Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 L+₹161.97 (0.06%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹8,835
Closing Date
22 Sept 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
C/O BOUNDARY WALL FOR MS HANJAN 01
2026_RDPR_324815_12
e- NIT No. 80 OF REWK/PRI/2026-27 Dated 16-09-2026
Open Tender
Civil Works
Percentage
45 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EX ENGINEER REW KULGAM
₹8,835
29 Sept 2026
16 Sept 2026
24 Sept 2026
16 Sept 2026
22 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 4.06 | cum | 479 | ₹1,943.59 |
| 2 | P/L of dry Stone soling dully hand packed hand rammed incl stone chippings, all carriages complete with lead of 5 km | 4.6 | cum | 1,154 | ₹5,306.78 |
| 3 | P/L cement concrete of 1:3:6 mix mortar using Crushed stone aags. Of 20mm N/S including curing excluding centering and shuttring complete | 12.98 | CUM | 5,733 | ₹74,440.14 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 fine sand) | 18.95 | cum | 7,163.6 | ₹1,35,743.06 |
| 5 | Form work for centering and shuttering including propping etc & removal of same | 42.6 | SQM | 286 | ₹12,183.6 |
| 6 | Carriage of sand & bajri for the avg. lead of 21 km by MT.with headload of 250m | 17.66 | CUM | 785 | ₹13,862.24 |
| 7 | Carriage of Bricks | 9,000.8 | NO | 1.09 | ₹9,810.87 |
| 8 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 334.16 | Kgs | 120 | ₹40,098.96 |
| 9 | Add provision for Signboard /Photograph charges | 1 | NO | 1,100 | ₹1,100 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_1096097.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .