| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC LOA |
| 2 | L2₹1.1 Cr+₹3.2 L (2.92%)Rejected-Finance NOAPARA GANGANAGAR KOLKATA 700132 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700132 | ₹1.1 Cr+₹3.2 L (2.92%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹1.2 Cr+₹7.9 L (7.31%)Rejected-Finance | ₹1.2 Cr+₹7.9 L (7.31%) | L3 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
20 Feb 2021, 2:00 pmClosed
Superintending Engineer, Presidency Circle PWD
Office of the Superintending Engineer, Presidency Circle PWD 1 K S Roy Road Block C 1st Floor Kolkata 700001
Facia of AC Plant and Lift Shaft at central Courtyard of Main Building of Honble High Court Calcutta during the year 2020_2021
2021_PWD_316912_1
WBPWD/SEPC/NIeT-14/2020-2021
Open Tender
CIVIL WORKS
Item Rate
60 days
Kolkata
Please refer Tender documents.
4 documents required · 4 mandatory
₹2 L
Yes
Superintending Engineer, Presidency Circle PWD
9 Feb 2022
18 Jan 2021
22 Feb 2021
19 Jan 2021
20 Feb 2021
29 Jan 2021
28 Jan 2021
Amount
Supply, fitting , fixing Cornice made with Fibre Glass as per design which will be finally made in cycles of various process like pattern making with Wood/clay/paris, mould making with fiber Glasss of general purpose polyester resin, Accelerator (Cobalt octoate 2%), Catalyst , French Chalk, thiner, Wood & Pigment after proper finish / spraying releasing agent all over the surface and final casting will be taken out for installation and finishing for fixing at site over frame structure made with 50 X 25 X 1.5 thk. extruded Aluminum hollow section fitted and fixid edge to edge in regular interval horizontaly as well as verticaly with angle providing extra supporting member as required tied / fasten to ceiling / wall or ISMB using screw / fastener /MS clamp etc. and finaly complete finish as per direction of Engineering In Charge. (excluding the cost of Aluminiu str. but including the cost of scaffolding) i ) Cornice (75/125 X 200 mm aprox.) above column in 1st floor
ii) Intermediate Cornice (175 X 175 mm aprox.) along the 1st floor level
iii) Intermediate Cornice (150/100 X 375 mm aprox.) above column in gr floor
Supply, fitting , fixing Panel made with Fibre Glass as per design which will be finally made in cycles of various process like pattern making with Wood/clay/paris, mould making with fiber Glasss of general purpose polyester resin, Accelerator (Cobalt octoate 2%), Catalyst , French Chalk, thiner, Wood & Pigment after proper finish / spraying releasing agent all over the surface and final casting will be taken out for installation and finishing for fixing at site over frame structure made with 50 X 25 X 1.5 thk. extruded Aluminum hollow section fitted and fixid edge to edge in regular interval horizontaly as well as verticaly with angle providing extra supporting member as required tied / fasten to ceiling / wall or ISMB using screw / fastener /MS clamp etc. and finaly complete finish as per direction of Engineering In Charge.(excluding the cost of Aluminiu str. but including the cost of scaffolding) i) Flat Panel claded over column - one side in 1st floor.
Flat Panel claded over column - one side in Ground floor.
Supply, fitting , fixing Arch with side panel for each window in 1st Floor made with Fibre Glass as per design which will be finally made in cycles of various process like pattern making with Wood/clay/paris, mould making with fiber Glasss of general purpose polyester resin, Accelerator (Cobalt octoate 2%), Catalyst , French Chalk, thiner, Wood & Pigment after proper finish / spraying releasing agent all over the surface and final casting will be taken out for installation and finishing for fixing at site over frame structure made with 50 X 25 X 1.5 thk. extruded Aluminum hollow section fitted and fixid edge to edge in regular interval horizontaly as well as verticaly with angle providing extra supporting member as required tied / fasten to ceiling / wall or ISMB using screw / fastener /MS clamp etc. and finaly complete finish as per direction of Engineering In Charge. (excluding the cost of Aluminiu str. but including the cost of scaffolding)
Supply, fitting , fixing Raised design panel below parapet wall (660mm X 875mm X 50 mm ) made with Fibre Glass as per design which will be finally made in cycles of various process like pattern making with Wood/clay/paris, mould making with fiber Glasss of general purpose polyester resin, Accelerator (Cobalt octoate 2%), Catalyst , French Chalk, thiner, Wood & Pigment after proper finish / spraying releasing agent all over the surface and final casting will be taken out for installation and finishing for fixing at site over frame structure made with 50 X 25 X 1.5 thk. extruded Aluminum hollow section fitted and fixid edge to edge in regular interval horizontaly as well as verticaly with angle providing extra supporting member as required tied / fasten to ceiling / wall or ISMB using screw / fastener /MS clamp etc. and finaly complete finish as per direction of Engineering In Charge.
Supply, fitting , fixing Raised design panel (jali design) along parapet wall (double side only) made with Fibre Glass as per design which will be finally made in cycles of various process like pattern making with Wood/clay/paris, mould making with fiber Glasss of general purpose polyester resin, Accelerator (Cobalt octoate 2%), Catalyst , French Chalk, thiner, Wood & Pigment after proper finish / spraying releasing agent all over the surface and final casting will be taken out for installation and finishing for fixing at site over frame structure made with 50 X 25 X 1.5 thk. extruded Aluminum hollow section fitted and fixid edge to edge in regular interval horizontaly as well as verticaly with angle providing extra supporting member as required tied / fasten to ceiling / wall or ISMB using screw / fastener /MS clamp etc. and finaly complete finish as per direction of Engineering In Charge. (excluding the cost of Aluminiu str. but including the cost of scaffolding) a) Double side only
b) Single side only
Supply, fitting , fixing Raised design Railing - Cornice (250 X 125 mm aprox.) along the top of the parapet made with Fibre Glass as per design which will be finally made in cycles of various process like pattern making with Wood/clay/paris, mould making with fiber Glasss of general purpose polyester resin, Accelerator (Cobalt octoate 2%), Catalyst , French Chalk, thiner, Wood & Pigment after proper finish / spraying releasing agent all over the surface and final casting will be taken out for installation and finishing for fixing at site over frame structure made with 50 X 25 X 1.5 thk. extruded Aluminum hollow section fitted and fixid edge to edge in regular interval horizontaly as well as verticaly with angle providing extra supporting member as required tied / fasten to ceiling / wall or ISMB using screw / fastener /MS clamp etc. and finaly complete finish as per direction of Engineering In Charge. (excluding the cost of Aluminiu str. but including the cost of scaffolding)
Supply, fitting , fixing Arch Panel for Ground Floor made with Fibre Glass as per design which will be finally made in cycles of various process like pattern making with Wood/clay/paris, mould making with fiber Glasss of general purpose polyester resin, Accelerator (Cobalt octoate 2%), Catalyst , French Chalk, thiner, Wood & Pigment after proper finish / spraying releasing agent all over the surface and final casting will be taken out for installation and finishing for fixing at site over frame structure made with 50 X 25 X 1.5 thk. extruded Aluminum hollow section fitted and fixid edge to edge in regular interval horizontaly as well as verticaly with angle providing extra supporting member as required tied / fasten to ceiling / wall or ISMB using screw / fastener /MS clamp etc. and finaly complete finish as per direction of Engineering In Charge. (excluding the cost of Aluminiu str. but including the cost of scaffolding)
Brick effect - made with FRP sheet on wall surface
Louvers inside of arch area in Gr Floor
Supply and fixing cementitious (12 mm thk.) board fixing over Al frame str. - made with 50 X 25 X 2 mm Aluminium tube fitted and placed in vertical and horizontal direction in a grid of 600 mm C-C in both direction supported by MS angle in required interval as per direction of Engineering In Charge.
CAPITAL ENTERPRISE
S.BOSE AND CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .