Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.9 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹37.7 Cr+₹76.5 L (2.07%)Admitted-Finance 101 VINAYAK APARTMENT KAITH WALI GAALI NAI SADAK GWALIOR GWALIOR MADHYA PRADESH 474001 | GWALIOR | MADHYA PRADESH | 474001 | L2 | Admitted-Finance | ||
| 3 | L3₹38.2 Cr+₹1.3 Cr (3.62%)Admitted-Finance NO 14 1ST AVENUE ASHOK NAGAR CHENNAI 83 MOB 9941102299 | L3 | Admitted-Finance | ||
| 4 | L4₹60.3 Cr+₹23.4 Cr (63.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Rejected-Technical 121 THIRUMURUGAN NAGAR VEERIYAMPALAYAM ROAD KALAPATTY POST COIMBATORE 641048 | COIMBATORE | TAMIL NADU | 641048 | - | Rejected-Technical As per Tender condition |
Tender Value
₹51.3 Cr
EMD Value
₹1.0 Cr
Closing Date
9 Dec 2024, 3:00 pmClosed
The Chief Engineer
o/o The Chief Engineer, 5th floor, Centenary Building, 1, Rajaji Salai, Chennai 600 001
DEVELOPMENT OF PAVED STORAGE YARDS AT MARSHALLING YARD AND JD (EAST) BACKUP AREA FOR HANDLING EXIM CARGO AT CHENNAI PORT
2024_ChPT_834006_1
T/JDC/61/2024/E
Open Tender
Civil Works
Works
450 days
Chennai Port Authority
As per Tender document
7 documents required · 7 mandatory
₹0
₹1.0 Cr
Yes
/o The Chief Engineer, 5th floor, ChPA
24 Jan 2025
7 Nov 2024
10 Dec 2024
7 Nov 2024
9 Dec 2024
2 Dec 2024
18 Nov 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 11. CONSTRUCTION OF PAVED STORAGE YARD (Civil Works). | |||||
| 1.01 | 1.01 Cutting and removing trees of girth upto 600mm (approx.) with branches using cutting machine without damaging the near by structures and cutting into pieces all as directed including removing the roots below GL, stacking the serviceable materials upto a lead of 50m and removing unserviceable material as directed including all materials, labour, tools, equipment, transport, fuel etc., complete. | 15 | 1 No. (One Number) | 513.6 | ₹7,704 |
| 1.02 | 1.02 Loading and transporting the avalilabe earth unserviceable materials from the work spot and taking away from the Port premises, (No Surplus earth / unusable materials shall be dumped inside the Port premises) as directed including all labour, tools, equipment, transport and fuel etc., complete.
Note:
1. The tenderer shall maintain trip sheets in triplicate in Port’s approved format at his own cost for the quantity of surplus earth transported.
2. Payment will be based on lorry cubical content after deduction of 20% for voids. However, for final payment, the quantity will be restricted to Pre level & Post level difference. | - | - | - | - |
| 1.03 | a) Available Earth | 700 | M3 (Cubic metre) | 315.2 | ₹2,20,640 |
| 1.04 | b) Available Debris | 3,250 | M3 (Cubic metre) | 252.15 | ₹8,19,487.5 |
| 1.05 | 1.03 Dismantling the existing damaged Plain Cement Concrete works at marshalling yard area, JD east and wherever required in Rich mix as existing at site of work and wherever required without damaging the nearby structures to the required level and handing over the retrieved materials such as reinforcement/ Structural steel etc., if any to the Port’s Store anywhere inside the harbour Premises including stacking the debris within a lead of 50m for re-transportation and disposal all as directed including all labour, tools, equipments, fuel, transport, etc. complete. | 1,830 | M3 (Cubic metre) | 2,348.55 | ₹42,97,846.5 |
| 1.06 | 1.04 Dismantling the existing Plain Cement Concrete works at marshalling yard area, JD east and wherever required in Lean mix as existing at site of work and wherever required without damaging the nearby structures to the required level including stacking the debris within a lead of 50m for re-transportation and disposal all as directed including all labour, tools, equipments, fuel, transport, etc. complete. | 5,660 | M3 (Cubic metre) | 1,450.65 | ₹82,10,679 |
| 1.07 | 1.05 Removing and stacking the Sand available at demolished warehouse area with in a lead of 1 Km all as directed including all labour, tools, equipments, fuel, transport, etc. complete. | 3,750 | M3 (Cubic metre) | 46.25 | ₹1,73,437.5 |
| 1.08 | 1.06 Dismantling the existing water bound macadam (WBM) with Soling layer of varying thickness as existing at site of work and wherever necessary to the required size, shape and level all as directed at site all as per relevant specifications and stacking the debris within a lead of 50m for re-transportation and disposal including all labour, tools, equipments, plant, fuel, etc., complete. | 50 | M3 (Cubic metre) | 839.2 | ₹41,960 |
| 1.09 | 1.07 Cutting the existing Asphalt /Bitumen layers above/below ground level including stacking within a lead of 50 m for re-transportation and disposal including all labour, tools, equipments, plant, fuel, etc., complete. | 50 | M3 (Cubic metre) | 1,378 | ₹68,900 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.15 MB
TD.pdf
Tender Documents • 7.19 MB
BOQ_876445.xls
BOQ • 0.35 MB
BOQ.xls
BOQ • 0.33 MB
Tenderdocument.pdf
Tender Documents • 7.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .