Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹16.9 LAccepted-AOC C O SECTOR 02 HOUSING COLONY CHANNI HIMMAT JAMMU J K PIN 180015 | JAMMU | JAMMU AND KASHMIR | 180015 | ₹16.9 L Quoted ₹18.7 L | L-1 | Accepted-AOC DUE TO BEING LOWEST AND REASONABLE |
| 2 | L-2₹23.4 L+₹4.6 L (24.6%)Rejected-Finance | ₹23.4 L+₹4.6 L (24.6%) | L-2 | Rejected-Finance Other than lowest |
| 3 | L-3₹24.8 L+₹6.1 L (32.3%)Rejected-Finance | ₹24.8 L+₹6.1 L (32.3%) | L-3 | Rejected-Finance Other than lowest |
| 4 | L-4₹30.2 L+₹11.5 L (61.2%)Rejected-Finance R O H NO 55 SEC D BHARAT NAGAR TALAB TILLO JAMMU 180002 | JAMMU | JAMMU AND KASHMIR | 180002 | ₹30.2 L+₹11.5 L (61.2%) | L-4 | Rejected-Finance Other than lowest |
| 5 | L-5₹30.4 L+₹11.6 L (62.0%)Rejected-Finance 20 JAIN BAZAR JAMMU 180003 J K | JAMMU | JAMMU | J K | 180003 | ₹30.4 L+₹11.6 L (62.0%) | L-5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | M/S JIWAN SINGH L2 | MAMTA ENTERPRISES L1 | A K JAIN AND SONS L5 | M/S Chib Engineers L4 | M/s Chopra Constructions L3 | M/s Shivam Construction Co L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches, not exceeding 1.50 m wide and not exceeding 1.50m in depth; not exceeding 10 Sqm on plan and getting out, in any type of soil, for laying electric cables or foundation of poles/ stays etc, complete all as specified and as directed . | 1,256 | Cum | 90 ₹1,13,040 | 120 ₹1,50,720 | 250 ₹3,14,000 | 150 ₹1,88,400 | 80 ₹1,00,480 Lowest | 120 ₹1,50,720 |
| 2.00 | Excavation in trenches, exceeding 1.50m but not exceeding 3.0m in depth, not exceeding 10 Sqm on plan and getting out, in any type of soil, for laying electric cables or foundation of poles/ stays etc, complete all as specified and as directed . | 0.7 | Cum | 95 ₹66.5 Lowest | 800 ₹560 | 300 ₹210 | 150 ₹105 | 100 ₹70 | 140 ₹98 |
| 3.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25Cm, complete all as specified and directed. | 757 | Cum | 20 ₹15,140 | 10 ₹7,570 Lowest | 80 ₹60,560 | 20 ₹15,140 | 10 ₹7,570 Lowest | 25 ₹18,925 |
| 4.00 | Removing excavated materials/ soils, not exceeding 50m and depositing where directed at a level not exceeding 1.50m, complete all as specified and directed . | 499 | Cum | 20 ₹9,980 | 10 ₹4,990 Lowest | 80 ₹39,920 | 20 ₹9,980 | 10 ₹4,990 Lowest | 25 ₹12,475 |
| 5.00 | Sand cushioning to protection of underground cables, laid 8 Cm before laying and 15 Cm after laying of cable, and punned to form an overall layer of 18 Cm thick, complete all as specified and directed .
Note: Punned thickness shall be measured. | 309 | Cum | 300 ₹92,700 Lowest | 350 ₹1,08,150 | 600 ₹1,85,400 | 300 ₹92,700 Lowest | 300 ₹92,700 Lowest | 450 ₹1,39,050 |
| 6.00 | Sub class ‘B’ bricks, modular size, brick covering laid dry, flat, transversally along the length of cable on sand cushioning for mechanical protection of cable, with width equal to the length of the brick, complete all as specified and directed . | 32.73 | 1000 Nos | 5,000 ₹1,63,650 | 5,000 ₹1,63,650 | 5,000 ₹1,63,650 | 3,000 ₹98,190 Lowest | 5,000 ₹1,63,650 | 6,500 ₹2,12,745 |
| 7.00 | Plain cement concrete M-7.50 (1:4:8), type D-2 (using 40mm graded crushed stone aggregate), as in or as mass concrete in foundation of poles etc, complete all as specified and as directed. | 3.4 | Cum | 1,500 ₹5,100 | 2,200 ₹7,480 | 3,500 ₹11,900 | 1,400 ₹4,760 | 1,200 ₹4,080 Lowest | 2,500 ₹8,500 |
| 8.00 | Plain cement concrete M-10 (1:3:6), type C-2 (using 40mm graded crushed stone aggregate), as in or as mass concrete in foundation of stays etc, complete all as specified and as directed. | 0.54 | Cum | 1,500 ₹810 | 2,500 ₹1,350 | 4,500 ₹2,430 | 1,400 ₹756 Lowest | 1,800 ₹972 | 3,000 ₹1,620 |
| 9.00 | Plain cement concrete M-15 (1:2:4), type B-1 (using 20mm graded crushed stone aggregate), as in coping of poles including necessary form work, finish even and smooth without using extra cement, complete all as specified and as directed . | 2.72 | Cum | 1,700 ₹4,624 | 3,000 ₹8,160 | 5,500 ₹14,960 | 1,400 ₹3,808 Lowest | 1,800 ₹4,896 | 4,200 ₹11,424 |
| 10.00 | Taking out existing unserviceable AB cable of any size and length at any position,complete all as specified and directed. | 140 | RM | 20 ₹2,800 | 1 ₹140 Lowest | 10 ₹1,400 | 2 ₹280 | 2 ₹280 | 10 ₹1,400 |
Tender Value
₹35.4 L
EMD Value
₹71,000
Closing Date
30 Aug 2025, 6:00 pmClosed
GE, GE (SOUTH) AKHNOOR
GE (South) Akhnoor PIN- 900234 c/o 56 APO
SPL REPAIR TO UG CABLE AND REPLACEMENT OF OH ACSR CONDUCTOR TO UG CABLE AT RAKHMUTHI AND PALLANWALA MIL STN UNDER GE (SOUTH) AKHNOOR
2025_MES_724174_1
GES/AKH-37/2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
240 days
PALLANWALA
AS PER NIT
9 documents required · 9 mandatory
₹500
GE SOUTH AKHNOOR
₹71,000
Yes
29 Oct 2025
2 Aug 2025
6 Sept 2025
2 Aug 2025
30 Aug 2025
16 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .