Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance NO 12 14 3RD STREET ANNAI SATHYA NAGAR CHENNAI 600 118 | CHENNAI | CHENNAI | TAMIL NADU | 600118 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | Rejected-Technical Technically Rejected |
Tender Value
Refer Docs
EMD Value
₹22,600
Closing Date
29 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist
O/o The Superintending Archaeologist Archaeological Survey of India Chennai Circle
MW(C) TO KONAR TEMPLE THIRUMALPUR TAMILNADU - 2022-2023
2022_ASI_707507_1
T-15/14/Jan/22/10216408/CON
Open Tender
Civil Works - Buildings
Works
60 days
As Per Tender Documents
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22,600
Yes
21 Sept 2022
19 Aug 2022
30 Aug 2022
19 Aug 2022
29 Aug 2022
19 Aug 2022
Amount
Removing the existing damaged barbed wire fencing with RCC post including breaking foundation concrete, stacking the useful materials and disposing of unserviceable materials to outside of the monument not less than 50m etc., and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials.
Earth work excavation for foundation including dressing of sides and ramming of bottoms, lift up to 1.50 mtrs, including getting out the excavated soil and disposal of surplus excavation soil with lead not less than 50m etc., and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials.
Providing and laying in position of plain cement concrete of specified grade 1:3:6 including the cost of centering and shuttering, all work up to plinth level, by using 40mm and below size granite metal including cost, conveyance of all materials, labour charges for loading, unloading, mixing, laying, spreading, ramming, tamping, curing etc. complete and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials.
Providing and constructing random rubble stone masonry (first sort) with hard stone in foundation and plinth with cement mortar 1:4 including cost, conveyance of all materials, all labour charges, curing etc and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials.
Providing and constructing CR masonry in course stone masonry with hard stone the depth of courses varies from size 20 cm to 30 cm and face stones hammer dressed with cement mortar 1:3 mix, including cost, conveyance of all materials, all labour charges, curing etc and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials.
Pointing to the CR Masonry in course stone masonry dwarf wall with cement mortar 1:5 including cost, conveyance of all materials, all labour charges, colouring, curing with stone pointing etc. and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials.
Making and supplying M.S. Grill by using 50x50x6mm M.S. 'L' Angle as vertical post with 50x6mm M.S. Flat in horizontal @ equal intervals and 12mm M. S. square bar at 10 cm center to center fixing the grill in position set in cement concrete 1:2:4 mix, curing, painting etc. complete. and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials.
Painting with two coats of synthetic enamel paint over a primer coat etc. complete. and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials.
Removing the existing stone flooring in front of the temple area for relaying the stone flooring including cost of materials and labour charges etc., complete. and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials.
Providing and laying 10cm thick neatly dressed hard granite apron stone slabs of 90 cm and above length to width of 60 cm and above in front of temple area using 70 % of new stones with laid over the concrete bed of 1:3:6 mix of 10cm thick using 40 mm and below size metal including earthwork excavation for base concrete, disposal of earth to far off place outside the city, sand filling to a thick of 5 cm, pointing the stone joints in lime surki mortar 1:1:1 mix, mixed with colouring materials curing including cost of all materials and labour charges etc., complete. and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials.
Removal of accumulated earth/ debris including mixed with stones for clearing the area to a far off place etc including cost of labour charges etc complete. and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials.
Clearing the heavy vegetation growth, bushes, uprooting and sapling etc in and around the temple area including labour charges etc complete. and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials. (Note: The proposed work should be completed by using man power only, at any circumstances machinery will not be entertained in the archaeological site.)
Painting two coats to the old MS grill fencing to the temple complex area after thoroughly scrapping including cost of materials and labour charges etc., complete. and the charges are also including applicable taxes, GST if any etc. complete all as per the directions of the department officials.
Rajendran Contractor
KM INFRA
SRI SINDHU CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .