| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.6 LAccepted-AOC | ₹48.6 L Quoted ₹57.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹59.4 LRejected-Finance | ₹59.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹62.7 LRejected-Finance | ₹62.7 L | L3 | Rejected-Finance L3 |
| 4 | L4₹65.5 LRejected-Finance NO 6 I 24 AYYAKKARAN THOTTAM VAIGAI VADAKARAI MADURAI 625 002 | MADURAI | MADURAI | TAMIL NADU | 625002 | ₹65.5 L | L4 | Rejected-Finance L4 |
| 5 | L5₹66.4 LRejected-Finance NO 15B 17C PANAGAL 2ND ST MATHICHIYAM MADURAI 20 | MADURAI | MADURAI | TAMIL NADU | 20 | ₹66.4 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | A KALIPPAN L1 | SHAKTHI CONSTRUCTION L2 | J.S.NAGARAJAN L3 | petchimuthu L4 | S CHELLADURAI CONTRACTOR L6 | S KUMARA PANDIAN L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m | 124.5 | M3 | 90 ₹11,205 | 110 ₹13,695 | 100 ₹12,450 | 140 ₹17,430 | 120 ₹14,940 | 150 ₹18,675 |
| 2.00 | Earth work excavation in soft disintegrated rock not requiring blasting with initial lead of 10 m and lift of 2 m | 124.5 | M3 | 90 ₹11,205 | 120 ₹14,940 | 130 ₹16,185 | 1 ₹124.50 | 200 ₹24,900 | 180 ₹22,410 |
| 3.00 | Collection,Supplying and spreading of M.sand with well watering and consolidation as per standard specification including cost of all materials lead lift etc complete | 35 | M3 | 10 ₹350 | 1,500 ₹52,500 | 1,300 ₹45,500 | 1,000 ₹35,000 | 1,800 ₹63,000 | 1,000 ₹35,000 |
| 4.00 | PCC 1:3:6 using 40mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing etc., complete. | 43 | M3 | 5,000 ₹2.1 L | 5,000 ₹2.1 L | 5,300 ₹2.3 L | 5,500 ₹2.4 L | 6,000 ₹2.6 L | 4,900 ₹2.1 L |
| 5.00 | PCC 1 : 2 : 4 mix using 12-20mm HBS metal without formwork including cost of all materials, lead, lift, etc, complete | 14 | M3 | 5,500 ₹77,000 | 7,500 ₹1.1 L | 6,800 ₹95,200 | 8,600 ₹1.2 L | 8,100 ₹1.1 L | 6,900 ₹96,600 |
| 6.00 | Brickwork in CM 1:5 using chamber Bricks including cost of all material, labour lead lift curing etc complete. | 209 | M3 | 8,000 ₹16.7 L | 6,300 ₹13.2 L | 6,350 ₹13.3 L | 8,400 ₹17.6 L | 6,000 ₹12.5 L | 7,900 ₹16.5 L |
| 7.00 | RCC 1:1.5:3 using 20mm (machine crushed) metal including cost of all materials, lead, lift, labour with formwork etc., complete. | 10 | M3 | 8,000 ₹80,000 | 9,000 ₹90,000 | 10,500 ₹1.1 L | 13,000 ₹1.3 L | 13,000 ₹1.3 L | 8,900 ₹89,000 |
| 8.00 | RCC 1:1.5:3 using 20mm (machine crushed) metal with formwork for precast cover slab including cost of all labour, materials, lead, lift etc., complete. | 8 | M3 | 10,000 ₹80,000 | 12,000 ₹96,000 | 15,000 ₹1.2 L | 16,000 ₹1.3 L | 12,000 ₹96,000 | 15,000 ₹1.2 L |
| 9.00 | RCC 1:1.5:3 using 20mm (machine crushed) metal without formwork for road including cost of all labour, materials, lead, lift etc., complete. | 52 | M3 | 8,000 ₹4.2 L | 8,500 ₹4.4 L | 7,800 ₹4.1 L | 9,000 ₹4.7 L | 9,000 ₹4.7 L | 6,900 ₹3.6 L |
| 10.00 | Supplying and fabricating and placing in position of MS/RTS steelk reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc complete | 6,640 | Kg | 60 ₹4.0 L | 85 ₹5.6 L | 65 ₹4.3 L | 52 ₹3.5 L | 90 ₹6.0 L | 70 ₹4.6 L |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
29 Dec 2025, 2:00 pmClosed
CE/TP SO/Madurai
CE/TP SO/Madurai
Civil work for Madagupatty 110/22 KV SS
2025_EB_634787_1
CE/TP SO/MDU Specn.No.003/2025-26
Open Tender
Civil Works
60 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹70,000
18 May 2026
20 Dec 2025
30 Dec 2025
20 Dec 2025
29 Dec 2025
20 Dec 2025
Amount
Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m
Earth work excavation in soft disintegrated rock not requiring blasting with initial lead of 10 m and lift of 2 m
Collection,Supplying and spreading of M.sand with well watering and consolidation as per standard specification including cost of all materials lead lift etc complete
PCC 1:3:6 using 40mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing etc., complete.
PCC 1 : 2 : 4 mix using 12-20mm HBS metal without formwork including cost of all materials, lead, lift, etc, complete
Brickwork in CM 1:5 using chamber Bricks including cost of all material, labour lead lift curing etc complete.
RCC 1:1.5:3 using 20mm (machine crushed) metal including cost of all materials, lead, lift, labour with formwork etc., complete.
RCC 1:1.5:3 using 20mm (machine crushed) metal with formwork for precast cover slab including cost of all labour, materials, lead, lift etc., complete.
RCC 1:1.5:3 using 20mm (machine crushed) metal without formwork for road including cost of all labour, materials, lead, lift etc., complete.
Supplying and fabricating and placing in position of MS/RTS steelk reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc complete
Fabrication, supplying and fixing of structural steel members for cable duct angle, Channel, chequred plate including labour material etc complete.
Plastering with CM 1:5 mix 12 mm thick for inside and ouitside walls including all cost labour materials lead lift etc complete
Supplying and filling with red gravel in the SS yard and stacking them to department gauge, labour for filling and compaction including cost of all materials, lead, lift etc., complete.
Supplying and filling with quarry dust in the SS yard and stacking them to department gauge, labour for filling and compaction including cost of all materials, lead, lift etc., complete.
Supplying and filling with 20mm metal including cost of all materials, lead, lift, labour etc., complete.
Providing WMM for wet mix 40mm metal with Quary dust and River sand for road base including cost of all materials lead, lifts water consolidation with power roller etc complete
Providing expansion joint for road concrete as per specification in both direction using prevalid aspheltics pad 20mm thick to full width and depth of 150mm thick plastering with CM 1:3, 12mm thick includng cost of cement, all materials, labour, curing, all lead, lift etc., complete. as per standard specification.
Colour washing two coats with cement paint approved colour over primary coats for out side wall including cost of all materials, lead, lift, labour etc., complete.
Supply and erection of 1 1/4" (32mm) outer dia 25 mm inner dia PVC 3.62 Sq.mm tk. Pipe line for tank of control room including cost of pipe confirming for IS 4958/1698 and 4984/1978 including bend labour for cutting threading fixung and tightening necessary excavation etc., complete.
Supplying and fixing inposition of 25mm dia PVC pipe of 3.65 sq.mm thick from the approval manufacturing appolo, chemplast, avanplast, valamarthi, usha, vimal etc., confirming to IS 4985 of 1968, 4984 of 1970 including cost of all special fixtures lead, lift etc., complete.
Supply and fixing in position of 32mm dia Gun metal gate valve including cost of materials, labour, lead, lift etc., complete.
Supply and fixing in position of 25mm dia Gun metal gate valve including cost of materials, labour, lead, lift etc., complete.
Supplying and fixing earth trough of 60cms dia 40mm thick and 60cm height with top cover including cost of all materials, lead, lift, labour etc., complete.
Disposal the excess excavated earth and refilling in low lying area including cost of all materials lead lift etc complete.
Supply and fabrication of placing in position of 90 lbs rail for transformer plinth including cost of all material ,lead, lift, labour, etc., complete
Dismantling of existing concrete structures with deploying machineries including cost of removed the debris from site and all material ,lead, lift, labour, etc., complete
Dismantling of existing brickwork structures including cost of removed the debris from site and all material ,lead, lift, labour, etc., complete
Manufactuing and supplying of steel frame door with MDF duratuff board
Painting all exposed faces of door, windows and fencing post two coats an approved enamel paint over one coat of primary coat including cost of all materials, lead, lift, labour etc complete
Wiring with 2x1.50 sq.mm PVC unsheathed cu multistand cable of 1100 v grade in suitable pvc rigid pipe in wall or ceiling with pvc accessories with TW switch box in flush with wall covered with hylum sheet of 3mm thick with painting of suitable colour with contineous earthwire connection of 14 swg tc wire for light points
Wiring with 2x1.50 sq.mm Pvc unsheathed cu multistand cable in suitable pvc rigid pipe in wall or ceiling with pvc accessories 5amps 3&2 pin flush type non interlocking c.s. plug including pin top with painting of suitable colour with contineous earthwire connection of 14 swg t.c. wire for plug point.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
SHAKTHI CONSTRUCTION (BID ID -1546625)
J.S.NAGARAJAN (BID ID -1547115)
petchimuthu (BID ID -1547389)
S KUMARA PANDIAN (BID ID -1548579)
S CHELLADURAI CONTRACTOR (BID ID -1546544)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_759627.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid