sub base,with 43 grade cement or aby type as per 150 1.2.2 M30 (Grade)
Supply and erecting centring including cost and conveyance and all labour charge etc complete
DRAINAGE
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation.
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
CC 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Supply and erecting centring including cost and conveyance and all labour charge etc complete
Supply and fabrication of steel including cost and conveyance and all labour charge etc complete
RCC 1:1.5:3 Mix using 20 mm ISS HBG Metal including cost and conveyance and all labour charge etc complete
Plastring in cm 1:5 mix to 12 mm thick including cost and conveyance and all labour charge etc complete
PAVER BLOCK
Picking the existing BT surface to 50 - 100 mm deep and clearing away the materials not fit for reuse and including the labour charges for cleaning the surface
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation.
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
CC 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Supplying and laying of Interlocking Paver Block Stone 80 mm thk. Over a base layer of sand filling incl. Cost of materials laying and Labour charges etc.,For the road ( 8 cm thick block )
Supply and erecting centring including cost and conveyance and all labour charge etc complete
CULVERT
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete.
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete
RCC 1:1.5:3 mix using 20mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete. For Deck Slab
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete.
Supply and fabrication of steel including cost and conveyance of all materials to site and all labour charges etc., complete.
HIGH MAST LIGHT
Supply, Erection, Testing and commissioning of 16M High mast with 1x6x200W LED lamp Fittings with the following on turn key system.High mast: Supply , Erection and Commissioning of 16 M High Mast system complete hot dip galvanized and suitable for 45 Met /s wind Velocity and above. The High mast structure should have head frame ,winch set ,with steel wire rope of 4/6 MM dia,single drum and provided with galvanized lantern carriage suitable for 1x6 Nos of Luminaries and control panel board system with Automatic Hoisting arrangements and wiring etc; complete as per standard specification , as directed by the departmental officers.
Erection of the High Mast by providing 1:2:4 mix R.C.C foundation pedestal. The RCC pedestal projection should be 30cms above the ground level. The switch feeder box should also be mounted in RCC pedestal with projection of 30cms above the ground level suitable to the safe bearing capacity of the soil at 12T / sq.metre at 2.25m depth of below ground level and necessary galvanized foundation bolts, nuts ,washers and Anchor Plate, template etc; complete as per standard specification , as directed by the departmental officers.
Supply and fixing of 200W ( Flood Light Type) LED High mast Lighting system wattage 200W made of pressure die cast aluminium housing with heat resistant toughened glass cover confirming to IP66. Separate compartment for LEDs & electronic driver with fittingsOperating Volage Range120 -270 ~ Rated Power 200W Current (A) @240V 0.880, Wattage (W) @ 240V - 200W , Power Factor >0.9 Current Harmonics (THD) <10% Operating Conditions Operating Frequency 50Hz Operating Temperature Range -20°C to +50°C Colour Temperature Cool White (5700+_300K) Luminous Flux >22000 Lumens package not less 100 - 110 lm/W Lumens Life Span > 50,000 Hours Approx,waight in (KG) 12.65kg : Body Alluminium Die casting Body Heat Sink Optimized thermal design to ensure maximum life to LED.Test certificate from NABL accredited lab for LM79 report. Protection of IP 65 Standards for Dust and Water including cost of interconnection wire and all labour charges etc; complete as per Standard Specification.as directed by the departmental officer.
Supply and laying of. U.G. cable: Supply and laying of 4core x 16 sqmm PVC armoured (Aluminium) L.T.U.G. cable in a trench to be excavated at a depth of 0.75meter putting 0.15mtr. layer of sand and covering the cable completely with bricks and sand and refilling the earth to make good. as per standard specification.
Supply and clamping of 4core x 16sq.mm PVC armoured (Aluminium) LT UG cable on wall or post with necessary clamping with necessary arrangements etc complete.-
Supply and erection of 1 phase 14 gauge MS sheet steel enclosure EB Service box With 1No of 32A Fuse unit with 1No of 16A Double pole condactor and street light timer arrangement with sutable size of MS Angle frame with necessary interconnection arrangements etc complete,
Supply and providing of cable termination: Supply and providing of cable termination of 4core x 16sqmm PVC LT UG (Aluminium) armoured cable with necessary aluminium socket by crimping with electrical connection etc. complete.
Supply and fixing of Aviation Lamp with Base and coupling arrangements etc; complete
40mm dia G.I pipe Supply and Laying of 40mm dia G.I pipe( Road Crossing) and clamping for EB service connection and cable covering.
Supply and Erection of 4KVA Single phase Street Light Controller: Supply and Erection of 4KVA Single phase Street Light Controller Made up of metal enclosure to be IP 55 and GPRS/GSM based remote streetlight monitoring system with capacity for self-protection from short-circuit, over voltage and anti-theft alert suitable for intergrated with Existing CCMC as directed by departmental officers..
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PALANIVEL
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
TB.pdf
Tender Documents • 1.05 MB
PB.pdf
Tender Documents • 0.62 MB
BOQ_251064.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .