Loading…
Loading…
Tender Value
₹2.6 L
EMD Value
₹5,270
Closing Date
3 Sept 2026, 6:00 pm4d left
xen rew udhampur
xen rew udhampur
BOQ
2026_RDPR_322440_5
2ND TIME e-NIT No. 133 REW UDHAMPUR of 2026-27 Dated 25-08-2026
Open Tender
Civil Works
Percentage
60 days
udhampur
NIT
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹5,270
27 Aug 2026
27 Aug 2026
5 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART 1 Earh Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.70% in All kinds of soil. 30% other soil | 9.58 | cum | 612.95 | ₹5,872.06 |
| 2 | Providing and laying in position 1:5:10 mix of stone aggregates 40mm size. | 0.83 | cum | 4,826.5 | ₹4,006 |
| 3 | R.R stone masonary with hard stone from nallah of approved quality in 1:6 mix | 11.2 | cum | 5,402.9 | ₹60,512.48 |
| 4 | R.R stone masonary with hard stone from nallah of approved quality in 1:6 mix | 2.8 | cum | 4,492.9 | ₹12,580.12 |
| 5 | Providing and Laying in position 40mm thick cement concrete flooring 1:2:4 mix using 20 mm nominal size and curing complete | 3.35 | sqm | 510.25 | ₹1,709.34 |
| 6 | Carriage of construction material sand | 5.47 | sqm | 520.34 | ₹2,846.26 |
| 7 | Carriage of construction material aggregate | 0.87 | sqm | 520.34 | ₹452.7 |
| 8 | Carriage of construction material stone | 10.08 | sqm | 595.88 | ₹6,006.47 |
| 9 | PART 2 Earh Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.100% in All kinds of soil. | 5.1 | cum | 479.3 | ₹2,444.43 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10MIX. | 0.73 | cum | 4,826.5 | ₹3,523.35 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_1080857.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].