Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.0 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹38.9 L+₹1.9 L (5.13%)Rejected-Finance BIDHAN PALLY OODLABARI P O MANABARI P S MALBAZAR DIST JALPAIGURI | JALPAIGURI | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹40.5 L+₹3.4 L (9.25%)Rejected-Finance AMBARI BORDER KAMALA BAGAN DARJEELING 734426 | SILIGURI | DARJEELING | WEST BENGAL | 734426 | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹41.3 L+₹4.3 L (11.5%)Rejected-Finance | L4 | Rejected-Finance Not Lowest | |
| 5 | L5₹41.6 L+₹4.6 L (12.5%)Rejected-Finance | L5 | Rejected-Finance Not Lowest |
Tender Value
₹39.6 L
EMD Value
₹79,200
Closing Date
7 Oct 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE SEVOKE ROAD
GE Sevoke Road Post Salugara Dist Jalpaiguri PIN 734008
PROVN OF SINGLE LIVING ACCN FOR ORS WITH ATTACH BATH AT UPPER SOONGACHI
2024_MES_669693_1
8350/SEV OF 2024-25
Open Tender
Civil Works
Lump-sum
270 days
GE SEVOKE ROAD
AS PER TENDER DOCUS
7 documents required · 7 mandatory
₹0
₹79,200
29 Nov 2024
2 Sept 2024
10 Oct 2024
2 Sept 2024
7 Oct 2024
1 Oct 2024
3 Sept 2024 - 14 Sept 2024
Amount
BUILDINGS & STRUCTURE (Sch 'A' PART-I)
Lump sum price worked out by the Contractor for “BUILDINGS & STRUCTURE” as listed in Schedule ‘A’ Part-I. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 32,72,000.00 inserted by the MES in Schedule ‘A’ Part-I.
EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT (Sch 'A' PART-II)
Lump sum price worked out by the Contractor for “EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT” as listed in Schedule ‘A’ Part-II. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 54,929.90 inserted by the MES in Schedule ‘A’ Part-II.
INTERNAL WATER SUPPLY (Sch 'A' PART-III)
Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-III. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 27,130.52 inserted by the MES in Schedule ‘A’ Part-III.
INTERNAL ELECTRIFICATION (Sch 'A' PART-IV)
Lump sum price worked out by the Contractor for “(INTERNAL ELECTRIFICATION)” as listed in Schedule ‘A’ Part-IV. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 1,31,382.93 inserted by the MES in Schedule ‘A’ Part-IV.
ROAD, PATH & HARDSTANDING (Sch 'A' PART-V)
Lump sum price worked out by the Contractor for “(ROAD, PATH & HARDSTANDING)” as listed in Schedule ‘A’ Part-V. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 1,96,181.57 inserted by the MES in Schedule ‘A’ Part-V.
SEWAGE DISPOSAL (Sch 'A' PART-VI)
Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part-VI. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 1,63,673.58 inserted by the MES in Schedule ‘A’ Part-VI.
AREA DRAINAGE (Sch 'A' Part-VII)
Lump sum price worked out by the Contractor for “(AREA DRAINAGE)” as listed in Schedule ‘A’ Part-VII. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 1,52,518.16 inserted by the MES in Schedule ‘A’ Part-VII.
EXTERNAL WATER SUPPLY (Sch 'A' PART-VIII)
Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-VIII. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 17,029.82 inserted by the MES in Schedule ‘A’ Part-VIII.
EXTERNAL ELECTRIFICATION (Sch 'A' PART-IX)
Lump sum price worked out by the Contractor for “(EXTERNAL ELECTRIFICATION)” as listed in Schedule ‘A’ Part-IX. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 17,768.00 inserted by the MES in Schedule ‘A’ Part-IX.
MISCELLANEOUS ITEMS REQUIRED FOR B/R & E/M SERVICES (Sch 'A' Part-X)
INTERNAL WATER SUPPLY S & F 15mm bore dia two way bib taps cast copper alloy chromium plated, fancy type with crutch or butter fly handle, screwed down, screwed for iron pipe or for brass ferrule & fixed complete all as specified and as directed.
S&F stainless steel premium 6 pin / hook cloth hanger for bathroom complete all as specified and directed.
EXTERNAL WATER SUPPLY Materials and labour for cutting and screwing existing 80 mm dia steel tubing for alterations or additions (or lengthening screw on pipe to form connector) as specified and directed.
EXTERNAL ELECTRIFICATION Supply & laying 50 mm outside dia double wall corrugated pipe(DWCPE) (SN8) for enclosing cable below ground/road surface to a required depth including suitable size couplers for jointing of pipe all as per site requirement etc complete all as specified and directed.
Materials and labour for boring holes 1mtr deep in soil under roads/PCC as directed for cable passing through pipes of required size and disposal of soil to a distance not exc. 50m.
RAJIV DEY SARKER (BID ID -3129326)
ANJALI CONSTRUCTION (BID ID -3129420)
RAJU AICH (BID ID -3130415)
SHRI JAYANTA GHOSH (BID ID -3130049)
M/S S.B. CONSTRUCTION (BID ID -3130063)
M/S L N CHOWDHURY (BID ID -3130957)
TAPASH SAHA (BID ID -3130202)
ASHOK MUKHERJEE (BID ID -3130561)
LIBERAL ENGINEER CONSTRUCTION (BID ID -3131081)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .