| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.4 CrAdmitted-Finance | -4.50% | ₹13.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹13.5 Cr+₹4.4 L (0.32%)Admitted-Finance | -4.19% | ₹13.5 Cr+₹4.4 L (0.32%) | L2 | Admitted-Finance |
| 3 | L3₹13.9 Cr+₹43.6 L (3.25%)Admitted-Finance | -1.40% | ₹13.9 Cr+₹43.6 L (3.25%) | L3 | Admitted-Finance |
| 4 | L4₹15.5 Cr+₹2.0 Cr (15.1%)Admitted-Finance 04 3 | PRATAPGARH | RAJASTHAN | 312604 | +9.91% | ₹15.5 Cr+₹2.0 Cr (15.1%) | L4 | Admitted-Finance |
| 5 | L5₹16.2 Cr+₹2.7 Cr (20.4%)Admitted-Finance | +14.94% | ₹16.2 Cr+₹2.7 Cr (20.4%) | L5 | Admitted-Finance |
Tender Value
₹14.1 Cr
EMD Value
₹28.1 L
Closing Date
8 Jun 2026, 6:00 pmClosed
EE-A JDA JAIPUR
EE-A JDA JAIPUR
Construction RUB near Railway Bridge No. 215 on Jaipur Delhi Railway Line at Kartarpura Nallah and Widening of existing culvert at Nallah, Jaipur
2026_JDAJP_560715_1
EE-A/07/2026-27
Open Tender
Civil Works
Percentage
270 days
JDA AREA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
ONLINE JDA WEBSITE
₹28.1 L
Yes
MANTHAN HALL JDA JAIPUR
25 Jun 2026
20 May 2026
12 Jun 2026
20 May 2026
8 Jun 2026
20 May 2026
27 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.
In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 1 | Cum | 229.5 | ₹229.27 |
| 1.01 | Add extra for overall depth of excavation above 1.5 m and upto 3.0 m | - | Cum | 16.1 | - |
| 1.02 | Add extra for overall depth of excavation above 3.0 m and upto 4.5 m | - | Cum | 36.7 | - |
| 1.03 | Add extra for overall depth of excavation above 4.5 m and upto 6.0 m over item no 4.10.1.1 | - | Cum | 64.3 | - |
| 1.04 | Add extra for overall depth of excavation above 6.0 m and upto 7.5 m over item no 4.10.1.1 | - | Cum | 98.7 | - |
| 1.05 | Add extra for overall depth of excavation above 7.5 m and upto 9.0 m over item no 4.10.1.1 | - | Cum | 137.5 | - |
| 2 | Providing, fixing, maintaining, shifting & refixing, barricading of minimum 2.0 mtr height at stipulated active site of the same project site, made with angle iron frame of 50x50x5mm and GI sheet of 0.63mm thick including primer painted initially, painting, lettering & border with reflective paint at the time of every shifting, traffic diversion arrangement, safety guard, suitable lightning arrangement during night, complete in all respect till completion of the project as per technical specification and direction of Engineer-In-charge and same shall be possessed by the contractor after completion of the Project.
Payment under this item will be released
(1) 50% At the time of Providing new barricading at the time of
start of project at location and plan as approved by the Engineer & certification
(2) 50% After completion of project including shifting re-erecting and maintaining the barricading in position, during entire construction tenure with requisite manpower /flagman etc. complete for guiding traffic and safety etc and dismantling after completion of project. | - | Mtr | 4,540 | - |
| 3Providing, laying and compacting design mix plain/ reinforced cement concrete of specified grade in foundation/ levelling course/ pile cap using batching plant, transit mixer and concrete pump and vibrator including cost of form work, complete as per drawing and technical specifications as per clause 1100, 1500,1700,2100 of MoRT&H specification including all material, labour, machinery, and maintenance of diversion. | |||||
| 3.01 | PCC Grade M -20 | - | Cum | 5,170 | - |
| 3.02 | RCC Grade M -20 | - | Cum | 5,220 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
07TBRUBKartarpuraNallah.pdf
Tender Documents • 8.20 MB
BOQ_998018.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .